
Electrical installation, cable trench construction, lighting systems and photovoltaics as a complete solution from Schenefeld near Hamburg

Arendt Elektroanlagen GmbH & Co. KG
Schenefeld (Altonaer Chaussee 89)New on Amplifa
About Arendt Elektroanlagen
Arendt Elektroanlagen GmbH & Co. KG is an owner-managed electrical company founded in 1963 and headquartered in Schenefeld near Hamburg. Its portfolio covers electrical installation for new buildings, existing buildings and renovation, office and shop fitting installation, cable trench construction with the laying of cables and cable protection pipes including breaking up and restoring surfaces, as well as maintenance, repair and new construction of street lighting systems, industrial and floodlight systems and traffic systems. Since 2023 there has been a dedicated photovoltaics team that handles projects from 4.62 kWp to 79.80 kWp from planning through roof installation to commissioning. In addition, E-Checks, measurements according to DGUV3 as well as data and antenna measurements are offered, and a cherry picker rental service including operating personnel is provided. The family-run company employs almost 80 staff and serves customers in Schenefeld, Hamburg and the surrounding area as well as in the commercial, municipal and private sectors.
- Site
- Schenefeld
- Processes
- Electrical installation (building technology, residential installation, shop fitting), Photovoltaic system installation (planning, roof installation, connection, commissioning, projects, Cable trench construction (laying of cables and cable protection pipes, breaking up and restoring, Installation of lighting systems (industrial lighting systems, street lighting systems,, E-Check, measurements according to DGUV3, data and antenna measurements, Maintenance and repair work on electrical systems, Consulting, planning and concept development of electrical installations, Cherry picker rental including operating personnel
- Materials
- Photovoltaic Systems, Electrical Installation, Cable Trench Construction, Lighting and Traffic Systems
- Certificates
- DIN EN ISO 9001, ISO 9001
- Founded
- 1963
- Employees
- almost 80
- Industries
- Residential Construction, Commercial/Businesses, Municipalities, Industry
- 01
Consulting
- 02
Planning and Concept Development
- 03
Detailed Planning and Coordination
- 04
Installation/Execution
- 05
Testing (E-Check, DGUV3 Measurements)
- 06
Maintenance and Repair
Services and Processes
Photovoltaic Systems
Complete solution from planning through roof installation and authority approvals to connection and commissioning.
Electrical Installation
Technical equipment of buildings for new construction, existing buildings, renovation and shop fitting.
Cable Trench Construction
Underground laying of cables and cable protection pipes including surface restoration.
Lighting and Traffic Systems
Maintenance, repair and new construction of street lighting, floodlighting and industrial systems.
Locations
Schenefeld
DEHead office with office and administration
Service Areas




Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Electrical installation (building technology, residential installation, shop fitting)Assembly | – | – | – | – | – |
| Photovoltaic system installation (planning, roof installation, connection, commissioning, projectsAssembly | – | – | 79.80 kWp | 4.62 kWp – 79.80 kWp | – |
| Cable trench construction (laying of cables and cable protection pipes, breaking up and restoringAssembly | – | – | – | – | – |
| Installation of lighting systems (industrial lighting systems, street lighting systems,Assembly | – | – | – | – | – |
| E-Check, measurements according to DGUV3, data and antenna measurementsTesting | – | – | – | – | – |
| Maintenance and repair work on electrical systemsAssembly | – | – | – | – | – |
| Consulting, planning and concept development of electrical installationsEngineering | – | – | – | – | – |
| Cherry picker rental including operating personnelAssembly | – | – | – | – | – |
Additional services
Quality
The company is certified according to DIN EN ISO 9001. Tests include regular E-Checks as well as measurements according to DGUV3 and data and antenna measurements.
| Evidence | Schenefeld |
|---|---|
| ISO 9001 |
History
- 1963
Erich Arendt takes over the business from the company Albert Körner at Sülldorfer Weg 84 and renames it Erich Arendt Elektroinstallationen.
- 1968
Purchase of the property at Hauptstraße 53 in Schenefeld.
- 1989
Jürgen Arendt joins the company as managing director.
- 1991
Enlargement of the office space.
- 1992
Renaming to Arendt Elektroanlagen OHG.
- 2001
Conversion to Arendt Elektroanlagen GmbH & Co. KG.
- 2010
Lars Ginnel becomes second managing director.
- 2020
Relocation in February to Altonaer Chaussee 89, 22869 Schenefeld.
- 2023
Establishment of an in-house photovoltaics team; project configurations from 4.62 kWp to 79.80 kWp.