Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Birke – Fertigung

Electrical installation, switchgear construction and control technology for industry, trade and the public sector – everything from a single source

Birke Logo

Birke Elektroanlagen GmbH

WunsiedelNew on Amplifa

1965Founded
approx. 200Employees
WunsiedelHeadquarters
approx. 1,700 m²New building extension at headquarters (2022)
2,823Cumulative distribution boards & control cabinets built

Everything from a single source – the Birke Group

Birke Elektroanlagen GmbH, based in Wunsiedel, is the parent company of the Birke Group, a Bavarian family business founded in 1965 with around 200 employees. The group covers the entire field of electrical engineering – from the power outlet to the medium-voltage switchgear – and additionally offers cross-trade services in plumbing, heating and air conditioning. Core competencies include electrical installation, switchgear construction with planning, programming, visualization and commissioning, control technology based on PLC systems from Siemens, Beckhoff and Wago, IT and network technology, photovoltaics, building automation (smart home and smart commercial) as well as fire alarm systems. Switchgear is engineered using the EPLAN P8 electrical CAE system. Customers include industrial and commercial companies such as MAN, BMW, Kleemann, HAMM, TUBEX, Fresenius Medical Care, EDEKA, medi, NEOPLAN and LAPP Insulators as well as the public sector. Together with six further group companies, the group operates throughout Europe; it has been certified to DIN EN ISO 9001 since 2003 and, in the field of fire alarm systems, to DIN 14675 since 2014. In 2022, a new building of approximately 1,700 m² was completed at the Wunsiedel headquarters to KfW Efficiency Standard 40 Plus.

Site
Wunsiedel
Processes
Electrical installation, Switchgear construction (distribution boards & control cabinets), Control technology (planning, programming, visualization, commissioning), IT & Telecommunications / Network technology, Photovoltaic systems (planning and construction), Smart Home & Smart Commercial / Building Automation, Heating, Air Conditioning and Ventilation Technology (HVAC), Fire alarm systems (DIN 14675 certified)
Materials
EPLAN P8 Electrical CAE System, Programmable Logic Controllers (Siemens, Beckhoff, Wago), Operator and Visualization Systems (Siemens), Loxone Smart Home System, Combined Heat and Power Units (e.g. Viessmann Vitobloc 200 EM-5)
Certificates
DIN EN ISO 9001, DIN 14675 (fire alarm systems), ISO 9001, Other (DIN 14675 fire alarm systems)
Founded
1965
Employees
200
Industries
Industry and trade, Automotive, Pharmaceuticals, Logistics, Food processing, Construction / Building services
  1. 01

    Planning (EPLAN P8)

  2. 02

    Engineering & Programming

  3. 03

    Switchgear construction / Wiring

  4. 04

    Testing per VDE/IEC

  5. 05

    Installation & Commissioning

  6. 06

    Documentation & Maintenance

Processes & Systems

EPLAN P8

EPLAN P8 Electrical CAE System

Market-leading CAE system for switchgear engineering, meets the delivery specifications of numerous industrial companies.

SPS

Programmable Logic Controllers (Siemens, Beckhoff, Wago)

High-end control platforms for automation solutions in industry and trade.

HMI

Operator and Visualization Systems (Siemens)

Operator devices, touch panels and PC-based visualizations for plant monitoring.

Loxone

Loxone Smart Home System

Miniserver and sensors for building automation and monitoring solutions.

BHKW

Combined Heat and Power Units (e.g. Viessmann Vitobloc 200 EM-5)

Natural gas-fired combined heat and power for commercial and residential buildings.

Locations

Standort Wunsiedel

Wunsiedel

DE

Headquarters, administration and switchgear construction

Lot size
Individual projects to complex large-scale projects
  • Switchgear construction workshop
  • EPLAN P8
  • PLC systems Siemens/Beckhoff/Wago
  • Rooftop photovoltaic system 29.64 kWp
  • Battery storage 20 kWh

Services & Assemblies

Distribution boards & control cabinets
Distribution boards & control cabinetsSwitchgear construction · Industry and trade
Wiring of control cabinets
Wiring of control cabinetsSwitchgear construction · Electrical engineering
Tested switchgear
Tested switchgearQuality inspection per VDE/IEC · Switchgear construction
Electrical planning (EPLAN P8)
Electrical planning (EPLAN P8)Engineering · Switchgear construction

