Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
BFU – Fertigung

Manufacturer of precast concrete parts: stairs, walls, balconies, ceilings and special parts for industrial, commercial and residential construction.

BF

Beton-Fertigteil-Union GmbH & Co. KG

Schramberg-WaldmössingenNew on Amplifa

Amtsgericht Stuttgart HRA 480777Register court
GmbH & Co. KGLegal form
Industrial, commercial and residentialFields of application
Germany, SwitzerlandDelivery regions (proven)

About BFU

Beton-Fertigteil-Union GmbH & Co. KG (BFU) is a manufacturer of precast concrete parts based in Schramberg-Waldmössingen in the Black Forest (Baden-Württemberg). The product range includes stairs in straight, semicircular, quarter-turn and half-turn designs, double walls, Iso-Twin walls and solid walls, balcony elements, Filigran ceiling slabs, and special parts such as columns, downstand beams and custom designs to customer specifications. Stairs are produced standing on their sides on a system stair formwork, giving them formwork-smooth surfaces on three sides; balconies are produced on butterfly formwork with formwork-smooth surfaces on all sides. The in-house technical office, staffed with engineers and architectural draftsmen, prepares all design and production documentation as early as the planning phase, in cooperation with architectural and engineering firms. With its own vehicle fleet, the company delivers the precast parts to the construction site on schedule. Reference projects include, among others, the Stadthalle Rottweil, the ice stadium in Villingen-Schwenningen, Heco-Schrauben GmbH & Co. KG and Schwäbische Werkzeugmaschinen; customers include private builders, commercial investors and the public sector.

Site
Schramberg-Waldmössingen
Processes
Stairs (straight, semicircular, quarter-turn or half-turn, system stair formwork, produced standing, Double walls, Iso-Twin walls, Solid walls, Balcony elements (butterfly formwork, formwork-smooth on all sides), Filigran ceiling slabs, Special parts: columns, Special parts: downstand beams
Materials
Concrete, Concrete (precast concrete)
Industries
Industrial construction, Commercial construction, Residential construction, Public buildings, Industrial, commercial and residential construction as stated on the website
  1. 01

    Technical office: planning and preparation of design and production

  2. 02

    Formwork and production in the precast plant

  3. 03

    Quality assurance

  4. 04

    Transport to the construction site with own vehicle fleet

Materials and Processes

Beton

Concrete (precast concrete)

Material used for all precast parts, from stairs and walls to balconies and ceilings through to special parts.

Locations

Standort Schramberg-Waldmössingen

Schramberg-Waldmössingen

DE

Precast plant and administration (headquarters)

Materials
Concrete
  • System stair formwork
  • Butterfly formwork (balconies)

Components

Walls (double wall, Iso-Twin wall, solid wall)
Walls (double wall, Iso-Twin wall, solid wall)Precast concrete · industrial, commercial and residential construction
Balcony elements
Balcony elementsButterfly formwork · residential construction
Anthracite wall panels (Stadthalle Rottweil)
Anthracite wall panels (Stadthalle Rottweil)Precast concrete · public buildings
Iso-Twin walls, double walls, ceiling (Heco)
Iso-Twin walls, double walls, ceiling (Heco)Precast concrete · industrial construction
Precast parts (Schwäbische Werkzeugmaschinen)
Precast parts (Schwäbische Werkzeugmaschinen)Precast concrete · industrial construction
Ceiling, columns, stairs, downstand beams (Weckenmann)
Ceiling, columns, stairs, downstand beams (Weckenmann)Precast concrete · commercial construction

Inside the production

Reference object Sporthaus zum See
Reference object Sporthaus zum See
Exterior view of a reference project
Exterior view of a reference project
BFU team
BFU team
Work in the precast plant
Work in the precast plant
BFU employees
BFU employees

Industries

Industrial constructionCommercial constructionResidential constructionPublic buildingsIndustrial, commercial and residential construction as stated on the website

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Stairs (straight, semicircular, quarter-turn or half-turn, system stair formwork, produced standingCasting––––Concrete
Double wallsCasting––––Concrete
Iso-Twin wallsCasting––––Concrete
Solid wallsCasting––––Concrete
Balcony elements (butterfly formwork, formwork-smooth on all sides)Casting––––Concrete
Filigran ceiling slabsCasting––––Concrete
Special parts: columnsCasting––––Concrete
Special parts: downstand beamsCasting––––Concrete
Custom designs / special parts to customer specificationCasting––––Concrete
Facade elementsCasting––––Concrete
PodiumsCasting––––Concrete
Wall panels (anthracite)Casting––––Concrete
Planning and preparation of design and production documentation for precast concrete partsEngineering–––––

2 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Stair formwork (system stair formwork)––––Schramberg-Waldmössingen
Butterfly formwork (balconies)––––Schramberg-Waldmössingen

Additional services

Technical office (planning, design and production documentation, collaboration with architecturalLogistics/transport with own vehicle fleetProduction of special parts according to customer requirements

Reference customers

Intersport GrunerHECO-Schrauben GmbH & Co. KGSchwäbische WerkzeugmaschinenStadthalle RottweilIce stadium Villingen-SchwenningenMethabauWeckenmann AnlagentechnikMantel Kreativplanung

Reference Projects

  1. 2007/2008

    Ice stadium Villingen-Schwenningen: double walls, stairs, downstand beams, ceiling, solid walls

  2. 2008

    Stadthalle Rottweil: Iso-Twin walls, double walls, ceiling, anthracite-colored wall panels

  3. 2009

    Intersport Gruner, Konstanz: facade elements, ceiling slabs, stairs

  4. 2011

    Weckenmann Anlagentechnik, Dormettingen: ceiling, columns, stairs, downstand beams

  5. 2012

    Schwäbische Werkzeugmaschinen, Waldmössingen as well as Methabau, CH-Amriswil (Iso-Twin walls, double walls, solid walls, podiums)

  6. 2012/2013

    Heco, Schramberg-Sulgen: Iso-Twin walls, double walls, ceiling

  7. 2013

    BFU office building, Waldmössingen – all precast parts produced in the company's own plant

  8. 2020

    Mantel Kreativplanung, Hausach: Iso-Twin walls, ceiling

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account