Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
AEG IE AG – Fertigung

Electrical systems for industry, energy supply and transportation: engineering, switchgear cabinet construction, spare parts and worldwide service

AEG IE AG Logo

AEG Industrial Engineering Aktiengesellschaft

BerlinNew on Amplifa

1883Founding of Deutsche Edison Gesellschaft (DEG), predecessor
1887Renamed to AEG
1969Merger of the power plant activities of Siemens and
BerlinCompany headquarters Hohenzollerndamm 152
up to 1200 MVAStatic excitation systems (SEE)

About AEG Industrial Engineering

AEG Industrial Engineering Aktiengesellschaft is an electrical systems company headquartered at the traditional AEG site on Hohenzollerndamm in Berlin. The company operates as the successor to the industrial activities division of the former AEG Group and continues the spare parts and modernization service for existing AEG installations. The core fields include power generation and energy technology, drive and plant engineering as well as components, maintenance and service. The range of services extends from generator systems with diesel and gas engines up to 55 MVA, static excitation systems (SEE) for generators from 20 to 1200 MVA and starting frequency converters for gas turbine power plants, through low-voltage, medium-voltage and high-voltage switchgear, to Thyro-family thyristor power controllers and transformer and UPS supplies. In addition, basic engineering, design with EPLAN, PLC programming, switchgear cabinet construction, installation and commissioning worldwide as well as CE conformity assessment are offered. Customers come from power plant and energy technology, steelworks (arc furnaces), electrolysis, railway technology, shipping and IT.

Site
Berlin
Processes
Engineering, planning, commissioning and maintenance of generator systems, Power generation systems with diesel and gas engines as emergency power or power plant up to 55 MVA, Generator systems for gas and steam turbines, Static excitation systems (SEE) for generators from 20 MVA to 1200 MVA, Conversion of rotating exciter machines to static converters, Starting frequency converters (SFC) for gas turbine power plants or combined-cycle power plants, Converters for the control of pumped storage plants, Digital excitation devices for synchronous generators and motors from 2 MW to 50 MW
Materials
No manufacturing materials named (pure electrical engineering/plant company), Thyristor power controllers (Thyro-A, Thyro-S, Thyro-PX), Switchgear devices (LTSIST, LS 4–LS 307, MBS, ME, GERAPID), Static excitation systems (SEE), Starting frequency converters (SFC)
Certificates
DIN EN ISO 9001, ISO 9001 (DIN EN ISO 9001)
Industries
Power plant and energy technology, Energy industry, Industry, Steelworks (arc furnaces), Electrolysis, Railway technology
  1. 01

    Consulting and project management

  2. 02

    Basic engineering and design (EPLAN)

  3. 03

    Software engineering and PLC programming

  4. 04

    Switchgear cabinet construction

  5. 05

    Delivery of systems and components

  6. 06

    Installation and commissioning

  7. 07

    Supervision and trial run

  8. 08

    After-sales service: spare parts, repair, maintenance, training

Services and system components

Thyro

Thyristor power controllers (Thyro-A, Thyro-S, Thyro-PX)

Switching, controlling and regulating electrical power for applications such as melting, heating, drying and forming, available for 500 V and 690 V.

LS

Switchgear devices (LTSIST, LS 4–LS 307, MBS, ME, GERAPID)

Fuse switch disconnectors, contactors, motor protection and power circuit breakers as well as DC high-speed circuit breakers as core building blocks of switchgear installations.

SEE

Static excitation systems (SEE)

Static converters for synchronous generators and motors from 20 MVA to 1200 MVA, including conversion of rotating exciter machines.

SFC

Starting frequency converters (SFC)

Converters for starting gas turbine and combined-cycle power plants as well as for controlling pumped storage plants.

Locations

Standort Berlin-Hohenzollerndamm

Berlin-Hohenzollerndamm

DE

Headquarters and sales center

Materials
Electrical engineering: switchgear installations, switchgear cabinets, power controllers
  • Switchgear cabinet construction SEV 32
  • ESS building control
  • Engineering with EPLAN
  • PLC programming

Components and systems

Thyro-family thyristor power controllers
Thyro-family thyristor power controllersPower electronics · Industry
Thyro-A power controller
Thyro-A power controllerPower electronics · Process industry
Switchgear technology
Switchgear technologySwitchgear construction · Energy industry
Switchgear cabinet construction
Switchgear cabinet constructionSwitchgear cabinet construction · Industry
Switchgear devices/components
Switchgear devices/componentsComponents · Energy technology
AEG nameplate
AEG nameplateSpare parts service · Power plants