Inside the production

Switchgear Construction & Control Technology
Switchgear Construction & Control Technology
Smart Home & Smart Commercial
Smart Home & Smart Commercial
Heating & Air Conditioning Technology
Heating & Air Conditioning Technology
IT & Telecommunications
IT & Telecommunications
Renewable Energies / Photovoltaics
Renewable Energies / Photovoltaics
Everything from a single source – services of the Birke Group
Everything from a single source – services of the Birke Group

Industries

Industry and tradeAutomotivePharmaceuticalsLogisticsFood processingConstruction / Building servicesPublic sectorTelecommunicationsAgricultural/perishable food processing

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Electrical installationAssembly–––––
Switchgear construction (distribution boards & control cabinets)Assembly–––––
Control technology (planning, programming, visualization, commissioning)Engineering–––––
IT & Telecommunications / Network technologyAssembly–––––
Photovoltaic systems (planning and construction)Assembly–––––
Smart Home & Smart Commercial / Building AutomationEngineering–––––
Heating, Air Conditioning and Ventilation Technology (HVAC)Assembly–––––
Fire alarm systems (DIN 14675 certified)Assembly–––––
Combined heat and power units (CHP) – planning and constructionAssembly–––––
Cable and wiring installationAssembly–10,856,054 m (cumulative installed)–––

8 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Control cabinet / distribution board construction (switchgear construction workshop)––––Wunsiedel
Mini-CHP Viessmann Vitobloc 200 EM-5 (natural gas-fired)Viessmann Vitobloc 200 EM-51––Selb
Rooftop photovoltaic system–129.64 kWp2022Wunsiedel
Battery storage–120 kWh–Wunsiedel
Electrical CAE system EPLAN P8 (software)EPLAN P8–––Wunsiedel
Programmable Logic Controllers (PLC)Siemens / Beckhoff / Wago––––
Operator and visualization systems (operator devices, touch panels, PC visualization)Siemens––––
Loxone smart home system (Miniserver, sensors)Loxone Miniserver––––

Additional services

Electrical installationSwitchgear constructionControl technologyPlanningProgrammingVisualizationCommissioningIT & TelecommunicationsNetwork technologyPhotovoltaics / Renewable EnergiesSmart Home & Smart Commercial / Building AutomationHeating, Air Conditioning and Ventilation TechnologyMaintenanceCombined Heat and Power UnitsFire Alarm Systems

Reference customers

MAN AGBMWKleemann GmbHHAMM AG (Wirtgen Group)TUBEX GmbHFresenius Medical CareEDEKAmediRudolf Wöhrl AGUS Army (residential buildings Netzaberg)LAPP Insulators GroupABM GreiffenbergerNEOPLANHERMES PHARMADistrict Office WunsiedelDistrict Office Hof

Quality & Certifications

All distribution boards and switchgear are tested and inspected in accordance with VDE/IEC guidelines before leaving the factory; projects are documented seamlessly and in a user-friendly manner. The group has been certified to DIN EN ISO 9001 since 2003 and, for fire alarm systems, to DIN 14675 since 2014.

EvidenceWunsiedel
ISO 9001
Other (DIN 14675 fire alarm systems)

60 Years of Company History

  1. 1965

    Foundation stone laid / founding of the parent company Birke Elektroanlagen GmbH in Wunsiedel

  2. 2003

    First certification to DIN EN ISO 9001

  3. 2007

    Founding of WUN Elektro GmbH

  4. 2008

    Founding of WUN Solar GmbH

  5. 2010

    Founding of BT Elektro GmbH

  6. 2013

    Founding of M Elektro GmbH

  7. 2014

    Certification to DIN 14675 for fire alarm systems

  8. 2016

    Founding of Steiner Elektro GmbH

  9. 2021

    Groundbreaking for the new building at the Wunsiedel headquarters

  10. 2022

    Completion of the new building (KfW Efficiency Standard 40 Plus, approx. 1,700 m²)

  11. 2023

    Founding of Premium Energiesystemtechnik GmbH

  12. 2025

    60th company anniversary

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo