
Adenatec plans and builds photovoltaic systems, charging infrastructure for electromobility, ZEV (self-consumption associations) and building automation as turnkey complete solutions.

Adenatec AG
6277 Kleinwangen (Headquarters)New on Amplifa
About us
Adenatec AG, based in Kleinwangen in the canton of Lucerne, is a Swiss owner-managed company for renewable energies and building technology. Its offering covers consulting, planning and construction of photovoltaic systems, charging infrastructure for electromobility (e-mobility), building automation as well as ZEV (self-consumption association) and VEWA. This is complemented by load management (dynamic, e.g. Zaptec APM), automated ancillary cost billing for charging stations, as well as service and commissioning with instruction and acceptance protocol. Projects are accompanied from concept through to turnkey handover and ongoing operation, with a single point of contact available. Customers are property owners and management companies of multi-family buildings, electricians and planners, commercial enterprises, the gastronomy sector and municipalities. The company relies exclusively on renewable energies and combines photovoltaics, electromobility, ZEV and billing into an economical complete solution.
- Site
- Kleinwangen
- Processes
- Consulting, planning and construction of photovoltaic systems, Consulting, planning and construction of charging infrastructure for electromobility, Consulting, planning and construction of building automation, Consulting, planning and construction of ZEV (self-consumption association), Installation of charging stations (wall mounting, ceiling mounting, Premium Column), load, Service and billing (ancillary cost billing, VEWA) for charging infrastructure, Charging infrastructure for electromobility (e-mobility), ZEV (self-consumption association) / VEWA
- Materials
- Photovoltaic systems, Charging infrastructure electromobility, ZEV / VEWA, Building automation
- Certificates
- Warranty period 2 years from commissioning
- Industries
- Property owners / multi-family buildings, Real estate management companies, Electricians and planners, Commerce / business owners, Gastronomy (restaurants), Municipalities (municipal councils)
- 01
Consulting
- 02
Planning
- 03
Construction
- 04
Installation and commissioning with instruction and acceptance protocol
- 05
Service and billing during ongoing operation
Services and solutions
Photovoltaic systems
Consulting, planning and construction of PV systems for multi-family buildings and commercial customers.
Charging infrastructure electromobility
Planning and installation of charging stations (wall, ceiling and pole mounting) with integrated load management.
ZEV / VEWA
Self-consumption association and ancillary cost billing for properties.
Building automation
Consulting, planning and construction of building automation.
Locations
Kleinwangen
CHHeadquarters
- Materials
- Photovoltaics, e-mobility, ZEV, building automation
Solutions


Inside the production


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Consulting, planning and construction of photovoltaic systemsEngineering | – | – | – | – | – |
| Consulting, planning and construction of charging infrastructure for electromobilityEngineering | – | – | – | – | – |
| Consulting, planning and construction of building automationEngineering | – | – | – | – | – |
| Consulting, planning and construction of ZEV (self-consumption association)Engineering | – | – | – | – | – |
| Installation of charging stations (wall mounting, ceiling mounting, Premium Column), loadAssembly | – | – | – | – | – |
| Service and billing (ancillary cost billing, VEWA) for charging infrastructureEngineering | – | – | – | – | – |
Additional services
Quality
The work is carried out professionally and in accordance with the state of the art; each service is accepted with instruction and an acceptance protocol. Unless otherwise agreed, the warranty period is 2 years from commissioning.
| Evidence | Kleinwangen |
|---|---|
| Warranty period 2 years from commissioning |
History
- 2021
Publication of the brochure «E-Mobility Solutions – Product Information» on charging infrastructure with load management, PV integration and billing.
- 2022
Update of the General Terms and Conditions (as of 21 October 2022).