Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Dennert ProjektEINS – Fertigung

Industrial prefabrication of solid wall and ceiling elements, bathroom modules and building shells using the ALFA building system

Dennert ProjektEINS Logo

Dennert ProjektEINS GmbH

96132 SchlüsselfeldNew on Amplifa

Project construction division ofBusiness unit
99 %Degree of prefabrication of the components
Schlüsselfeld (Bavaria)Production site

About Dennert ProjektEINS

Dennert ProjektEINS GmbH, the project construction division of Dennert Massivhaus GmbH, manufactures concrete precast elements for residential and project construction in Bavaria according to its own ALFA building system. The product range includes prefabricated ALFA solid walls with factory-integrated external thermal insulation composite systems, windows, doors and conduits, precast ceiling slabs (DX ceilings), watertight WU basements as well as fully tiled and fully equipped bathroom modules. 99 percent of the concrete elements are prefabricated in the company's own production facilities; utility lines and connections are already integrated. On the construction site, the company's own team assembles the elements within just a few days, resulting in a finished building shell including render. Customers include property developers, construction contractors, architects, investors and operators of social institutions such as Diakonie Bamberg-Forchheim. Projects realised include multi-family houses, care and social facilities as well as inner-city densification projects. The site and production are located in Schlüsselfeld (district of Bamberg).

Site
Schlüsselfeld
Processes
Prefabrication of wall elements (ALFA solid wall with external thermal insulation composite system,, Production of DX ceilings (precast ceilings), Construction of WU basements (watertight basements), Prefabrication of bathroom modules (fully tiled sanitary rooms with shower, washbasin, WC), Industrial prefabrication of components (99% degree of prefabrication, utility lines and connections, Assembly of precast elements on the construction site, Technical planning / technical office for construction projects, Erection of building shells incl. render and components (external thermal insulation composite
Materials
Concrete, Grouting concrete, External thermal insulation composite system (ETICS)
Industries
Property developers, Construction contractors, Architects/planners, Investors, Operators of social institutions (care)
  1. 01

    Technical planning / technical office

  2. 02

    Manufacture of wall and ceiling elements (ALFA solid wall, DX ceiling)

  3. 03

    Factory integration of thermal insulation composite systems, windows, doors,

  4. 04

    Prefabrication of bathroom modules

  5. 05

    Assembly of the elements on the construction site

  6. 06

    Completion of the building shell incl. render

Materials and Building System

Beton

Concrete

Construction material of the ALFA solid walls and precast ceilings; natural, stable and freely plannable in application.

VB

Grouting concrete

Documented as a material used according to company information.

WDVS

External thermal insulation composite system (ETICS)

Integrated into the wall elements at the factory, so that a finished building shell including render is created.

Locations

Standort Schlüsselfeld

Schlüsselfeld

DE

Headquarters and production

Materials
Concrete, grouting concrete

Components

ALFA solid wall with external thermal insulation composite system
ALFA solid wall with external thermal insulation composite systemConcrete precast element · Residential and project construction
DX ceiling (precast ceiling)
DX ceiling (precast ceiling)Concrete precast element · Residential and project construction
Bathroom module (fully tiled and equipped)
Bathroom module (fully tiled and equipped)Prefabrication · Care and social facilities
Building shell incl. render and components
Building shell incl. render and componentsElement assembly · Multi-family houses

Inside the production

Day care centre Schlüsselfeld of Diakonie Bamberg-Forchheim
Day care centre Schlüsselfeld of Diakonie Bamberg-Forchheim
ALFA building system for property developers and construction contractors
ALFA building system for property developers and construction contractors
Prefabricated wall and ceiling elements
Prefabricated wall and ceiling elements

Industries

Property developersConstruction contractorsArchitects/plannersInvestorsOperators of social institutions (care)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Prefabrication of wall elements (ALFA solid wall with external thermal insulation composite system,Assembly––––Beton
Production of DX ceilings (precast ceilings)Assembly––––Beton
Construction of WU basements (watertight basements)Assembly––––Beton
Prefabrication of bathroom modules (fully tiled sanitary rooms with shower, washbasin, WC)Assembly–––––
Industrial prefabrication of components (99% degree of prefabrication, utility lines and connectionsAssembly––––Beton
Assembly of precast elements on the construction siteAssembly––––Beton
Technical planning / technical office for construction projectsEngineering–––––
Erection of building shells incl. render and components (external thermal insulation compositeSurface––––Beton

Additional services

ALFA building system (solid prefabricated house)Factory production of wall and ceiling elements (ALFA solid wall, DX ceiling)Assembly of the elements on the construction siteBathroom modules (factory-tiled, fully equipped)External thermal insulation composite system integrated at the factoryTechnical office / project planningConstruction of multi-family houses, care and social facilities

Reference customers

Diakonie Bamberg-Forchheimprivate investor (multi-family house Bavarian-Saxon border)inner-city densification Augsburg

History

  1. 2020

    Multi-family house project with 8 residential units including basement on the Bavarian-Saxon border; building erected in five weeks.

  2. Day care centre Schlüsselfeld of Diakonie Bamberg-Forchheim put into operation in October after 14 months of construction; delivery of 610 sqm of DX ceilings and around 670 sqm of wall elements.

  3. Densification in Augsburg city centre: three buildings with a total of 27 residential units constructed within a few weeks on an infill site.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo