Control cabinet construction, switchgear systems and automation solutions for industry – from planning to commissioning
BWC Lindau Elektro- und Energietechnik GmbH / BWC Lindau Schaltanlagenbau GmbH
Lindau (Bodensee)New on Amplifa
About BWC Lindau
BWC Lindau is a mid-sized company for electrical planning, programming and control cabinet construction with a focus on industrial automation. Since 1989, the company has been designing and implementing complex automation solutions, control systems and visualizations for a wide range of applications in Lindau (Lake Constance). Its service portfolio includes consulting and planning, hardware and software engineering (including Eplan P8, Siemens S5/S7, Allen-Bradley, B&R, ABB, Pilz, WinCC, TIA), mechanical processing, assembly and wiring of control cabinets, quality and function tests, on-site commissioning, and services such as repairs, conversions and online remote monitoring. Special requirements for control cabinet construction, such as extreme temperatures, high voltages or specific hygiene regulations, are implemented. Customers come from the chemical, pharmaceutical, food production, refinery, industrial plant and energy supply industries; reference customers include Engie, Friotherm, FrigorTec, Proweps, Equans and Johnson Controls. Control cabinet manufacturing takes place at the headquarters in Lindau by trained specialists.
- Site
- Lindau (Bodensee)
- Processes
- Switchgear construction / control cabinet construction, Control and plant engineering / automation solutions, Consulting & planning of switchgear systems and control systems, Hardware planning (Eplan P8, ES Plan), Mechanical processing, Assembly / installation of mounting plates & control cabinets, Wiring of switchgear systems, Quality inspection / function tests / machine safety
- Materials
- Eplan P8 / ES Plan, PLC Programming (Siemens Logo/S5/S7, Moeller, Allen-Bradley, B&R, ABB, Pilz), Visualization (WinCC, WinCC flexible, ProTool, TIA)
- Certificates
- DIN EN ISO 9001:2015, ISO 9001
- Founded
- 1989
- Employees
- up to 49
- Industries
- Chemicals, Pharmaceuticals, Food Production, Refineries, Industrial Plants, Energy Supply
- 01
Consulting & Planning
- 02
Hardware and Software Engineering
- 03
Mechanical Processing
- 04
Assembly & Installation
- 05
Wiring
- 06
Quality Inspection / Machine Safety
- 07
Commissioning
- 08
Service
Processes & Systems
Eplan P8 / ES Plan
CAD-supported hardware planning for circuit and wiring diagrams.
PLC Programming (Siemens Logo/S5/S7, Moeller, Allen-Bradley, B&R, ABB, Pilz)
Software engineering of control systems including safety controls according to Pilz.
Visualization (WinCC, WinCC flexible, ProTool, TIA)
Visualization systems for process control and monitoring.
Locations
Lindau (Bodensee)
DEHeadquarters, control cabinet manufacturing
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Switchgear construction / control cabinet constructionAssembly | – | – | – | – | – |
| Control and plant engineering / automation solutionsEngineering | – | – | – | – | – |
| Consulting & planning of switchgear systems and control systemsEngineering | – | – | – | – | – |
| Hardware planning (Eplan P8, ES Plan)Engineering | – | – | – | – | – |
| Engineering | – | – | – | – | – |
| Mechanical processingMachining | – | – | – | – | – |
| Assembly / installation of mounting plates & control cabinetsAssembly | – | – | – | – | – |
| Wiring of switchgear systemsAssembly | – | – | – | – | – |
| Quality inspection / function tests / machine safetyTesting | – | – | – | – | – |
| On-site commissioning with simulation and interface testsTesting | – | – | – | – | – |
| Service: repairs, conversions, expansions, online remote monitoringAssembly | – | – | – | – | – |
| CAD-supported planning and programming of CNC machining machinesMachining | – | – | – | – | – |
Additional services
Reference customers
Quality
All components, systems and control units are tested for functionality and compatibility in accordance with national, European and international directives before installation. Commissioning takes place on site with simulation of all machine and plant functions as well as interface tests.
| Evidence | Lindau (Bodensee) |
|---|---|
| ISO 9001 |
History
- 1989
Foundation; registration of BWC Lindau Elektro- und Energietechnik GmbH on 20.09.1989 (Amtsgericht Kempten, HRB 3711).
- 2003
Determination of share capital at 50,000 DEM (10.02.2003).
- 2014
Relocation to the address Heuriedweg 32, Lindau (Bodensee) (09.12.2014).