Fully automated production of precast driven piles for deep foundations in geotechnical special engineering.

Centrum Pfähle GmbH
GermaringenNew on Amplifa
About Centrum Pfähle
Centrum Pfähle GmbH, based in Germaringen (Bavaria), specializes in the production of precast driven piles and is part of the globally operating Aarsleff Group. The Germaringen pile plant went into operation in June 2016 and is the newest of a total of five Centrum pile plants in Denmark, Sweden, Poland, the United Kingdom and Germany. Production is fully automated: the reinforcement cages are welded on a fully automatic system with an electronically controlled welding robot, then placed in specially made steel formwork and concreted and compacted by means of a concrete pouring plant. Only certified concrete and steel from recognized European steelworks are purchased. Customers are companies in geotechnical special engineering and construction, in particular for deep foundations. Each plant can produce up to 1,000,000 linear meters of pile per year; verified type static calculations and data sheets are available via a virtual plant tour.
- Site
- Germaringen
- Processes
- Production of precast driven piles (Centrum precast piles / CPS Centrum Pile System), Welding of the reinforcement cages on a fully automatic system with electronically controlled, Concreting in steel formwork with compaction (concrete pouring plant), Fully automated production of precast driven piles (reinforcement welding, concreting), Virtual plant tour, Verified type static calculations and data sheets
- Materials
- Concrete (certified in accordance with applicable standards), Steel (from recognized European steelworks, complies with European steel standards), Certified concrete, Reinforcement steel from European steelworks
- Certificates
- Weekly in-house testing of materials at the plant, Monitoring by recognized testing institutes, Verified type static calculations
- Founded
- 2016
- Industries
- Geotechnical special engineering / Deep foundations, Construction, Civil engineering/Special geotechnical engineering (deep foundations)
- 01
Procurement of certified concrete and steel from recognized European
- 02
Fully automatic welding of the reinforcement cages with electronically
- 03
Machine placement of spacers
- 04
Insertion of the reinforcement cages into specially made steel formwork
- 05
Concreting and compacting by means of a concrete pouring plant
- 06
Weekly in-house testing of the materials and monitoring by recognized
Materials and Processes
Certified concrete
Certified in accordance with applicable standards and the basis of the precast driven pile.
Reinforcement steel from European steelworks
Purchased directly from recognized European steelworks and used for the reinforcement cages in accordance with the European steel standards.
Sites

Germaringen
DEProduction plant and company headquarters
- Materials
- Concrete, Steel
- Fully automatic welding system with electronically controlled welding robot for reinforcement cages
- Concrete pouring plant
- Steel formwork
Components


Inside the production


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Production of precast driven piles (Centrum precast piles / CPS Centrum Pile System)Casting | high dimensional accuracy (not quantified) | up to 1,000,000 linear meters of pile | – | – | Concrete, Steel (reinforcement) |
| Welding of the reinforcement cages on a fully automatic system with electronically controlledJoining | – | – | – | – | Steel |
| Concreting in steel formwork with compaction (concrete pouring plant)Casting | – | – | – | – | Concrete |
2 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Fully automatic welding system / electronically controlled welding robot (reinforcement cages) | – | 1 | – | – | Germaringen pile plant |
| Concrete pouring plant | – | 1 | – | – | Germaringen pile plant |
Additional services
Reference customers
Quality
The CPS Centrum Pile System ensures prefabrication in its own plants that specialize exclusively in precast piles. Each pile plant performs an incoming inspection of the materials used every week; these quality controls are continuously monitored by recognized testing institutes.
| Evidence | Germaringen |
|---|---|
| Weekly in-house testing of materials at the plant | |
| Monitoring by recognized testing institutes | |
| Verified type static calculations |
History
- 1965
Foundation of the first own pile plant in Denmark (Aarsleff Group).
- 2016
Production of the first precast pile at the company headquarters in Germaringen; the newest of a total of five pile plants (Denmark, Sweden, Poland, United Kingdom, Germany).