Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
BS Spezialtiefbau – Fertigung

Special civil engineering from Bochum: drilling, driving and vibrating methods, steel construction, temporary bridges and railway works

BS Spezialtiefbau Logo

BS Spezialtiefbau GmbH & Co. KG

BochumNew on Amplifa

2005Founded
20.000 m²Construction yard in Bochum
HRB 10447, HRA 5785Commercial register
DeutschlandDelivery/service area

About BS Spezialtiefbau

BS Spezialtiefbau GmbH & Co. KG was founded in Bochum in 2005 by Dipl.-Ing. Andreas Sauer and industrial foreman and international welding specialist Berthold Schmitt. The company executes complex special civil engineering services, including special drilling methods with the driving of steel pipes up to 10 m in length in one piece and reaming from diameter 355 mm to 820 mm, pre-drilling with an auger from 150 to 600 mm, driving and vibrating work up to 15 m usable length, Berlin shoring, steel construction with walers, bracing and anchor systems as well as temporary bridges up to SLW 60 with spans up to 27 m. As a railway construction specialist, the company carries out work during closure periods and under live operations. A 20,000 m² construction yard in Bochum offers ready-to-use beams and sheet piles as well as an own machinery fleet with two large and one small pile hammer, two lattice boom cranes and an excavator. The company is listed as a prequalified construction company with DB Deutsche Bahn AG. Customers come from railway construction, infrastructure, power plant construction and water management.

Site
Bochum
Processes
Driving method for steel pipes (max. 10 m in one piece), Reaming of steel pipes, Railway works (closure periods, live operations), Steel construction (walers, bracing, anchor systems for excavation pits, retaining walls), Manufacture of temporary bridges, Berlin shoring (soldier pile wall shoring), Vibrating (installation and extraction of profiles), Pre-drilling (with auger, uncased)
Materials
Steel pipe, Steel (beams, sheet piles, steel construction), Steel
Certificates
Prequalification under § 6a VOB/A (Deutsche Bahn AG / PQ Association), PQ DB 2025 (prequalification Deutsche Bahn AG), Prequalification § 6a VOB/A, PQ DB Deutsche Bahn AG
Founded
2005
Industries
Railway construction (Deutsche Bahn), Special civil engineering, Infrastructure/Transport, Energy/Power plant construction, Water management, Infrastructure/Transport (bridges, roads)
  1. 01

    Consulting and concept development

  2. 02

    Site organisation

  3. 03

    Drilling, driving and vibrating work

  4. 04

    Steel construction (walers, bracing, anchor systems)

  5. 05

    On-site assembly

Materials & Methods

St

Steel

Beams, sheet piles and steel pipes for shoring, retaining walls, anchor systems and temporary bridges

StR

Steel pipe

Driving and reaming of steel pipes up to 10 m in length and diameters from 355 to 820 mm

Locations

Standort Bochum

Bochum

DE

Head office with construction yard (beam/sheet pile storage) and machinery fleet

Materials
Steel, steel pipe
  • 2 large pile hammers
  • 1 small pile hammer
  • 2 lattice boom cranes
  • 1 excavator
  • Diesel- and air-operated drop hammers

Components & Services

Driving of steel pipes up to 10 m
Driving of steel pipes up to 10 mDrilling method · Railway construction site
Temporary bridge
Temporary bridgeSteel construction · Infrastructure
Berlin shoring
Berlin shoringSoldier pile wall shoring · Road construction
Retaining wall with permanent anchors
Retaining wall with permanent anchorsSteel construction · Special civil engineering

Inside the production

Railway works, steel construction, power plant site Lünen
Railway works, steel construction, power plant site Lünen
Steel construction, Emschergenossenschaft site Dortmund
Steel construction, Emschergenossenschaft site Dortmund
In-house built driving cap for beams
In-house built driving cap for beams
Pre-drilling with auger
Pre-drilling with auger
A40 new Rhine bridge, preliminary measure
A40 new Rhine bridge, preliminary measure
Own machinery fleet on 20.000 m² construction yard
Own machinery fleet on 20.000 m² construction yard

Industries

Railway construction (Deutsche Bahn)Special civil engineeringInfrastructure/TransportEnergy/Power plant constructionWater managementInfrastructure/Transport (bridges, roads)Water management (Emschergenossenschaft)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Driving method for steel pipes (max. 10 m in one piece)Engineering–10 m––Steel pipe
Reaming of steel pipesEngineering––––Steel pipe
Railway works (closure periods, live operations)Assembly–––––
Steel construction (walers, bracing, anchor systems for excavation pits, retaining walls)Assembly––––Steel
Manufacture of temporary bridgesAssembly–Span up to 27 m––Steel
Berlin shoring (soldier pile wall shoring)Engineering––––Steel
Vibrating (installation and extraction of profiles)Engineering–15 m usable length––Sheet piles, Beams, Pipes
Pre-drilling (with auger, uncased)Engineering–Diameter 150 mm to 600 mm–––
Driving (diesel- and air-operated drop hammers)Engineering––––Sheet piles, Beams
Steel construction work (PQ service area 111-05)Assembly–––––
Drilling work (PQ service area 214-01)Engineering–––––
Driving, vibrating and pressing work (PQ service area 214-03)Engineering–––––

5 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Pile hammer (large)–2––Bochum
Pile hammer (small)–1––Bochum
Lattice boom crane–2––Bochum
Excavator–1––Bochum
Diesel- and air-operated drop hammers (pile hammers, various sizes)–––––

Additional services

Special drilling methods (driving of steel pipes up to 10 m in one piece, reaming fromRailway works (also under live operations / during closure periods)Steel construction (walers, bracing, anchor systems for excavation pits and retaining walls)Temporary bridges (up to SLW 60, span up to 27 m)Berlin shoring (soldier pile wall shoring)Vibrating (installation/extraction of profiles up to 15 m usable length)Pre-drilling (with auger, diameter 150–600 mm, uncased)Driving (diesel- and air-operated drop hammers)Site organisation and turnkey solutions in special civil engineering

Reference customers

DB Deutsche Bahn AG (prequalification)Emschergenossenschaft (construction site Dortmund)

Qualification

The company is prequalified under § 6a VOB/A (registration number 010.132440) and listed as a prequalified construction company with DB Deutsche Bahn AG (PQ DB 2025).

EvidenceBochum
Prequalification § 6a VOB/A
PQ DB Deutsche Bahn AG

History

  1. 2005

    Foundation of the special civil engineering company by Dipl.-Ing. Andreas Sauer and industrial foreman/international welding specialist Berthold Schmitt.

  2. 2018

    Initial prequalification on 28.06.2018 under § 6a VOB/A, registered under registration number 010.132440 (service areas steel construction work, drilling work, driving/vibrating/pressing work).

  3. 2018

    Site Düsseldorf A524 B288 July 2018 – retaining wall with permanent anchors (reference project).

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.