
Limestone and dolomite chippings from our own quarries for asphalt, concrete, gabions and disposal.
Bärnreuther+Deuerlein Schotterwerke GmbH & Co. KG
Postbauer-Heng · Gräfenberg · Velburg (Weickenhof) · Berg (Langenthal) · Simmelsdorf (Oberachtel) · Pilsach (Laaber) · Simmelsdorf (Oberndorf) · Schnaittach (Hormersdorf) · RaindorfNew on Amplifa
About Bärnreuther+Deuerlein Schotterwerke
Bärnreuther+Deuerlein Schotterwerke is a family-owned company in the Nuremberg metropolitan region that has been producing chippings from limestone and dolomite since 1933. In five active quarries in the Upper Palatinate and Middle Franconia, the rock is processed by drilling, blasting, crushing and screening into chipping products for asphalt and concrete; gradation curves are possible on request. The range comprises four areas: chippings, disposal of stones and soils including contaminated soils as a certified specialist disposal company, factory- and hand-filled gabions, and transport with an own fleet of around 80 trucks. In-house production control takes place in the company's own testing laboratory at the Weickenhof site with external monitoring by the Technical University of Munich (MPA BAU). Around 170 employees produce and deliver mainly in the Nuremberg metropolitan region. The company is headquartered in Postbauer-Heng; technical operations management and purchasing are located in Gräfenberg.
- Site
- Postbauer-Heng
- Processes
- Drilling, Blasting, Crushing, Screening, Production of chippings for asphalt and concrete (gradation curves on request), Gabion production (factory-filled and hand-filled), Disposal of stones and soils (certified specialist disposal company, contaminated soils), Transport (own fleet, heavy transport)
- Materials
- Limestone, Dolomite, Galfan wire with aluminum/zinc coating (gabion baskets), Galfan wire (aluminum/zinc coating)
- Certificates
- Gabion quality mark (RAL-recognized), Voluntary product monitoring (in-house production control), Specialist disposal company (certification), Gabion quality mark (RAL-recognized, GfG), Voluntary product monitoring TU Munich MPA BAU, Certified specialist disposal company
- Founded
- 1933
- Employees
- 170
- Industries
- Construction industry (asphalt, concrete), Civil engineering/infrastructure, Landscaping and gardening, Disposal, Civil engineering/infrastructure (rail line Erlangen–Forchheim)
- 01
Raw material extraction (drilling, blasting)
- 02
Crushing
- 03
Screening and processing
- 04
Storage and shipping
- 05
Transport and logistics
- 06
Quality testing (WPK laboratory)
Materials and Processing Methods
Limestone
Extracted in the company's own quarries and processed into chippings for asphalt and concrete.
Dolomite
Hard carbonate rock from the quarries, used among other things for construction and gabion products.
Galfan wire (aluminum/zinc coating)
Corrosion-protected wire for gabion baskets in factory-filled, hand-filled and kit versions.
Quarries and Locations

Postbauer-Heng (Dillberg Administration)
DECompany headquarters: commercial administration, sales, dispatch planning
Gräfenberg (Plant 5)
DEAdministration and chipping plant: purchasing, technical operations management
- Materials
- Limestone

Velburg-Oberwiesenacker (Plant 1 Weickenhof)
DEQuarry with chipping plant and testing laboratory
- Materials
- Limestone
- Testing laboratory (WPK)
Berg-Langenthal (Plant 2)
DEQuarry, opened as needed
- Materials
- Limestone, Dolomite
Simmelsdorf-Oberachtel (Plant 3)
DEQuarry with rock extraction over 100 m in height (limestone and dolomite)
- Materials
- Limestone, Dolomite
- Primary crushing plant
- Crushing and screening plant
Pilsach-Laaber (Plant 4)
DELimestone and dolomite quarry with chipping plant on the B299
- Materials
- Limestone, Dolomite
- Chipping plant (crushing and screening plant)
- Electric wheel loader CAT 988 KXE
Simmelsdorf-Oberndorf (Plant 6)
DELimestone quarry, opened only as needed
- Materials
- Limestone
Schnaittach-Hormersdorf (Plant 7)
DEDolomite quarry on the A9 motorway
- Materials
- Dolomite

Raindorf (Bärnreuther Transport GmbH)
DETransport site for integrated transport businesses
Products



Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| DrillingExtraction (quarry) | – | – | – | – | Limestone, Dolomite |
| BlastingExtraction (quarry) | – | – | – | – | Limestone, Dolomite |
| CrushingExtraction (quarry) | – | – | – | – | Limestone, Dolomite |
| ScreeningProcessing | – | – | – | – | Limestone, Dolomite |
| Production of chippings for asphalt and concrete (gradation curves on request)Processing | – | – | – | – | Limestone, Dolomite |
| Gabion production (factory-filled and hand-filled)Assembly | – | – | – | – | Limestone, Dolomite, Galfan wire (aluminum/zinc coating) |
| Disposal of stones and soils (certified specialist disposal company, contaminated soils)Disposal | – | – | – | – | Excavated soil, Contaminated soils |
| Transport (own fleet, heavy transport)Logistics | – | – | – | – | – |
| Testing | – | – | – | – | Limestone, Dolomite |
5 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Electric wheel loader | CAT 988 KXE | – | – | – | Laaber |
| Primary crushing plant | – | – | – | – | Oberachtel |
| Crushing and screening plant | – | – | – | – | Oberachtel |
| Chipping plant (crushing and screening plant) | – | – | – | – | Laaber |
| Testing laboratory | – | – | – | – | Weickenhof |
Additional services
Quality Assurance
In-house production control (WPK) with its own testing laboratory at the Weickenhof site continuously monitors all products; the voluntary product monitoring is carried out by the Technical University of Munich (MPA BAU). The Laaber plant carries the RAL-recognized quality mark for gabions of the GfG.
| Evidence | Pilsach-Laaber |
|---|---|
| Gabion quality mark (RAL-recognized, GfG) | |
| Voluntary product monitoring TU Munich MPA BAU | |
| Certified specialist disposal company |
History
- 1933/1934
Start of chipping production at Dillberg for the Nuremberg surrounding area; annual production 2,000–4,000 t
- 1960
Weickenhof quarry goes into operation
- 2010
Merger of the companies Bärnreuther, Deuerlein and Thomas to form Bärnreuther+Deuerlein Schotterwerke GmbH & Co. KG; consolidation of the quarries Gräfenberg, Hormersdorf, Laaber, Langenthal, Oberachtel, Oberndorf and Weickenhof
- 2018
Christian Hepler takes over the disposal division, Anna Bärnreuther the HR division; first participation in the Jobmeile Neumarkt
- 2019–2020
Rail line Erlangen–Forchheim: approx. 800,000 t delivered and disposed of; conversion of the Gräfenberg chipping plant; gabion quality mark for the Laaber plant
- 2021
Completion of the conversion of the Oberachtel quarry (among other things new primary crushing plant); commissioning of the Laaber chipping plant; electric wheel loader CAT 988 KXE
- 2023
Integration of employees, vehicles and the transport business of Breitenbach Tech GmbH into Bärnreuther Transport GmbH as of 01.04.2023; new site Raindorf; death of company founder Georg Bärnreuther sen.