Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Agraferm – Fertigung

Planning, construction and operation of biogas, biomethane and waste recovery plants with high substrate flexibility

Agraferm Logo

Agraferm GmbH

Pfaffenhofen an der IlmNew on Amplifa

1991First BTA® plant commissioned
140Plant locations worldwide
over 100References in around 20 countries
up to 15 %Dry matter in the fermentation process
up to 15 MW el.Power generation

About Agraferm

Agraferm plans and builds biogas, biomethane and waste recovery plants for feedstocks from agriculture, municipalities and industry. The group, headquartered in Pfaffenhofen an der Ilm, offers turnkey complete plants including planning, project management, commissioning, service and plant operation. The core of the plants is the high-performance fermentation process with up to 15 percent dry matter, which enables smaller tank volumes and a low footprint. For the anaerobic digestion of solid, inhomogeneous substrates such as biowaste and household waste, the wet-mechanical BTA® process is used for the separation of interfering materials. Through subsidiaries such as BTA International GmbH, more than 100 reference plants have been implemented in around 20 countries; the BTA plants generate over 200 million standard cubic meters of biogas per year. Since 2014, Agraferm has built more than 20 plants with over 2 million tons of treatment capacity, most recently with annual throughputs of up to 180,000 tons.

Site
Pfaffenhofen an der Ilm
Processes
Planning of biogas and biomethane plants (site selection, plant concept, mass and, Plant construction and commissioning of biogas plants incl. project management, Anaerobic digestion (fermentation) with high dry matter content (up to 15 % DM), Wet-mechanical pretreatment (BTA® process, separation of interfering materials), Reception of feedstocks, Biogas line (gas collection and utilization), Biomethane upgrading and grid feed-in, Solid/liquid separation (dewatering/digestate treatment)
Materials
Straw (cereal straw, wheat straw), Energy crops (maize, rye, beets), Solid and liquid manure (among others poultry manure), Biowaste, Household waste, Food & kitchen waste, Wastewater/ liquid waste, Commercial waste
Certificates
Process guarantee (gas yield), Mass and energy balance
Industries
Biogas plant construction, Biomethane plants, Waste recovery plants, Agriculture, Municipalities and waste disposal, Biofuel industry
  1. 01

    Site selection and plant concept

  2. 02

    Mass and energy balance

  3. 03

    Planning and engineering

  4. 04

    Plant construction and project management

  5. 05

    Commissioning

  6. 06

    Service, after sales and plant operation

Feedstocks and Processes

AF-FERM

High-Performance Fermentation Process

Anaerobic digestion with up to 15 % dry matter at a smaller tank volume than usual plant concepts.

BTA®

Wet-Mechanical Pretreatment (BTA® Process)

Separation of interfering materials during the digestion of biowaste, household and mixed waste as well as commercial waste.

AF-RW

Vertical Paddle Agitator (In-House Design)

Speed-controlled agitators at 8–9 rpm for laminar mixing with reduced energy input and wear.

AF-STROH

Mechanical Straw Pretreatment

Improves the digestibility of straw as a substrate in agricultural biogas plants.

AF-GAS

Biomethane Upgrading and Grid Feed-In

Upgrading of raw gas to biomethane for grid feed-in, even without subsidy measures.

ORC

ORC and Additional Power Generation

Steam generation from waste heat and additional power generation to expand gas utilization.

Location

Standort Pfaffenhofen an der Ilm

Pfaffenhofen an der Ilm

DE

Headquarters, engineering and sales

  • Construction and engineering
  • Automation and electrical engineering

Plant Components

Vertical Paddle Agitator
Vertical Paddle AgitatorIn-house design · Fermenter equipment
Fermenters and Gas Treatment
Fermenters and Gas TreatmentBiogas plant construction · Biogas production

Inside the production

Methwold biogas plant, United Kingdom
Methwold biogas plant, United Kingdom
Reference plants worldwide
Reference plants worldwide

Industries

Biogas plant constructionBiomethane plantsWaste recovery plantsAgricultureMunicipalities and waste disposalBiofuel industry

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Planning of biogas and biomethane plants (site selection, plant concept, mass andEngineering––––Energy crops, Agricultural residues, Biowaste, Household and mixed waste, Food waste, Slaughterhouse waste, Waste from food production, Stillage, Pulp, Press cake, Straw
Plant construction and commissioning of biogas plants incl. project managementEngineering–––––
Anaerobic digestion (fermentation) with high dry matter content (up to 15 % DM)Engineering–––2,000 t/a – 180,000 t/aEnergy crops, Solid and liquid manure, Agricultural residues, Biowaste, Straw, Food & kitchen waste, Wastewater/ liquid waste, Commercial waste
Wet-mechanical pretreatment (BTA® process, separation of interfering materials)Engineering––––Biowaste, Household waste, Commercial waste, Food & kitchen waste, Food industry residues
Reception of feedstocksEngineering–––––
Biogas line (gas collection and utilization)Engineering–––––
Biomethane upgrading and grid feed-inEngineering–––––
Solid/liquid separation (dewatering/digestate treatment)Engineering–––––
Hygienization (full-flow sanitization after digestion)Engineering–––––
Mechanical straw pretreatment (Straw pre-treatment line)Engineering––––Straw
Gas utilization: ORC (steam generation from heat) and additional power generationEngineering–––––
Service & after sales as well as operation of biogas plantsEngineering–––––
Automation and electrical engineering (sensors, automatic agitator control)Engineering–––––

3 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Vertical paddle agitator (in-house design, 8-9 rpm, speed-controlled)Agraferm–Fermenters up to 11 m high, 3,300 / 5,800 / 5,500 m³–Pfaffenhofen / Mepal UK
Gas upgrading plantPentair–––Gonerby Moor UK
Fermenter (concrete, walkable roof)Agraferm–e.g. 2 x 5,500 m³ fermenters + 6,000 m³ post-digester–Gonerby Moor UK

Quality and Process Guarantee

Agraferm assumes responsibility for the entire process and guarantees process technology and maximum gas yield; the on-schedule completion of all plants is contractually assured. Transparency and verifiability of the process guarantees are ensured through the documented mass and energy balance.

EvidencePfaffenhofen an der Ilm
Process guarantee (gas yield)
Mass and energy balance

History

  1. 1991

    Commissioning of the first biowaste digestion plant using the BTA® process

  2. 2014

    Start of implementing plants with over 2 million tons of treatment capacity

  3. 2025

    Construction of plants with an annual throughput of up to 180,000 tons

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo