Architecture and engineering firm for design and construction management in structural building since 1949.
Bergmann & Müller – Architekten und Ingenieure
35630 Ehringshausen (Hessen) · DeutschlandNew on Amplifa
About Bergmann & Müller
The architecture firm Bergmann & Müller from Ehringshausen has been realizing projects in all fields of structural building since 1949. Its key services lie in design according to HOAI (service phases 1–5) and construction management according to HOAI (service phases 6–9), as well as building surveys, proof of completion and partition, property valuation, and change of use. Key project types include new construction of office and commercial buildings, buildings for industry and manufacturing, healthcare buildings, multi-storey residential construction, and single-family and terraced houses. Clients include companies such as Schunk, Küster, Holzapfel and CJ-Optik as well as public bodies such as the Lahn-Dill district with schools, kindergartens and gymnasiums. The team comprises owners, architects, civil engineers and draftsmen; the joint practice is led by Steffen Bergmann and Thorsten Müller.
- Site
- Ehringshausen
- Processes
- Design according to HOAI (phases 1 to 5), Construction management according to HOAI (phases 6 to 9), Building survey, proof of completion, partition, Property valuation, Change of use, Design according to HOAI (phases 1–5), Construction management according to HOAI (phases 6–9)
- Materials
- Design according to HOAI, Construction management according to HOAI, Building survey, proof of completion, partition, Property valuation
- Founded
- 1949
- Industries
- Structural building, Industry and manufacturing, Healthcare, Residential construction, Public bodies, Preservation of historical monuments
- 01
Building survey / change of use
- 02
Property valuation
- 03
Design according to HOAI (phases 1–5)
- 04
Construction management according to HOAI (phases 6–9)
Services and Design Phases
Design according to HOAI
Object planning and service phases 1 to 5, from basic determination to execution planning.
Construction management according to HOAI
Local construction supervision and construction management in service phases 6 to 9.
Building survey, proof of completion, partition
Measurement and documentation of existing buildings including completion and partition proceedings.
Property valuation
Valuation of real estate and building fabric.
Locations
Ehringshausen
DEOffice / head office
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Design according to HOAI (phases 1 to 5)Engineering | – | – | – | – | – |
| Construction management according to HOAI (phases 6 to 9)Engineering | – | – | – | – | – |
| Building survey, proof of completion, partitionEngineering | – | – | – | – | – |
| Property valuationEngineering | – | – | – | – | – |
| Change of useEngineering | – | – | – | – | – |
Additional services
Reference customers
History
- 1949
Foundation of the architecture firm by Frieder Bergmann.
- 1970
Frieder Bergmann becomes a member of the Chamber of Architects Hessen on 17.11.1970 (No. 3842).
- 2024
Handover of the school keys after conversion and new construction of the Johann Heinrich Alsted Schule by Steffen Bergmann.