Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Birke – Fertigung

Group of companies for electrical engineering: electrical installation, switchgear construction, control technology and energy systems from a single source

Birke Logo

Birke Elektroanlagen GmbH

Wunsiedel (Rot-Kreuz-Straße 8)New on Amplifa

1965Founded
approx. 200Employees
approx. 1,700 m²New building at the headquarters (2022)
6Further companies of the group since 2007
60 yearsCompany anniversary 2025

About the Birke Group

Birke Elektroanlagen GmbH, founded in 1965, is the parent company of the Birke group of companies and is headquartered in Wunsiedel (Bavaria). The company with around 200 employees realizes electrical engineering projects according to the guiding principle of "everything from a single source" – from the power socket to the medium-voltage switchgear. The range of services includes electrical installation, switchgear construction with engineering in EPLAN P8, control and visualization technology (PLCs from Siemens, Beckhoff and Wago), IT and network technology, photovoltaics and renewable energies, smart home and building automation as well as heating, air conditioning and ventilation technology. Customers come from industry, commerce, automotive, energy, healthcare and retail, including LAPP Insulators, TUBEX, Kleemann, MAN, BMW, Mammut and Fresenius Medical Care. The company has been certified to DIN EN ISO 9001 since 2003 and to DIN 14675 for fire alarm systems since 2014, and operates throughout Europe. The new building at the headquarters completed in 2022 with approx. 1,700 m² of floor space meets the KfW Efficiency Standard 40 Plus and houses, among other things, the switchgear construction unit.

Site
Wunsiedel
Processes
Electrical installation, Switchgear construction, Control technology (PLC programming Siemens, Beckhoff, Wago), Visualization (Siemens operator devices, touch panels, PC-based visualizations), IT & telecommunications / network technology, Planning and construction of photovoltaic systems, Smart Home & Smart Commercial (building automation, Loxone), Heating, air conditioning and ventilation technology (planning, installation, maintenance,
Materials
Control technology (Siemens, Beckhoff, Wago), EPLAN P8, Visualization systems, Photovoltaics & CHP, Building automation
Certificates
DIN EN ISO 9001, DIN 14675 (fire alarm systems), VDE/IEC testing of switchgear
Founded
1965
Employees
approx. 200
Industries
Industry, Commerce, Construction / building equipment, Automotive, Energy, Healthcare
  1. 01

    Planning and engineering (EPLAN P8)

  2. 02

    Programming of control technology

  3. 03

    Construction and wiring of switchgear cabinets

  4. 04

    Quality inspection according to VDE/IEC directives

  5. 05

    On-site installation and commissioning

  6. 06

    Maintenance and documentation

Services & Technologies

SPS

Control technology (Siemens, Beckhoff, Wago)

Programmable logic controllers for industrial and building automation.

CAE

EPLAN P8

Electrical CAE system for switchgear engineering, a binding delivery specification for many customers.

HMI

Visualization systems

Siemens operator devices, touch panels and PC-based visualizations for plant operation.

PV

Photovoltaics & CHP

Planning and construction of PV systems and combined heat and power units for building energy supply.

Loxone

Building automation

Smart home and smart commercial solutions including sensor technology and monitoring.

Locations

Standort Wunsiedel

Wunsiedel

DE

Headquarters, switchgear construction, administration

Materials
Electrical engineering, control technology
  • Switchgear construction workshop
  • EPLAN P8 engineering
  • PLC programming (Siemens, Beckhoff, Wago)

Components & Systems

Control cabinet wiring
Control cabinet wiringSwitchgear construction · Industry
Tested switchgear
Tested switchgearQuality inspection VDE/IEC · Commercial
Enameling plant (LAPP retrofit)
Enameling plant (LAPP retrofit)Electrical installation & automation · Industry
Bus tilting plant (MAN Munich)
Bus tilting plant (MAN Munich)Electrical installation & control technology · Automotive

Inside the production

Engineering of a control cabinet with EPLAN
Engineering of a control cabinet with EPLAN
Control cabinet assembly in switchgear construction
Control cabinet assembly in switchgear construction
Switchgear construction & control technology
Switchgear construction & control technology
Renewable energies / photovoltaics
Renewable energies / photovoltaics
Smart Home & Smart Commercial
Smart Home & Smart Commercial
Heating & air conditioning technology
Heating & air conditioning technology
History of the Birke group
History of the Birke group

Industries

IndustryCommerceConstruction / building equipmentAutomotiveEnergyHealthcareRetailPublic buildings

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Electrical installationAssembly––––Cables & wires
Switchgear constructionAssembly–––––
Control technology (PLC programming Siemens, Beckhoff, Wago)Engineering–––––
Visualization (Siemens operator devices, touch panels, PC-based visualizations)Engineering–––––
IT & telecommunications / network technologyAssembly–––––
Planning and construction of photovoltaic systemsAssembly–––––
Smart Home & Smart Commercial (building automation, Loxone)Assembly–––––
Heating, air conditioning and ventilation technology (planning, installation, maintenance,Assembly–––––
Fire alarm systems (DIN 14675 certified)Assembly–––––
Switchgear engineering with electrical CAE system EPLAN P8Engineering–––––

Additional services

Electrical installationSwitchgear constructionControl technology / automationIT & telecommunicationsPhotovoltaics / renewable energiesSmart Home & Smart CommercialHeating, air conditioning and ventilation technology (HVAC)Planning, programming, visualization, commissioningInstallationMaintenance

Reference customers

LAPP InsulatorsTUBEX GmbHKleemann GmbHMAN AGBMWMammutHamm AGFresenius Medical CareEDEKAmediRudolf Wöhrl AGViessmann (CHP module)Wirtgen Group

Quality

The Birke group has been certified to DIN EN ISO 9001 since 2003 and to DIN 14675 for fire alarm systems since 2014. All distribution boards and control cabinets are tested and inspected in accordance with VDE/IEC directives before delivery.

EvidenceWunsiedel
DIN EN ISO 9001
DIN 14675 (fire alarm systems)
VDE/IEC testing of switchgear

History

  1. 1965

    Foundation stone laid / company founded

  2. 2003

    First certification to DIN EN ISO 9001

  3. 2007

    Founding of WUN Elektro GmbH

  4. 2008

    Founding of WUN Solar GmbH

  5. 2010

    Founding of BT Elektro GmbH

  6. 2013

    Founding of M Elektro GmbH

  7. 2014

    Certification to DIN 14675 for fire alarm systems

  8. 2016

    Founding of Steiner Elektro GmbH

  9. 2021

    Groundbreaking ceremony for the new building at the Wunsiedel headquarters

  10. 2022

    Completion of the new building in KfW Efficiency Standard 40 Plus (approx. 1,700 m²)

  11. 2023

    Founding of Premium Energiesystemtechnik GmbH

  12. 2025

    60th company anniversary

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo