Bidirex – Fertigung

Energy infrastructure, metal construction and screw foundations: PV, storage, charging infrastructure, CNC machining and laser cutting from in-house production

BI

Bidirex GmbH

Neuenburg am Rhein · Neuenburg am Rhein (Leisinger plant) · ChamNew on Amplifa

2022Founded (origin: Eckerlin smithy, 1950)
3Sites within the Bidirex group
Ø 700 mm / 3,000 mmMax. CNC turned part
12.5 mMax. tube laser workpiece length
9.45 MWpLargest realized PV project

Energy infrastructure and metal construction from a single group

Bidirex GmbH, based in Neuenburg am Rhein, combines energy infrastructure with in-house metal fabrication. The company plans, builds, finances and operates rooftop PV systems, PV carports, battery storage and AC/DC charging infrastructure up to 420 kW (HPC), and through Bidirex Energy GmbH offers electricity models as well as balancing group and virtual power plant services. In metal construction, the Leisinger plant produces CNC turned and milled parts up to 700 mm in diameter and 3,000 mm in length on a Mazak machine fleet with ten CNC stations, and performs tube and flat sheet laser cutting (tube diameters 20–323.9 mm, workpiece lengths up to 12.5 m), press braking, robotic welding and assembly. Materials include steel, stainless steel and aluminium. At the Cham site, removable V-System steel screw foundations are installed, among other things for PV and carport projects. Customers come from retail and real estate, industry and logistics, municipalities, vehicle and trailer manufacturing, and agriculture. Bidirex was founded in 2022 and in 2023 acquired Leisinger Deutschland GmbH, whose origins go back to a smithy in Neuenburg in 1950.

Site
Neuenburg am Rhein
Processes
CNC turning, CNC milling, Turn-mill complete machining, Laser cutting (tube/profile), Flat sheet laser 2D sheet cutting, Press braking (CNC press brake), Welding technology (robotic welding, ISO 3834-2), Custom construction / custom assemblies to drawing (single parts, assemblies, special constructions)
Materials
Steel, Stainless steel, Aluminium, Steel (screw foundations)
Certificates
DIN EN ISO 9001:2015, DIN EN ISO 3834-2, EN 1090-2, EN 1090 (CPR), PCF (Product Carbon Footprint), ISO 9001, ISO 3834-2
Founded
2022
Industries
Retail & real estate, Industry & logistics, Municipalities, Vehicle and trailer manufacturing, Agriculture, Energy infrastructure
  1. 01

    Site assessment and project development (electrical planning)

  2. 02

    Engineering and 3D design

  3. 03

    Laser cutting and press braking

  4. 04

    CNC machining (turning/milling)

  5. 05

    Welding technology (robotic welding)

  6. 06

    Assembly and assembly inspection

  7. 07

    Installation and commissioning (PV, storage, charging infrastructure)

  8. 08

    Inspection using ZEISS 3D metrology

  9. 09

    Operation, electricity models and marketing (Bidirex Energy GmbH)

Materials and processes

S

Steel

Main material for screw foundations, structural steelwork according to EN 1090-2, laser cutting and welded assemblies.

VA

Stainless steel

For corrosion-exposed laser-cut and machined parts in vehicle and infrastructure applications.

Al

Aluminium

Used in tube and flat sheet laser cutting as well as for lightweight constructions and load-bearing structures.

Sites

Neuenburg am Rhein

DE

Head office / Renewable Energy & E-Mobility

  • Electrical planning and project development
  • AC/DC charging infrastructure up to 420 kW
  • PV planning and installation
  • Battery storage integration

Neuenburg am Rhein (Leisinger plant)

DE

Metal construction / Manufacturing

Lot size
Single parts up to small and repeat production runs
Materials
Steel, stainless steel, aluminium
  • 2x Mazak multi-spindle turning center HQR 250MSY
  • 2x Mazak twin-spindle turning center Multiplex W-200
  • Mazak Integrex i-500S
  • Mazak Quick Turn 350MY (Ø 700 mm, 3,000 mm length)
  • Mazak Quick Turn 250MY
  • Mazak VTC-530C (5-axis, 530 x 510 mm, part lengths up to 1,740 mm)
  • Bystronic tube laser FL 300 (Ø 20–323.9 mm)
  • Bystronic tube laser ByTube Star 330
  • Bystronic flat sheet laser ByCut Smart 3015
  • Bystronic press brake Xpert Pro 250 (250 t)
  • Robotic welding systems
  • ZEISS 3D coordinate measuring machine

Cham

DE

Screw foundations

Lot size
Project manufacturing
Materials
Steel
  • V-System screw foundations Ø 114 mm
  • Micropiles, removable

Inside the production

Production and site impression of Bidirex
Production and site impression of Bidirex

Industries

Retail & real estateIndustry & logisticsMunicipalitiesVehicle and trailer manufacturingAgricultureEnergy infrastructurePrivate customers

