Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
DELTA Computer – Fertigung

Configuration, assembly and integration of high-performance servers, GPU systems and HPC/AI clusters for research and industry

DELTA Computer Logo

DELTA Computer Products GmbH

Glinde (DE)New on Amplifa

1985Founded
Glinde near HamburgLocation
ISO 9001, ISO 14001, ISO 27001Certifications
NVIDIA Elite PartnerPartner title since 2018

About DELTA Computer Products

DELTA Computer Products GmbH, based in Glinde near Hamburg, develops, configures and integrates high-performance IT infrastructures: servers (rack chassis 1U–4U and tower), GPU servers with up to eight GPU/MIC units per system, NVIDIA DGX systems, workstations as well as scaled cluster and SuperPOD solutions based on Intel Xeon 6, AMD EPYC 9005, NVIDIA Grace Blackwell, InfiniBand and Ethernet interconnects. The systems are assembled in Glinde from components from SuperMicro, Quanta, Tyan, Asus and Gigabyte; every system undergoes an HPL Linpack stress test (minimum 48, maximum 120 hours) as well as firmware updates and test installations. Customers include research and academia, industry, AI/deep learning environments and the public sector; references include DeepL SE, MTU Aero Engines, CERN, ETH Zurich and RWTH Aachen. DELTA is an NVIDIA Elite Partner and delivers across Europe and worldwide, including installation, data center connection and support with a response time of 1–3 hours.

Site
Glinde
Processes
Configuration and assembly of high-performance servers (rack servers 1U-4U, tower), GPU/MIC server assembly (up to 10 GPU adapters per chassis, up to 8x GPU/MIC, NVLink), Cluster systems / HPC cluster integration, Hardware installation & data center connection, Quality assurance: stress testing of systems (HPL Linpack, minimum 48 hrs, max. 120 hrs per 1GB, Artificial intelligence / deep learning / machine learning / HPC system solutions, System configuration/configurator, Quality assurance including stress test (HPL Linpack, 48–120h)
Materials
NVIDIA DGX B300 / B200 / H100 / GB300 Grace Blackwell Superchip, AMD EPYC 9005 processors, Intel Xeon 6 processors, NVIDIA Grace CPU Superchip, DDR5 RAM up to 6400 (up to 4096GB), NVMe/SATA/SAS HotSwap storage, NVIDIA DGX (B300/B200/H100/GB200-NVL72), NVIDIA GB300 Grace Blackwell Ultra Desktop Superchip
Certificates
ISO 9001, ISO 14001, ISO 27001, IATF 16949, EN 9100
Founded
1985
Industries
High Performance Computing, Artificial Intelligence, Deep Learning, Machine Learning, Research & Academia, Industry
  1. 01

    Inquiry & Consulting

  2. 02

    System configuration (configurator)

  3. 03

    Component selection & incoming goods inspection

  4. 04

    Assembly/assembly in Glinde

  5. 05

    Firmware update & Linux test installation

  6. 06

    Stress test (HPL Linpack, 48–120 h)

  7. 07

    Measurement of power consumption, temperature, performance

  8. 08

    Shipping (UPS / Kühne & Nagel, worldwide)

  9. 09

    Installation & data center connection

  10. 10

    RMA/replacement service & support

Technologies & Components

DGX

NVIDIA DGX (B300/B200/H100/GB200-NVL72)

Unified AI platforms with 8× SXM GPUs over NVLink for deep learning training and inference.

GB300

NVIDIA GB300 Grace Blackwell Ultra Desktop Superchip

Superchip for water-cooled GPU workstations with 252 GB HBM3E.

Xeon6

Intel Xeon 6

Processors (up to 350/500 W TDP) for dual-Xeon GPU servers with up to 4096 GB DDR5-6400.

EPYC9005

AMD EPYC 9005

Processors (up to 500 W TDP) for air-cooled rack servers up to 8× GPU/MIC.

Grace

NVIDIA Grace CPU Superchip

144-core CPU with 480 GB LPDDR5X for servers with up to 4× GPU.

DDR5

DDR5 RAM up to 6400 (up to 4096 GB)

Main memory in 12–32 DIMM slots depending on chassis.

NVMe

NVMe/SATA/SAS HotSwap storage

Gen4/Gen5 hot-swap storage media in 2.5"/3.5" bays and E1.S.

IB

InfiniBand & Ethernet Interconnect

NDR/EDR InfiniBand and 400/800GbE switches for cluster networking.

Sites

Standort Glinde

Glinde

DE

Headquarters with assembly, quality assurance and test center

Lot size
Configuration from one-off pieces to cluster scale
Materials
Intel Xeon 6, AMD EPYC 9005, NVIDIA DGX/Grace Blackwell, DDR5, NVMe
  • System configurator
  • Stress test environment (HPL Linpack)
  • Test center
  • Incoming goods inspection with anti-static/climate treatment

