
Structural precast concrete components as well as Pantex® lattice girders for tunnelling, hall and residential construction

BEFER - Betonfertigteilbau- und Betonwaren GmbH / TAT GmbH
38820 HalberstadtNew on Amplifa
About BEFER & TAT
BEFER GmbH and TAT GmbH are a manufacturer of precast concrete elements, support systems and reinforced concrete structures based in Halberstadt. The core business of BEFER GmbH comprises the conception, planning, production, delivery and assembly of structural precast concrete elements such as element slabs, wall panels, stairs, balconies, columns and downstand beams, with a specialization in exposed concrete requirements as well as coloured and architectural concrete. TAT GmbH manufactures Pantex® lattice girders (3-cord, 4-cord, Light, Compact) as securing elements for tunnelling in shotcrete construction, made of reinforcing steel B500 B or B 550 B and flat/angle steel S235. The value chain ranges from the company's own Holtemmenaue II gravel pit via a fully automatic concrete mixing plant with residual concrete recycling to 3D plant engineering, production in a manufacturing hall with a pallet circulation system and 3D steel processing, as well as assembly on the construction site. Projects include production halls, schools, office buildings, bridges and elevator shafts; tunnelling systems are in use in projects realized worldwide. The company belongs to the Richard Schulz corporate group and employs 87 staff.
- Site
- Halberstadt
- Processes
- Production of structural precast concrete elements (element slabs, wall panels, stairs, balconies,, Precast beams/downstand beams (rectangular, T or I cross-section, parallel, mono-pitch or gable, Production of elevator shafts as storey-high precast elements, Production of balconies using the negative mould process, Pantex® lattice girders for tunnel lining (3-cord, 4-cord, Light, Compact, high-strength connection), Surface coating of concrete components, Crack injections, Structural strengthening with CFRP lamellas
- Materials
- Reinforcing steel B500 B, Reinforcing steel B 550 B, Angle/flat steel, Screws, CFRP lamellas, Concrete (normal concrete and special concrete), Water-impermeable concrete (WU quality), Reinforcing steel B500 B (DIN 488-1)
- Founded
- 1947
- Employees
- 87
- Industries
- Civil engineering / heavy construction, Hall and industrial construction, Residential and commercial construction, Tunnelling / infrastructure, Bridge construction, Public buildings (schools, office buildings)
- 01
Gravel extraction (wet extraction, Holtemmenaue II gravel works)
- 02
Concrete production (fully automatic mixing plant with residual concrete
- 03
3D plant engineering / structural analysis
- 04
3D steel processing
- 05
Precast concrete production (pallet circulation system)
- 06
Storage (open-air storage with 25-t gantry crane)
- 07
Delivery and assembly
Materials & Processes
Reinforcing steel B500 B (DIN 488-1)
Plain or ribbed reinforcing steel for chord bars of the Pantex® lattice girders.
Reinforcing steel B 550 B (ÖNORM B 4707)
Reinforcing steel according to Austrian standard for tunnelling systems.
Angle/flat steel S235 (EN 10025-2)
Material for the connections of the lattice girders.
Screws grade 8.8 (EN ISO 898-1)
Standard grade for bolted connections of the tunnel girders.
Concrete (normal and special concrete)
Basic material of all structural precast elements, incl. coloured and architectural concrete.
Water-impermeable concrete (WU quality)
For elevator underpasses and balconies without subsequent sealing in the ground.
CFRP lamellas
Carbon fiber reinforced plastic for structural strengthening of reinforced concrete.
Locations

Halberstadt
DEProduction plant, administration, Holtemmenaue II gravel works
- Part weight / size
- up to 50 t / 25 m (beams)
- Lot size
- Project production, individual parts up to series elements
- Materials
- Concrete, reinforced concrete, WU concrete, coloured concrete, reinforcing steel, S235
- Fully automatic concrete mixing plant with bucket conveyor and residual concrete recycling facility
- Production hall with pallet circulation system, 3D steel processing and fully automatic concrete transport
- 25-t gantry crane in the open-air storage
- Suction excavator for wet extraction
- Holtemmenaue II gravel works
Components