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
CNC turningMachining–3000 mm × Ø 700 mm––Steel, Stainless steel, Aluminium
CNC millingMachining–1740 mm × 530 mm × 510 mm–––
Turn-mill complete machiningMachining–3000 mm × Ø 700 mm–––
Laser cutting (tube/profile)Machining–12.5 m × Ø 323.9 mm––Steel, Stainless steel, Aluminium
Flat sheet laser 2D sheet cuttingMachining––––Steel, Stainless steel, Aluminium
Press braking (CNC press brake)Forming––––Steel, Stainless steel, Aluminium
Welding technology (robotic welding, ISO 3834-2)Joining––––Metallic materials, Steel, Aluminium
Custom construction / custom assemblies to drawing (single parts, assemblies, special constructions)Engineering–––––
Assembly and inspection (assembly of complete units)Assembly–––––
Structural steelwork according to EN 1090-2 (load-bearing steel and aluminium structures)Assembly––––Steel, Aluminium
Screw foundations (V-System, micropiles, removable)Assembly–Ø 114 mm––Steel
3D metrology / coordinate measurementInspection–––––
PV system planning and installation (rooftop, carport)Assembly––9.45 MWp (project reference)––
Charging infrastructure (AC/DC charging points, HPC up to 420 kW)Assembly–––––
Battery storage installation (BESS)Assembly–––––

20 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Multi-spindle turning centerMazak HQR 250MSY2––Leisinger plant, Neuenburg am Rhein
Twin-spindle turning centerMazak Multiplex W-2002––Leisinger plant, Neuenburg am Rhein
Turn-mill centerMazak Integrex i-500S1––Leisinger plant, Neuenburg am Rhein
CNC turning and milling center (Y-axis)Mazak Quick Turn 350MY1Diameter up to 700 mm, length up to 3000 mm–Leisinger plant, Neuenburg am Rhein
Compact turn-mill centerMazak Quick Turn 250MY1––Leisinger plant, Neuenburg am Rhein
Turn-mill center (legacy machine)Mazak Super Quick Turn MSY 2501––Leisinger plant, Neuenburg am Rhein
Twin-spindle turning center (legacy machine)Mazak Multiplex 6200Y1––Leisinger plant, Neuenburg am Rhein
Vertical machining center (5-axis)Mazak VTC-530C1Working space 530 x 510 mm, part lengths up to 1740 mm–Leisinger plant, Neuenburg am Rhein
Tube laserBystronic FL 3001Tube diameter 20-323.9 mm, length up to 12.5 m–Leisinger plant, Neuenburg am Rhein
Tube laserBystronic ByTube Star 3301Workpiece length up to 12.5 m–Leisinger plant, Neuenburg am Rhein
Flat sheet laserBystronic ByCut Smart 30151Format 3015–Leisinger plant, Neuenburg am Rhein
Press brake (CNC press brake)Bystronic Xpert Pro 2501Press force 250 t–Leisinger plant, Neuenburg am Rhein
3D coordinate measuring machineZEISS–––Leisinger plant, Neuenburg am Rhein
Optical roundness measuring machine–––2016Leisinger plant, Neuenburg am Rhein
Robotic welding system–––2009-2013Leisinger plant, Neuenburg am Rhein
Multi-spindle machines–––2015Leisinger plant, Neuenburg am Rhein
AC charging stationBidirex NOVA AC––––
AC charging station with media displayBidirex SIRIUS AC––––
DC fast charging stationBidirex ORION DC––––
HPC charging solutionBidirex TITAN HPC––––

Additional services

Rooftop PV systemsPV carportsBattery storageAC/DC charging infrastructure up to 420 kW (HPC)Charging park operation and investmentVirtual power plant / balancing group / electricity models A–D (Bidirex Energy GmbH)Screw foundations (removable, micropiles)Metal construction: CNC turning and milling up to 10 axesLaser cutting (tube/flat sheet), press brakingWelding technologyCustom construction / drawing partsAssemblyZEISS 3D metrology / inspectionElectrical planning and project development

Reference customers

Logad GmbHVitra Campus (Doshi Retreat / Balkrishna Doshi)City of FreiburgMunicipality of AuggenArbireo Capital AG (joint venture)

Quality and certifications

Quality assurance includes ZEISS 3D coordinate measuring technology as well as an optical roundness measuring machine. Certified systems are DIN EN ISO 9001:2015, DIN EN ISO 3834-2 and EN 1090-2 with CPR documents for load-bearing steel and aluminium structures.

EvidenceNeuenburg am Rhein (Leisinger plant)
ISO 9001
ISO 3834-2
EN 1090-2

History

  1. 1950

    Origin: The company Leisinger emerges from the Eckerlin smithy in Neuenburg am Rhein, which had been building trailers since 1936.

  2. 1960er

    Move into the new company premises in Neuenburg; custom-built trailers and truck bodies.

  3. 1980er

    Vehicle manufacturing is spun off and leased out; transition to a supplier business.

  4. 2002

    Family transition following the death of H.-A. Leisinger.

  5. 2008

    Business operations transfer to Leisinger Deutschland GmbH.

  6. 2009–2013

    Introduction of robotic welding systems, 3D design and SAP; achievement of ISO 9001 and ISO 3834-2.

  7. 2015

    Product FMEA, multi-spindle machines and a subsidiary for charging stations.

  8. 2021

    Expanded CNC manufacturing up to 700 mm diameter and 3,000 mm length; ZEISS metrology extends inspection capabilities.

  9. 2022

    Foundation of Bidirex GmbH in February by Ali Yarayan, Alexander Eyhorn and Jürgen Fitschen.

  10. 2023

    Acquisition of Leisinger Deutschland GmbH in an asset deal; manufacturing and workforce are merged.

  11. 2024

    First PV and charging park in Auggen, joint venture with Arbireo Capital AG and establishment of the screw foundations division at the Cham site.

  12. 2025

    Peter Bertling becomes CFO; realization of a 9.45 MWp rooftop PV system for Logad.

  13. 2026

    Alexander Eyhorn becomes CINO; Doshi Retreat project for Vitra with 334 screw foundations.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo