Blitzableiterbau Klammer – Fertigung

Specialist company for lightning protection and earthing systems: planning, installation and testing to DIN EN 62305 since 1950.

Blitzableiterbau Klammer Logo

Blitzableiterbau & Überwachung H. Klammer Inh. Volker Westphal e.K.

Kerpen-Sindorf (DE)New on Amplifa

1950Founded
Kerpen-SindorfLocation
e.K., HRA 18053 (Cologne local court)Legal form / Register
3rd generationFamily management since 2004

About us

Blitzableiterbau & Überwachung H. Klammer Inh. Volker Westphal e.K. is a certified craft business from Kerpen-Sindorf that has been protecting private, commercial, industrial and public buildings against lightning strikes since 1950. Its range of services includes external and internal lightning protection systems, earthing systems (foundation earthing, ring earthing, deep earthing) as well as maintenance, testing, individual consulting and planning. Work is carried out as Lightning Protection Systems (LPS) in accordance with DIN 18014 and DIN EN 62305 (VDE 0185-305). Materials used are galvanized strip and round steel, hot-dip galvanized steel, stainless steel 1.4571 (V4A) and bare or tinned copper cables from 50 mm² cross-section; deep earthing rods are driven up to 9 meters into the ground using a vibratory hammer. Founded in 1950 by Herbert Klammer in Cologne, the company has been run by Volker Westphal in its third generation since 2004 and is registered at the Cologne local court (HRA 18053).

Site
Kerpen
Processes
External lightning protection system, Internal lightning protection system, Earthing systems (LPS to DIN 18014, DIN EN 62305 VDE 0185-305), Foundation earthing (functional equipotential bonding conductor), Ring earthing (earthing type B), Deep earthing (earthing type A), Maintenance and testing of lightning protection systems, Individual consulting and planning of lightning protection systems
Materials
Galvanized strip steel (min. 30 mm x 3.5 mm), Galvanized round steel (min. 10 mm), Stainless steel (material no. 1.4571 / V4a), Copper cables (bare or tinned, multi-strand, min. 50 mm²), Hot-dip galvanized steel, NYY cables, Stainless steel 1.4571, Galvanized strip steel (from 30 × 3.5 mm)
Certificates
Certified lightning protection specialist company
Founded
1950
Industries
Private, Commercial, Industrial, Public buildings
  1. 01

    Individual consulting and planning

  2. 02

    Installation of earthing system

  3. 03

    External lightning protection system

  4. 04

    Internal lightning protection system

  5. 05

    Maintenance and testing

  6. 06

    Documentation

Materials & Processes

V4A / 1.4571

Stainless steel 1.4571

Used for connection lugs outside the concrete as well as ring earthing (strip and round material) due to its corrosion resistance.

Feuerverz. Stahl

Hot-dip galvanized steel

Used as deep earthing material for rods up to approx. 9 m driving length.

Stahl verz.

Galvanized strip steel (from 30 × 3.5 mm)

Material for foundation earthing to DIN 18014.

Stahl verz.

Galvanized round steel (from 10 mm)

Alternative to strip steel for foundation earthing.

Cu

Copper cables (bare or tinned, from 50 mm²)

Multi-strand cables for ring earthing and equipotential bonding connections.

NYY

NYY cables

Earthing cables for connection lugs and fixed earthing points outside the concrete.

Locations

Kerpen-Sindorf

DE

Headquarters, planning, installation and testing

Materials
Galvanized/hot-dip galvanized steel, stainless steel 1.4571, copper
  • Vibratory hammer for deep earthing rods (20/25 mm, approx. 9 m driving length)

Services

External lightning protection system
External lightning protection systemInstallation · Private/Commercial/Industrial
Internal lightning protection system
Internal lightning protection systemInstallation · Building electrics
Earthing system (foundation/ring earthing)
Earthing system (foundation/ring earthing)Installation to DIN 18014
Maintenance and testing
Maintenance and testingTesting · LPS to DIN EN 62305

Inside the production

Company image Blitzableiterbau Klammer
Company image Blitzableiterbau Klammer
Earthing system under construction
Earthing system under construction

Industries

PrivateCommercialIndustrialPublic buildings

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
External lightning protection systemInstallation–––––
Internal lightning protection systemInstallation–––––
Earthing systems (LPS to DIN 18014, DIN EN 62305 VDE 0185-305)Installation––––galvanized strip steel, galvanized round steel, stainless steel 1.4571 (V4a), copper cables, hot-dip galvanized steel
Foundation earthing (functional equipotential bonding conductor)Installation––––galvanized strip steel at least 30 mm x 3.5 mm, galvanized round steel at least 10 mm, stainless steel 1.4571
Ring earthing (earthing type B)Installation––––V4a strip material at least 30 mm x 3.5 mm, V4a round material at least 10 mm, copper cables (bare or tinned), minimum cross-section 50 mm²
Deep earthing (earthing type A)Installation–9.00 m (usual, longer possible)––stainless steel, e.g. 1.4571, hot-dip galvanized steel
Maintenance and testing of lightning protection systemsTesting–––––
Individual consulting and planning of lightning protection systemsEngineering–––––

1 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Vibratory hammer (for driving deep earthing rods)––Deep earthing, rods 20 mm / 25 mm diameter, approx. 9.00 m driving length–Kerpen

Additional services

External lightning protection systemInternal lightning protection systemEarthing systems (foundation earthing, ring earthing, deep earthing)Maintenance and testingIndividual consulting and planningMonitoring

Quality & Standards

Earthing systems are installed in compliance with DIN 18014 and DIN EN 62305 (VDE 0185-305) exclusively by certified specialists, including documentation. The company is recognized as a certified specialist company for lightning protection.

EvidenceKerpen-Sindorf
Certified lightning protection specialist company

Company History

  1. 1950

    Founded by Herbert Klammer at Leostraße in Cologne on 01.01.1950; managed until 1974.

  2. 1974

    Company taken over by Mr. Eberle as of 01.06.1974.

  3. 1980

    Relocation to Cologne-Marsdorf.

  4. 1992

    Relocation to the current location in Kerpen-Sindorf.

  5. 2004

    Takeover by Volker Westphal on 01.04.2004; management in the third generation.