
Control cabinet construction, electrical engineering, software engineering, installation and commissioning of machines and systems.

DVE Dangelmaier & Villforth Energieanlagenbau GmbH
Süßen (DE)New on Amplifa
About us
DVE Dangelmaier & Villforth Energieanlagenbau GmbH was founded in 1991 by Rolf Dangelmaier and Harald Villforth and has operated as a GmbH since 1998. The company in Süßen offers automation solutions from a single source: from electrical engineering and circuit diagram creation with ePLAN P8, through software programming for common PLC systems, to control cabinet construction in accordance with VDE 0113, EN 60204 and EN 61439. In addition, dve GmbH performs machine and system installation including on-site cabling, commissioning with sensor and actuator testing as well as drive and cycle time optimization, initial and repeat inspections in accordance with DGUV V3, plus service, maintenance and retrofitting. A proprietary stamping-stack software controls the stacking of stator and rotor stacks made of electrical sheet steel for electric motors. More than 30 employees work in their own production and office facilities on projects ranging from one-off units to large-scale series, with installation and commissioning carried out worldwide.
- Site
- Süßen
- Processes
- Machine and system installation / electrical installation incl. on-site cabling, Commissioning (sensors/actuators, drive and cycle time optimization, safety check with safety, Service/maintenance, retrofitting/expansion, Inspection of electrical industrial systems and special-purpose machinery, Electrical engineering / project planning (circuit diagram creation with ePLAN P8 incl. fluid), Software development (PLC programming, visualization, Industry 4.0), Control cabinet construction and control cabinet manufacturing, Machine and system installation
- Materials
- Electrical sheet steel, Electrical steel strip
- Certificates
- DIN EN ISO 9001:2015, ISO 9001
- Founded
- 1991
- Employees
- 30+
- Industries
- Automation technology, Electrical engineering, Machine and plant engineering, Electric motors (stamping and stacking of stator/rotor stacks)
- 01
Project planning / electrical engineering
- 02
Software development
- 03
Control cabinet construction
- 04
Machine and system installation
- 05
Commissioning
- 06
Inspections and service
Materials and processes
Electrical sheet steel
Material for stamping and stacking of stator and rotor stacks, controlled by the proprietary stacking control software.
Electrical steel strip
Processed in the stamping and stacking process together with electrical sheet steel into stacks for electric motors.
Locations

Süßen
DEProduction and office (own production and office facilities)
- Lot size
- One-off units to large-scale series
Services and components


Inside the production







Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Engineering | – | – | – | One-off unit – Large-scale series | – |
| Engineering | – | – | – | – | – |
| Assembly | – | – | – | – | – |
| Machine and system installation / electrical installation incl. on-site cablingAssembly | – | – | – | – | – |
| Commissioning (sensors/actuators, drive and cycle time optimization, safety check with safetyAssembly | – | – | – | – | – |
| Inspection | – | – | – | – | – |
| Engineering | – | – | – | – | Electrical sheet steel, Electrical steel strip |
| Service/maintenance, retrofitting/expansionAssembly | – | – | – | – | – |
| Inspection of electrical industrial systems and special-purpose machineryInspection | – | – | – | – | – |
Additional services
Quality
Control cabinets are inspected after production and documented with a measurement protocol; the safety check is documented by means of a safety matrix. Initial and repeat inspections are carried out in accordance with DGUV V3 (BGV A3, VDE 0701/0702, VDE 0113).
| Evidence | Süßen |
|---|---|
| ISO 9001 |
History
- 1991
Foundation of Dangelmaier & Villforth Energieanlagenbau in April by Rolf Dangelmaier and Harald Villforth; initially control cabinet construction and electrical installation of production systems and machine tools.
- 1998
Foundation of dve-Energieanlagenbau GmbH as the conclusion of the vertical integration process (circuit diagrams, software programming, commissioning).
- 2000
Move into the company's own production and office facilities in Süßen.