Inside the production

Transformer shipping
Transformer shipping
Transformer in test setup
Transformer in test setup
Generator room of a power plant
Generator room of a power plant
110-kV switchgear (GIS)
110-kV switchgear (GIS)
Commissioning of systems
Commissioning of systems
Worldwide spare parts service
Worldwide spare parts service
Repair
Repair
Plant construction (SVC)
Plant construction (SVC)
AEG history
AEG history

Industries

Power plant and energy technologyEnergy industryIndustrySteelworks (arc furnaces)ElectrolysisRailway technologyShippingIT (UPS)Power generation/power plantsTransportationSteelworks (arc furnaces/EAF)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Engineering, planning, commissioning and maintenance of generator systemsEngineering–––––
Power generation systems with diesel and gas engines as emergency power or power plant up to 55 MVAEngineering––55 MVA––
Generator systems for gas and steam turbinesEngineering–––––
Static excitation systems (SEE) for generators from 20 MVA to 1200 MVAEngineering––20 MVA – 1200 MVA––
Conversion of rotating exciter machines to static convertersEngineering–––––
Starting frequency converters (SFC) for gas turbine power plants or combined-cycle power plantsEngineering–––––
Converters for the control of pumped storage plantsEngineering–––––
Digital excitation devices for synchronous generators and motors from 2 MW to 50 MWEngineering––2 MW – 50 MW––
Delivery of low-voltage and medium-voltage switchgear as well as high-voltage technology;Assembly–––––
Delivery of factory-finished standard switchgear cabinets and type-tested motor control cabinetsAssembly–––––
Switchgear cabinet construction (control boxes, switchgear cabinets up to complex systemAssembly–––––
Basic engineering, design, circuit diagram/schematic creation with EPLAN, specifications andEngineering–––––
Software engineering and PLC programming (also for SIEMENS systems), plant visualizationEngineering–––––
Installation and commissioning of systems worldwide, trial runs and supervisionAssembly–––––
Spare parts delivery, repair, commissioning, maintenance, training for all industrialAssembly–––––
High and low voltage compensation systems (reactive power compensation)Assembly–––––
Delivery of transformers and transformer serviceAssembly–––––
Delivery of UPS systems (static and dynamic) and power distribution systemsAssembly–––––
Delivery of arc furnace power supplies and electrolysis high-current systems (EAF electrical systemsAssembly–––––
Active and reactive power optimization up to 250 MWEngineering––250 MW––
CE conformity assessment, risk assessment according to EN 13849-1 (SISTEMA, Performance Level)Testing–––––
Integration of new and used machines into existing systems, plant conversionsAssembly–––––

2 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Thyristor power controllersAEG Thyro-A 1A/2A/3A H 3/H RL3/H RLP3; Thyro-S 1S/2S/3S H 3/H RLP3; Thyro-PX––––
Contactors / switch disconnectors / circuit breakers (switchgear devices)AEG LTSIST fuse switch disconnectors; LS 4 to LS 307 contactors; MBS motor––––

Additional services

Consulting, engineering and delivery of new systems, conversions and modernizationsWorldwide spare parts deliveryRepair serviceCommissioning and maintenanceTraining/instructionBasic engineering and design (EPLAN, switchgear cabinet construction)PLC programming and software engineeringCE marking and conformity assessmentInstallation and commissioning worldwideSupervision and trial runAfter-sales service for AEG systems (Kanis turbines, transformers, switchgear)Conversion of rotating exciter machines to static convertersEnergy saving consulting for pump/fan drives

Quality

The Thyro products meet product quality according to DIN EN ISO 9001; for plant conversions, a CE conformity assessment including risk assessment according to EN 13849-1 (SISTEMA, Performance Level) is carried out.

EvidenceBerlin
ISO 9001 (DIN EN ISO 9001)

History

  1. 1883

    Founding of the Deutsche Edison Gesellschaft (DEG) by Emil Rathenau, predecessor of AEG

  2. 1885

    Commissioning of Germany's first public power station on Markgrafenstraße in Berlin

  3. 1887

    Renaming of DEG to AEG (Allgemeine Elektricitäts-Gesellschaft); AEG has since delivered power plants worldwide

  4. 1891

    First long-distance transmission of electrical energy with three-phase current from Lauffen am Neckar to Frankfurt am Main using an AEG system

  5. 1895

    Construction of Germany's first three-phase power plant, the Oberspree power station

  6. 1969

    Merger of the power plant activities of Siemens and AEG to form KWU

  7. AEG Industrial Engineering was founded as the successor to the industrial activities division of the former AEG Group and continues the spare parts and modernization service at the traditional AEG site on Hohenzollerndamm

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo