Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Concrete precast plant in Kavelstorf specializing in concrete elements for hybrid wind towers.

BG

BG Wind GmbH

Kavelstorf (near Rostock)New on Amplifa

over 20 yearsExperience in manufacturing
250Workers (19 nations)
42,000 m²Production area
approx. 1.5 tower sets/weekProduction capacity

About BG Wind

BG Wind GmbH operates a concrete precast plant in Kavelstorf near Rostock with approximately 42,000 m² of production space and 205,000 m² of storage space. Around 250 workers from 19 nations are employed at the plant. The current production focus is on concrete elements for hybrid wind towers from Nordex Acciona, in particular keystones, which are a crucial component of the hybrid tower technology. Approximately 1.5 wind tower sets are produced per week; a tower set comprises around 1,500 t of concrete C80/95 and 89 t of steel B500B. In addition to formwork, reinforcement and concrete processing work, the company also manufactures other precast concrete parts to customer requirements. The Kavelstorf site offers good logistics conditions for large-format components thanks to its direct connection to the A19/A20 and the Rostock Overseas Port.

Site
Kavelstorf (near Rostock)
Processes
Production of precast concrete parts for hybrid wind towers (keystones), Reinforcement and formwork work / concrete processing, Production of precast concrete parts (focus on concrete elements for hybrid wind towers), Manufacture of other precast concrete parts to customer requirements, Formwork, reinforcement and concrete processing
Materials
Concrete C80/95, Steel B500B (reinforcing steel)
Certificates
ISO 9001
Employees
250
Industries
Wind energy / Renewable energies, Precast concrete construction
  1. 01

    Formwork

  2. 02

    Reinforcement

  3. 03

    Concrete processing

  4. 04

    Precast production (keystones)

  5. 05

    Logistics/Shipping

Materials and Processes

C80/95

Concrete C80/95

High-strength concrete for the load-bearing concrete elements of hybrid wind towers, approx. 1,500 t per tower set.

B500B

Steel B500B (reinforcing steel)

Reinforcing steel for the reinforcement of the precast components, approx. 89 t per tower set.

Locations

Kavelstorf (near Rostock)

DE

Concrete precast plant / Production, connected to A19/A20 and Rostock Overseas Port

Part weight / size
Large-format concrete elements for towers up to 179 m hub
Lot size
approx. 1.5 tower sets per week
Materials
Concrete C80/95, steel B500B
  • Formwork systems
  • Reinforcement systems

Industries

Wind energy / Renewable energiesPrecast concrete construction

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Production of precast concrete parts for hybrid wind towers (keystones)Casting–179 m hub height (tower, not component)–1.5 towers per weekConcrete C80/95, Steel B500B
Reinforcement and formwork work / concrete processingAssembly––––Concrete C80/95, Steel B500B

Additional services

Production of precast concrete parts (focus on concrete elements for hybrid wind towers)Manufacture of other precast concrete parts to customer requirementsFormwork, reinforcement and concrete processing

Reference customers

Nordex Acciona (concrete elements for hybrid wind towers)

Quality

Care in formwork, reinforcement and concrete processing forms the basis for precise manufacturing according to the requirements of each project.

EvidenceKavelstorf (near Rostock)
ISO 9001
Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo