
Bexie Energy develops and sells intelligent energy systems: photovoltaics, storage, EMS, wallboxes and aerothermal energy.
Bexie Energy (Bexie Group)
Llanera (P.I. Silvota), Asturias (ES) · Bobes (Siero), Asturias (ES, under construction)New on Amplifa
About Bexie Energy
Bexie Energy, part of the Bexie Group, is a Spanish company from Asturias specialised in intelligent energy systems. The product portfolio includes photovoltaic modules (including N-Type technology and BIPV coloured glass), hybrid and grid inverters, battery storage systems with backup function, wallboxes for e-mobility, aerothermal heat pumps (monobloc) as well as all-in-one systems with proprietary energy management (Bexie Monitoring, BEXIE AI/EMS). The company supports households, businesses and installers from engineering planning through system design to installation, and offers monitoring and peak-shaving solutions. Its distribution model is direct sales 'De fábrica al instalador' to a network of small and medium-sized installers in Spain and Europe; access to photovoltaic production is via Exiom Solution's global manufacturing network. The head office is located in the Silvota industrial estate (Llanera). In the Bobes industrial estate (Siero), a new hall for production, logistics and R&D is under construction, with completion planned for the end of 2026; from 2027, the company's own energy storage factory is scheduled to start production there.
- Site
- Llanera (Asturias), Spain
- Processes
- Photovoltaic installation (Autoconsumo solar), Storage system installation (Baterías), Heat pump installation (Aerotermia), Charging infrastructure installation (Cargadores de coche eléctrico), Energy engineering (Ingeniería energética), Storage manufacturing (Fábrica de almacenamiento energético), Engineering & system design, Energy monitoring and intelligent energy management solutions (Bexie Monitoring, BEXIE AI/EMS)
- Materials
- N-Type monocrystalline silicon, Aluminium alloy (anodised), Tempered glass with AR coating, Lithium
- Founded
- 2014
- Industries
- Private households (residential), Commercial & industrial, Hotels / hospitality, Warehousing & logistics, Agriculture, Retail/supermarkets
- 01
Engineering & system design
- 02
Production via Exiom manufacturing network (photovoltaics) or own storage
- 03
B2B wholesale / direct sales to installers
- 04
Installation
- 05
Monitoring & EMS (BEXIE AI)
- 06
Technical support
Technologies and Materials
N-Type monocrystalline silicon
Semiconductor material of the 108-cell half-cut-cell modules with 19.9 % module efficiency (EX390TP-108(HC)(182)).
Aluminium alloy (anodised)
Module frame made of anodised aluminium alloy in a colour similar to RAL 8001.
Tempered glass with AR coating
3.2 mm front glass with anti-reflective coating of the PV modules.
Lithium
Base material of the battery storage systems for backup and peak shaving.
Sites
Llanera (P.I. Silvota)
ESHead office / office / logistics

Bobes (Siero)
ESNew site: production/warehouse hall (production, logistics, R&D); storage factory from 2027 (under construction)
- Materials
- Lithium (storage production from 2027)
Products and Systems


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Photovoltaic installation (Autoconsumo solar)Assembly | – | – | – | – | Silicon (N-Type monocrystalline), Aluminium, Glass |
| Storage system installation (Baterías)Assembly | – | – | – | – | Lithium (batteries) |
| Heat pump installation (Aerotermia)Assembly | – | – | – | – | – |
| Charging infrastructure installation (Cargadores de coche eléctrico)Assembly | – | – | – | – | – |
| Energy engineering (Ingeniería energética)Engineering | – | – | – | – | – |
| Storage manufacturing (Fábrica de almacenamiento energético)Assembly | – | – | – | – | Lithium |
Additional services
History
- 2014
Start of business operations; according to the company, support for households, businesses and installers in deploying modern energy systems.
- 2026
Start of construction work on a new building in the Bobes industrial estate (Siero) to expand production, logistics and R&D; completion planned by the end of the year.
- 2027
Scheduled opening of the company's own energy storage factory in Asturias ('Fábrica de almacenamiento energético'); production start in 2027.