Systems & Products

D22x-M4-SP-8xGPU – Intel Dual Xeon GPU Server
D22x-M4-SP-8xGPU – Intel Dual Xeon GPU ServerRack server 4U · HPC/AI
D23z-M4-ZT-8xGPU – AMD Dual EPYC GPU Server
D23z-M4-ZT-8xGPU – AMD Dual EPYC GPU ServerRack server 4U · HPC/AI
NVIDIA DGX GB300 NVL72
NVIDIA DGX GB300 NVL72AI platform · AI Factory
HPC/AI clusters
HPC/AI clustersCluster integration · Research & Industry
High-performance servers (rack)
High-performance servers (rack)Server assembly · Research & Academia
D15n-WK-GB-GB300-EDU Workstation
D15n-WK-GB-GB300-EDU WorkstationTower water-cooled · AI development
Rack systems in the data center
Rack systems in the data centerInstallation & data center connection · Industry

Inside the production

UPS and PDU infrastructure
UPS and PDU infrastructure
NVIDIA AI Enterprise software platform
NVIDIA AI Enterprise software platform
NVIDIA Vera Rubin event in Glinde
NVIDIA Vera Rubin event in Glinde

Industries

High Performance ComputingArtificial IntelligenceDeep LearningMachine LearningResearch & AcademiaIndustryPublic Sector

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Configuration and assembly of high-performance servers (rack servers 1U-4U, tower)Assembly––––Server components (SuperMicro, Quanta, Tyan, Asus,
GPU/MIC server assembly (up to 10 GPU adapters per chassis, up to 8x GPU/MIC, NVLink)Assembly––––NVIDIA GPUs, Intel Xeon, AMD EPYC
Cluster systems / HPC cluster integrationAssembly––––NVIDIA DGX/GB200-NVL72, AMD dual EPYC, InfiniBand NDR/EDR
Hardware installation & data center connectionAssembly–––––
Quality assurance: stress testing of systems (HPL Linpack, minimum 48 hrs, max. 120 hrs per 1GBTesting–––––
Artificial intelligence / deep learning / machine learning / HPC system solutionsEngineering–––––

5 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
High-performance server (2U rack chassis, air-cooled)DELTA (based on SuperMicro, Quanta, Tyan, Asus, Gigabyte) D22x-M2-SP-4xGPU–2x Intel Xeon 6 (max. 350W TDP), 32 DIMM (max. 4096GB DDR5-6400), up to 4x GPU/MIC–Glinde
High-performance server (4U rack chassis, air-cooled)DELTA D22x-M4-SP-8xGPU / D23z-M4-ZT-8xGPU–2x Intel Xeon 6 or 2x AMD EPYC 9005, up to 8x GPU/MIC (max. 600W TDP)–Glinde
GPU workstation (tower, water-cooled)DELTA / NVIDIA D15n-WK-GB-GB300-EDU–NVIDIA GB300 Grace Blackwell Ultra Desktop Superchip, 252GB HBM3E–Glinde
AI platform (NVIDIA DGX)NVIDIA DGX B300 2304GB–8x NVIDIA SXM B300 288GB GPUs, 2x Intel Xeon 6776P, ~15kW max–Glinde
Ethernet/InfiniBand switchesNVIDIA, SuperMicro, Edge-corE, QuantaMesh, Netgear e.g. NVIDIA MSN5610 (64x 800GbE OSFP), MSN5400, MSN4700–up to 64x 800GbE OSFP–Glinde

Additional services

System configuration/configuratorQuality assurance including stress test (HPL Linpack, 48–120h)RMA/replacement serviceDefective Media Retention Service (DMR)Installation & data center connectionSoftware integration (Linux installation to customer specification)Configuration archiving for identical reordersWorldwide shipping (UPS, Kühne & Nagel)Support with 1–3h response time

Reference customers

DeepL SEMTU Aero Engines AGTufa Labs AGFraunhofer AISECUniversity of MünsterMannheim University of Applied SciencesCERNETH ZurichRWTH AachenForschungszentrum JülichKarlsruhe Institute of TechnologyTechnical University of MunichPhysikalisch-Technische Bundesanstalt

Quality & Certifications

Regardless of form factor and value, every system undergoes an HPL Linpack stress test (one hour per 1 GB of RAM, minimum 48, maximum 120 hours) including firmware updates, test installation and measurement of power consumption, temperatures and performance values in idle and load scenarios. Configurations are archived on request, so that reorder deliveries provide identical machines.

EvidenceGlinde
ISO 9001
ISO 14001
ISO 27001
IATF 16949
EN 9100

Company History

  1. 1985

    Founded as a provider of high-performance servers and special solutions for professional IT infrastructures.

  2. 1990

    Establishment as a specialist for SMP servers and cluster systems (1990s).

  3. 2000

    Focus on numerical simulation, flow research and HPC workloads in Linux and Windows environments (2000s).

  4. 2010

    Integration of NVIDIA GPU-accelerated high-performance computers; Europe-wide delivery of HPC and deep learning infrastructures.

  5. 2015

    First delivery of NVIDIA DGX systems.

  6. 2018

    NVIDIA Elite Partner; multiple Star Performer Central Europe awards.

  7. 2019

    ML/AI training clusters in use across Europe; Philip Hellmann joins the company.

  8. 2023

    Delivery of 100× NVIDIA DGX H100 (800× H100) to DeepL SE.

  9. 2024

    HPC cluster with 192× AMD dual EPYC (12,288 cores) for MTU Aero Engines.

  10. 2025

    40th anniversary, 8× NVIDIA DGX GB200-NVL72 for DeepL SE, opening of the new company building in Glinde.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo