AI software for quality prediction and control for cement plants and ready-mix concrete plants.
alcemy GmbH
BerlinNew on Amplifa
About alcemy
The alcemy GmbH is a software and AI company from Berlin that develops quality prediction and control for the cement and concrete industry. The company offers two solutions for the entire value chain: "alcemy for Cement
- Site
- Berlin
- Processes
- AI-supported quality prediction and control for cement plants, Real-time quality monitoring for ready-mix concrete (including sensors for truck mixers), Recipe optimization, Data infrastructure/Unified Data Backbone (Foundation Partnership), Implementation, configuration and on-site training, Co-development partnership with mentoring and change management
- Materials
- Cement, Concrete (Ready-mix/Ready-Mix Concrete), Clinker, Blast furnace slag (for pure slag grinding), Blast furnace slag, Ready-mix concrete
- Industries
- Cement industry, Ready-mix concrete industry
- 01
Data connection to existing systems (PLC, SCADA, LIMS, SAP, MES, sensors)
- 02
Configuration of the AI models for the plant
- 03
Training and onboarding of plant staff
- 04
AI-supported quality prediction and recipe optimization
- 05
Closed-loop control or real-time alerts during operation
- 06
Optional setup of a unified data backbone (Foundation Partnership)
Applications and materials
Cement
AI-based strength prediction and mill optimization for cement and slag grinding.
Clinker
Reduction of the clinker factor without loss of quality for decarbonization.
Blast furnace slag
Coverage of separate grinding lines and pure slag grinding operations.
Ready-mix concrete
Real-time monitoring of consistency from the batching plant to the construction site.
Location
Berlin
DEHeadquarters
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Testing | – | – | – | – | Cement, Clinker, Blast furnace slag (slag grinding) |
| Testing | – | – | – | – | Ready-mix concrete, Concrete |
| Engineering | – | – | – | – | – |
Additional services
Reference customers
History
- ca. 2018
Start of operations; according to the website, eight years of real-time AI control have been operated since then and no customer has been lost.
- 2026
Strategic partnership with ABB to integrate alcemy AI into Advanced Process Control and Plant Information Management; according to its own statements, more than one third of cement customers operate the technology in closed loop.
- 2026
Launch of the alcemy Foundation Partnership (autumn 2026) with a roadmap for autonomous mill and recipe control; >45 cement plants, >160 concrete plants in 18 countries.
Completion of a financing round of more than 10 million euros; rollout in 35 RMX plants in Portugal by the customer Molins.