
Specialist company for horizontal directional drilling (HDD) – utility installation without open trench
Bohrtec Teubner GmbH
06886 Lutherstadt WittenbergNew on Amplifa
About Bohrtec Teubner
Bohrtec Teubner GmbH, based in Lutherstadt Wittenberg, is a specialist company for horizontal drilling using the HDD method (horizontal directional drilling). The company installs pipes, conduits and cables trenchlessly beneath obstacles such as airports, port facilities, bridge structures, railway tracks, traffic routes, dikes and existing buildings. Its range of services covers complete site setup including logistics for material and equipment, pilot drilling, drill head locating and steering, single or stepped reaming, and pipe pull-in through to provision of the final utility lines. Another focus is environmentally friendly cable installation onshore and offshore for wind farms and energy facilities, particularly in the Wadden Sea, as well as crossings of environmental protection zones at bodies of water, biotopes and canals. Its competence in pipeline construction and horizontal drilling technology is certified under DVGW GW 302 GN2; its quality management is certified under DIN EN ISO 9001:2015.
- Site
- Lutherstadt Wittenberg
- Processes
- Horizontal drilling / HDD (horizontal directional drilling), Site setup incl. logistics of material and equipment, Pilot drilling, Drill head locating and steering, Reaming (single or stepped), Pipe pull-in, Reaming, Horizontal drilling (HDD method) / utility installation
- Materials
- Horizontal drilling (HDD method)
- Certificates
- DVGW GW 302 GN2 (Construction certification), DIN EN ISO 9001:2015, Occupational health and safety management system (AMS Bau), DVGW GW 302 GN2, AMS Bau (BG Bau)
- Industries
- Pipeline construction, Horizontal drilling technology / conduit construction, Cable installation for wind farms and energy facilities, Infrastructure (transport, rail, aviation, ports, dike construction)
- 01
Site setup incl. logistics of material and equipment
- 02
Pilot drilling
- 03
Drill head locating and steering
- 04
Reaming
- 05
Pipe pull-in
Processes and Services
Horizontal drilling (HDD method)
Trenchless utility installation from launch area to reception area beneath crossing obstacles such as traffic routes, bodies of water and structures.
Locations
Lutherstadt Wittenberg
DEHeadquarters
- Materials
- Pipes and conduits
Components


Inside the production


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Horizontal drilling / HDD (horizontal directional drilling)Engineering | – | – | – | – | Pipes and conduits (material not specified) |
| Site setup incl. logistics of material and equipmentAssembly | – | – | – | – | – |
| Pilot drillingEngineering | – | – | – | – | – |
| Drill head locating and steeringEngineering | – | – | – | – | – |
| Reaming (single or stepped)Engineering | – | – | – | – | – |
| Pipe pull-inAssembly | – | – | – | – | Pipes and conduits |
Additional services
Quality and Certifications
Its competence and quality in pipeline construction and horizontal drilling technology are certified under DVGW GW 302 GN2. Quality management is certified under DIN EN ISO 9001:2015 (ÖHMI EuroCert), complemented by an occupational health and safety management system AMS Bau; the company is a member of the Verband Güteschutz Horizontalbohrungen e.V. (DCA).
| Evidence | Lutherstadt Wittenberg |
|---|---|
| DIN EN ISO 9001:2015 | |
| DVGW GW 302 GN2 | |
| AMS Bau (BG Bau) |