
Control cabinet construction, building automation as well as electrical, heating, ventilation, air conditioning and plumbing technology from Lödla
Bauer und Co. GmbH
04617 Lödla (Headquarters)New on Amplifa
About BAUER
Bauer und Co. GmbH is a master electrician business based in Lödla (Altenburger Land), founded in 1931 and now run by the third generation. In its own control cabinet construction department, the company manufactures custom control cabinets and switchgear assemblies for commercial and industrial customers, including circuit diagram creation, CAD design, software development and wiring to DIN and VDE standards. In addition to automation, the service portfolio includes photovoltaics (planning, installation, grid connection), electrical installation, heating, ventilation, air conditioning and plumbing installation, as well as building automation and measurement and control (MSR) technology. A central control system has enabled fault analysis and troubleshooting via remote access since 1993; service and maintenance services including a 24-hour emergency breakdown service round off the offering. The company also manufactures switchgear assemblies internationally, with documented projects in Brazil, France and Russia. Since 2020, Bauer und Co. GmbH has been part of the SOJKA Group, a network of five automation companies with more than 100 employees at five locations.
- Site
- Lödla
- Processes
- Photovoltaic planning and installation, Electrical installation, Heating installation (heat pump, gas heating, oil heating, solid fuel boiler, solar system), Ventilation and air conditioning system installation, Plumbing installation, Control cabinet construction / switchgear assembly manufacturing, Building automation / measurement and control (MSR) technology, Smart home
- Materials
- Assembly/Installation
- Certificates
- DIN/VDE standards (control cabinet manufacturing)
- Founded
- 1931
- Industries
- Industrial automation, Renewable energies, Residential and commercial buildings, Transport system engineering, Telecommunications, Energy supply and distribution
- 01
Circuit diagram creation & conception
- 02
CAD design
- 03
Software development & hardware programming
- 04
Cable list creation & wiring
- 05
In-house control cabinet manufacturing
- 06
Assembly and commissioning
- 07
Remote maintenance via central control system
- 08
Service and maintenance
Materials & Processes
Assembly/Installation
Installation of control cabinets, PV systems as well as heating, ventilation, air conditioning and plumbing systems.
Locations
Lödla
DEHeadquarters with control cabinet manufacturing, engineering and service
- Lot size
- Single units / prototypes
- Materials
- Electrical components
- Central control system with remote access
Components & Systems






Inside the production





Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Photovoltaic planning and installationAssembly | – | – | – | – | Solar modules, Inverters, Battery storage, Wallboxes |
| Electrical installationAssembly | – | – | – | – | – |
| Heating installation (heat pump, gas heating, oil heating, solid fuel boiler, solar system)Assembly | – | – | – | – | – |
| Ventilation and air conditioning system installationAssembly | – | – | – | – | – |
| Plumbing installationAssembly | – | – | – | – | – |
| Control cabinet construction / switchgear assembly manufacturingAssembly | – | – | – | – | – |
| Building automation / measurement and control (MSR) technologyEngineering | – | – | – | – | – |
| Smart homeEngineering | – | – | – | – | – |
| Service and maintenance (24-hour emergency breakdown service)Assembly | – | – | – | – | – |
Additional services
Reference customers
Quality
Control cabinets and switchgear assemblies are manufactured according to the latest standards (DIN, VDE); the central control system enables rapid fault identification and remote maintenance.
| Evidence | Lödla |
|---|---|
| DIN/VDE standards (control cabinet manufacturing) |
History
- 1931
Foundation of a plumbing and electrical company by Bruno Rauschenbach
- 1973
Herbert Bauer takes over management
- 1975
Roberto Bauer begins training as an electrician
- 1989
Roberto Bauer obtains master craftsman qualification
- 1990
Foundation of Bauer & Co. GmbH after reunification
- 1991
Cooperation with ESB Fries from Siegen for switchgear assemblies
- 1993
Introduction of a central control system for remote fault analysis
- 1995
Start of in-house control cabinet manufacturing and of training apprentices
- 2014
First international projects: switchgear assemblies for customers in Brazil, France and Russia
- 2020
Modernisation of the central control system; joining the SOJKA Group
- 2023
Integration of the company Bender Heizung & Sanitär from Altenburg