Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
BTOe – Fertigung

Specialist in mine stabilization, structural engineering, geotechnics/special civil engineering, civil engineering and hydraulic engineering from Oelsnitz in the Erzgebirge.

BTOe Logo

BTOe-Bergbau und Tiefbau GmbH Oelsnitz (Erzgeb.)

Oelsnitz/Erzgeb.New on Amplifa

1976Founded
over 55Employees
HR B 1009, Amtsgericht ChemnitzCommercial register
2002Launch of the hydraulic engineering business field

Company

BTOe-Bergbau und Tiefbau GmbH Oelsnitz (Erzgeb.) is a Saxon medium-sized construction company with roots in the Oelsnitz hard coal mining industry. Founded in 1976 as VEB Bergbauerkundung and converted in 1992 through a management buy-out, the company has specialized in the remediation and securing of old mining sites. Its range of services includes mine stabilization work, drilling and blasting work, rock and slope stabilization, structural engineering with planning, design and construction of technical structures made of concrete, geotechnics/special civil engineering, civil engineering and, since the 2002 millennium flood, hydraulic engineering. Work includes excavation pit support, soil nailing, pile foundations, bridges, retaining walls, embankment walls and demolition work. Customers are municipalities and public authorities, construction contractors and investors, primarily in Saxony. The company employs more than 55 staff and trains its own skilled workers.

Site
Oelsnitz/Erzgeb.
Processes
Mine stabilization work & mining remediation, Remediation and securing of old mining sites, Drilling & blasting work, Rock & slope stabilization, Tunnel crossings, Concrete work, Structure erection (bridges, retaining walls, embankment walls), Restoration & stabilization
Materials
Concrete, GRP gratings (glass-fiber reinforced plastic), Concrete (wet spraying process), GRP grating (glass-fiber reinforced plastic)
Certificates
Pre-qualification (PQ Association)
Founded
1976
Employees
over 55
Industries
Mining/remediation of old mining sites, Construction/structural engineering, Civil engineering/geotechnics, Hydraulic engineering, Municipalities/public sector, Investors/construction contractors
  1. 01

    Planning and design

  2. 02

    Drilling and blasting work

  3. 03

    Earthworks and civil engineering work

  4. 04

    Concrete work and structure erection

  5. 05

    Remediation, securing and restoration

Construction materials and processes

Beton

Concrete

Used in concrete work and the construction of bridges, retaining walls, edge beams and foundations.

Spritzbeton

Concrete (wet spraying process)

Used for retaining walls in the wet spraying process.

GFK

GRP grating (glass-fiber reinforced plastic)

Installed in tunnels such as the Elbe tunnel to secure walkways.

Location

Oelsnitz/Erzgeb.

DE

Company headquarters and operating site

Materials
Beton, Spritzbeton, GFK

Inside the production

Team of BTOe
Team of BTOe

Industries

Mining/remediation of old mining sitesConstruction/structural engineeringCivil engineering/geotechnicsHydraulic engineeringMunicipalities/public sectorInvestors/construction contractors

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Mine stabilization work & mining remediationCivil engineering–––––
Remediation and securing of old mining sitesCivil engineering–––––
Drilling & blasting workCivil engineering–––––
Rock & slope stabilizationCivil engineering–––––
Tunnel crossingsCivil engineering–––––
Concrete workAssembly––––Beton
Structure erection (bridges, retaining walls, embankment walls)Assembly–––––
Restoration & stabilizationAssembly–––––
Remediation workAssembly–––––
Retaining wall using the wet spraying processAssembly––––Beton (Spritzbeton)
Soil nailingCivil engineering–––––
Foundations and re-foundingCivil engineering–––––
Excavation pit supportCivil engineering–––––
Slope and embankment stabilizationCivil engineering–––––
Rock and uplift stabilizationCivil engineering–––––
Tunnel and miningCivil engineering–––––
Securing and backfill drillingCivil engineering–––––
Special applications, Drill DrainCivil engineering–––––
Pile foundationsCivil engineering–––––
Civil engineering work (supply/disposal of water & energy, development construction work)Civil engineering–––––
Surveying workEngineering–––––
Demolition work / tip regradingCivil engineering–––––
Hydraulic engineeringCivil engineering–––––

Additional services

Mine stabilization (mine stabilization work & mining remediation)Drilling & blasting workRock & slope stabilizationTunnel crossingsStructural engineering (planning, design, construction of technical structures)Concrete workStructure erection (bridges, retaining walls, embankment walls)Restoration & stabilizationRemediation workGeotechnics/special civil engineering (soil nailing, foundations/re-founding, excavation pitSecuring and backfill drillingSpecial applications Drill DrainCivil engineering (supply/disposal, development construction work, surveying work)Demolition work/tip regradingHydraulic engineering (flood damage repair)

Quality

BTOe is a pre-qualified construction company (pre-qualification procedure PraxisGmbH, registration number 101.000526). The professional, customized planning and construction of structures is carried out by its own engineers and skilled workers.

EvidenceOelsnitz/Erzgeb.
Pre-qualification (PQ Association)

History

  1. 1976

    Founded as VEB Bergbauerkundung

  2. 1992

    Converted through a management buy-out (MBO) to BTOe-Bergbau und Tiefbau GmbH Oelsnitz (Erzgeb.)

  3. 2002

    Millennium flood – opening up of the new field of hydraulic engineering

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo