
Specialist electrical contractor for electrical installation, photovoltaics, charging stations and security technology in the Rhineland.
Absolut Elektro GmbH
BrühlNew on Amplifa
Who we are
Absolut Elektro GmbH, formerly I.C.H. Komm GmbH, was founded in Cologne in 2003 and operates as a specialist electrical contractor in the Rhineland. Its service portfolio covers electrical installation in new builds and existing buildings, photovoltaic installations, charging stations for electric vehicles, security technology and E-Check inspections. In the photovoltaics segment, the company offers consulting, site analysis, concept development, assembly, installation and maintenance from a single source, including battery storage systems, storage retrofits, system extensions and tenant electricity solutions. As an E3/DC Premium Partner, the company installs home power stations with inverters, battery storage and intelligent energy management, as well as components from manufacturers such as Sungrow, myenergi, Trina Solar, JA Solar, K2, Tigo and easee. Customers include single-family homes, multi-family houses and commercial properties in Brühl, Cologne, Bonn and the surrounding area. Since 2025, the company headquarters has been located on the ground floor with larger offices and a warehouse in Brühl.
- Site
- Brühl
- Processes
- Electrical installation, Photovoltaic installation (rooftop mounting), Installation of charging stations/wallboxes, Security technology installation and maintenance, Testing and repair of electrical systems (E-Check), Installation of battery storage systems / storage retrofits, Expansion of existing photovoltaic systems, System planning/consulting and PV concept development (including power optimization with Tigo)
- Materials
- Monocrystalline high-performance modules (Trina Solar, 445 Wp, glass-glass), Bifacial N-type modules (JA Solar, 435 Wp, glass-glass), Lithium-ion battery storage, Lithium-ion battery storage systems, Hybrid inverters (e.g. Sungrow, 3-phase, 15 kW AC), E3/DC home power station (e.g. S10 X Compact 14), K2 SingleRail mounting system, Power optimizers (Tigo)
- Certificates
- Premium E branded business, E3/DC Premium Partner
- Founded
- 2003
- Industries
- Private customers/single-family homes, Multi-family houses, Commercial properties
- 01
Consulting and site analysis
- 02
Concept development and profitability calculation
- 03
Preparation of quotations
- 04
Assembly and installation
- 05
Maintenance and E-Check
Modules and Components
Monocrystalline high-performance modules (Trina Solar, 445 Wp, glass-glass)
Used for rooftop photovoltaic systems on pitched roofs with an elegant appearance.
Bifacial N-type modules (JA Solar, 435 Wp, glass-glass)
Highly efficient modules with a 25-year product warranty and a 30-year performance warranty.
Lithium-ion battery storage systems
Storage of solar power to increase self-consumption and the degree of energy autonomy.
Hybrid inverters (e.g. Sungrow, 3-phase, 15 kW AC)
Coupling of PV modules and battery storage with SGready interface.
E3/DC home power station (e.g. S10 X Compact 14)
All-in-one system with inverter, storage, energy management and backup power function.
K2 SingleRail mounting system
Stable substructure for mounting PV modules on pitched roofs.
Power optimizers (Tigo)
Minimization of yield losses caused by shading and monitoring of module performance.
Wallboxes (E3/DC, myenergi zappi, easee)
Charging stations for electric vehicles with PV surplus charging.
Locations

Brühl
DEHeadquarters, office and warehouse
- Office and warehouse space
Projects and References





Inside the production






Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Electrical installationAssembly | – | – | – | – | – |
| Photovoltaic installation (rooftop mounting)Assembly | – | – | – | – | Monocrystalline PV modules, bifacial PV modules (N-type), glass-glass modules |
| Installation of charging stations/wallboxesAssembly | – | – | – | – | – |
| Security technology installation and maintenanceAssembly | – | – | – | – | – |
| Testing and repair of electrical systems (E-Check)Testing | – | – | – | – | – |
| Installation of battery storage systems / storage retrofitsAssembly | – | – | – | – | Lithium-ion battery storage |
| Expansion of existing photovoltaic systemsAssembly | – | – | – | – | – |
| System planning/consulting and PV concept development (including power optimization with Tigo)Engineering | – | – | – | – | – |
11 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| PV power station (all-in-one: inverter, battery storage, energy management) | E3/DC S10 X Compact 14 | – | – | – | Hürth / Cologne (projects) |
| Hybrid inverter (3-phase, 15 kW AC) | Sungrow | – | – | – | Brühl |
| Battery storage (10 kWh, modular) | Sungrow | – | – | – | Brühl |
| Battery storage (AC-coupled, 10 kWh, charge/discharge power 4.6 kW) | myenergi libbi | – | – | – | Bonn |
| Wallbox (charging station) | E3/DC Multi Connect II | – | – | – | Hürth, Cologne, Bornheim, Andernach (projects) |
| Wallbox (charging station) | myenergi zappi | – | – | – | Brühl, Neunkirchen-Seelscheid, Düsseldorf (projects) |
| Wallbox (charging station) | easee Charge | – | – | – | Cologne (projects) |
| PV modules (445 Wp, monocrystalline, glass-glass) | Trina Solar | 43 (proje | – | – | Brühl |
| PV modules (435 Wp, bifacial, N-type) | JA Solar | 41 (proje | – | – | Hürth |
| PV mounting system (substructure) | K2 SingleRail | – | – | – | Hürth, Brühl |
| Power optimizer | Tigo | – | – | – | Cologne |
Additional services
Quality and Certification
Absolut Elektro GmbH is registered as a Premium E branded business. Quality is ensured through membership as a certified specialist company, trained personnel (including specific training on E3/DC power stations) and tested components from leading manufacturers.
| Evidence | Brühl |
|---|---|
| Premium E branded business | |
| E3/DC Premium Partner |
History
- 2003
Founded as I.C.H. Komm GmbH in Cologne
- 2022
Renamed to Absolut Elektro / new brand Absolut Elektro
- 2025
Relocation within the building in Brühl to the ground floor with larger offices and warehouse