Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
E. Kalt AG – Fertigung

Planning, execution and maintenance of ventilation, air-conditioning and refrigeration systems, including cleanroom and ATEX solutions.

E. Kalt AG Logo

E. Kalt AG, Klima- und Energietechnik

Basel · Gümligen (municipality of Muri near Bern)New on Amplifa

1943Founded
ca. 80Team members (including apprentices)
2Locations in Switzerland

About E. Kalt AG

E. Kalt AG is a Swiss company for air-conditioning, ventilation and refrigeration systems headquartered in Basel with a branch office in Gümligen near Bern. Its range of services covers consulting, planning, execution, installation as well as maintenance and servicing of ventilation, air-conditioning and refrigeration systems, complemented by a 24-hour on-call service 365 days a year. The company specializes in demanding applications, including HVAC systems for cleanrooms (e.g. ISO 8/D and ISO 7C), exhaust air systems in ATEX design, and energy and heating integration with district heating and heat pumps. Customers come from the pharmaceutical, chemical, healthcare, hospitality, retail, industrial and public sectors, including F. Hoffmann-La Roche, Novartis, Lonza and Janssen Vaccines. The stock corporation was founded in 1943 by Edi Kalt and, since two management buy-outs, has been run by its executive management.

Site
Basel
Processes
Ventilation and air-conditioning technology (consulting, planning, execution, maintenance), Ventilation system installation and mounting, Refrigeration technology (refrigeration systems, refrigeration plants), HVAC system engineering for cleanrooms (e.g. ISO 8/D, ISO 7C), Exhaust air systems in ATEX design, In-house manufacturing of monoblocs, fans and ventilation ducts (historical, through, Energy and heating integration (district heating, air/water heat pump, change-over operation), Servicing, preventive maintenance and fault management (24h/365-day on-call service)
Materials
Stainless steel, Plastic
Certificates
Certifications according to website
Founded
1943
Industries
Pharmaceuticals, Chemicals, Healthcare/Hospitals, Hospitality/Catering, Retail, Industry/Production
  1. 01

    Consulting

  2. 02

    Planning and design

  3. 03

    Execution and installation

  4. 04

    Commissioning

  5. 05

    Maintenance and fault management

Materials and System Components

Edelstahl

Stainless steel

Used in ventilation system installations, for example for exhaust air systems in ATEX design at Novartis Pharma.

Kunststoff

Plastic

Used for gas-tight plastic dampers in supply and exhaust air ducts, for example at Actelion Pharmaceuticals.

Locations

Basel

CH

Headquarters, workshop and technical office

Gümligen (municipality of Muri near Bern)

CH

Branch office and technical office

Systems and Reference Projects

HVAC and ventilation systems for pharmaceutical cleanrooms
HVAC and ventilation systems for pharmaceutical cleanroomsSystem engineering · Pharma
Heating and ventilation systems in tenant fit-outs
Heating and ventilation systems in tenant fit-outsPlanning and execution · Administration
Ventilation and air-conditioning systems for office buildings
Ventilation and air-conditioning systems for office buildingsExecution · Office buildings

Inside the production

System installation
System installation
Ventilation and air-conditioning technology on the construction site
Ventilation and air-conditioning technology on the construction site
Installation of ventilation ducts
Installation of ventilation ducts
Refrigeration and air-conditioning technology
Refrigeration and air-conditioning technology
System technology in operation
System technology in operation
Servicing and maintenance
Servicing and maintenance
Project execution ventilation/air conditioning
Project execution ventilation/air conditioning
Technical office and planning
Technical office and planning
System engineering ventilation/air conditioning
System engineering ventilation/air conditioning

Industries

PharmaceuticalsChemicalsHealthcare/HospitalsHospitality/CateringRetailIndustry/ProductionPublic sectorEnergy sectorBanks/Administration

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Ventilation and air-conditioning technology (consulting, planning, execution, maintenance)Engineering–––––
Ventilation system installation and mountingAssembly––––Edelstahl
Refrigeration technology (refrigeration systems, refrigeration plants)Assembly–––––
HVAC system engineering for cleanrooms (e.g. ISO 8/D, ISO 7C)Assembly–––––
Exhaust air systems in ATEX designAssembly––––Edelstahl
In-house manufacturing of monoblocs, fans and ventilation ducts (historical, throughJoining–––––
Energy and heating integration (district heating, air/water heat pump, change-over operation)Engineering–––––
Servicing, preventive maintenance and fault management (24h/365-day on-call service)Assembly–––––

Additional services

ConsultingPlanningExecution/InstallationMaintenanceServicing/Fault managementSystem engineering for ventilation/air conditioning/refrigeration24/7 on-call serviceCleanroom ventilation technologyHeat treatment not relevant — heat supply/heating (district heating, heat pumps)

Reference customers

F. Hoffmann-La Roche AGNovartis PharmaActelion Pharmaceuticals Ltd.Lonza AGJanssen Vaccines AGEmergent BioSolutions Berna GmbHThermo Fisher ScientificSWISSMEDICInselspital BernKantonsspital Basel-Land (Bruderholz)Basler KantonalbankLoeb AGSchweizerhof-PassageHotel EulerMotel OneHACO AGWander AGNestlé Suisse SACendres + Métaux SAGysin AGKraftwerk Oberhasli AGKauer trend MöbelmarktMunicipality of PrattelnCivil Registry Office of Basel-StadtSchweizerische MobiliarRaiffeisenbank BernAscaro VorsorgestiftungSygama SABeer Haus Bern

Quality

According to the company, quality is a central commitment; execution is precise and on schedule with annual preventive maintenance and fault management including a 24/365 on-call service.

EvidenceBaselGümligen (municipality of Muri near Bern)
Certifications according to website

History

  1. 1943

    On 1 September, Edi Kalt founds E. Kalt Aktiengesellschaft in Basel as a specialist company for air-conditioning, ventilation and refrigeration systems (offices Schifflände 3, workshop St. Alban-Tal 35).

  2. 1958

    Foundation of the branch office in Gümligen.

  3. 1965

    Foundation of the French subsidiary CCC, Cie. Climatechnique Colmar S.à r.l. (liquidated in 2006).

  4. 1979

    Name changed to E. Kalt AG, Klima- und Energietechnik.

  5. 1993

    Commissioning of the first 3D CAD systems.

  6. 2005

    First management buy-out with Peter E. Kalt secures the continuation as an independent company.

  7. 2011

    Daniel Künzi takes over the management of the Gümligen technical office and becomes a member of the executive management.

  8. 2013

    Markus Schneider takes over the operational management of Service company-wide and becomes a member of the executive management.

  9. 2020

    Handovers in the technical offices Basel (Enver Fejzulahi) and Gümligen (Christian Walther); both become members of the executive management.

  10. 2021

    Beat Leuenberger takes over the operational management of Service company-wide and becomes a member of the executive management.

  11. 2022

    Second management buy-out: succession resolved internally, continuation as an independent company secured.

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account