Inside the production







Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Production of structural precast concrete elements (element slabs, wall panels, stairs, balconies,Casting | – | 2,50 m (element slab standard width) | 50 t (beams/downstand beams) | – | Concrete, Reinforced concrete, Special concrete, Architectural concrete, Coloured concrete |
| Precast beams/downstand beams (rectangular, T or I cross-section, parallel, mono-pitch or gableCasting | – | 25 m | 50 t | – | Concrete, Reinforced concrete |
| Production of elevator shafts as storey-high precast elementsCasting | – | – | – | – | Reinforced concrete, water-impermeable concrete (WU) |
| Production of balconies using the negative mould processCasting | – | – | – | – | Concrete, WU concrete |
| Pantex® lattice girders for tunnel lining (3-cord, 4-cord, Light, Compact, high-strength connection)Joining | – | – | – | – | Reinforcing steel B500 B (DIN 488-1), Reinforcing steel B 550 B (ÖNORM B 4707), Flat steel/angle steel S235 (EN 10025-2), Screws grade 8.8 (EN ISO 898-1) |
| Surface coating of concrete componentsSurface | – | – | – | – | Concrete |
| Crack injectionsSurface | – | – | – | – | Reinforced concrete |
| Structural strengthening with CFRP lamellasAssembly | – | – | – | – | CFRP (carbon fiber reinforced plastic), Reinforced concrete |
| Assembly services (delivery and assembly of the precast concrete elements)Assembly | – | – | – | – | Concrete, Reinforced concrete |
| Structural analysis / structural design (SP 1-5 according to HOAI, structural stabilityEngineering | – | – | – | – | – |
| 3D preliminary planning / plant engineering with 3D design modelsEngineering | – | – | – | – | – |
5 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Gantry crane | – | 1 | – | 2007 | Open-air storage of finished products, Halberstadt |
| Suction excavator (wet extraction) | – | 1 | – | 2010 | Halberstadt |
| Fully automatic concrete mixing plant with bucket conveyor and residual concrete recycling facility | – | 1 | – | 2021 | Halberstadt |
| Production hall for precast concrete elements with pallet circulation system, 3D steel processing | – | 1 | – | 2022 | Halberstadt |
| Holtemmenaue II gravel works | – | 1 | – | 1994 | Halberstadt |
Additional services
Reference customers
History
- 1947
Foundation of a GmbH for the utilization of rubble debris by the brothers F. and H. Conrad with 65 employees.
- 1953
Expropriation and conversion into VEB Betonwerk Halberstadt.
- 1961
Foundation stone laying for the new plant on the Magdeburger Chaussee.
- 1971
Start of the extraction of gravel sands in the company's own open-cast mine.
- 1973
Manufacturer of special precast concrete elements, among others for the Stendal nuclear power plant and the Palast der Republik in Berlin.
- 1990
Reprivatization to BEFER Betonfertigteilbau- und Betonwaren GmbH.
- 1991
TAT GmbH acquires 100 % of the BEFER shares; start of production of the patented Pantex® tunnel girders.
- 1994
Commissioning of the Holtemmenaue II gravel works; doubling of gravel production.
- 1999
Richard Schulz Tiefbau GmbH & Co. KG acquires interests in BEFER GmbH.
- 2003
Richard Schulz GmbH & Co. KG takes over 100 % of the shares in BEFER and TAT.
- 2007
New 25-t gantry crane in the open-air storage for just-in-time deliveries.
- 2010
First suction excavator for wet extraction.
- 2018
Introduction of a new ERP system; Volker Weidemann becomes managing director.
- 2019
Recultivation of the gravel sand open-cast mine and start of construction of the new production hall (project Zukunft).
- 2020
Foundation stone laying of the new fully automatic concrete mixing plant with residual concrete recycling facility.
- 2021
Commissioning of the mixing plant and foundation stone laying of the new production hall with pallet circulation system and 3D steel processing.
- 2022
Start of assembly of the new production hall by the own assembly team.