Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
EBL Energie Rigi – Fertigung

Renewable energy for the Rigi region: CO₂-neutral district heating, electricity from wood and wood pellets.

EBL Energie Rigi Logo

EBL Energie Rigi

Küssnacht am Rigi (Haltikon) · AdligenswilNew on Amplifa

Umbrella brand of EBL (cooperativeLegal form
2025Merger of ECOGEN Rigi / EBL Fernwärme Rigi AG
Haltikon 55, 6403 Küssnacht am RigiHead office

About EBL Energie Rigi

EBL Energie Rigi is an umbrella brand of EBL (Genossenschaft Elektra Baselland) and bundles the expertise of three subsidiaries: EBL Fernwärme Rigi AG, EBL Energiezentrum Rigi AG and EBL Pellets Rigi AG. The company supplies most of the district of Küssnacht am Rigi as well as the Lucerne municipalities of Greppen and Adligenswil with CO₂-neutral district heating based on regional energy sources such as waste and recycled wood as well as residual wood from the neighbouring Schilliger Holz AG. At the Haltikon energy centre in Küssnacht am Rigi, a wood-fired combined heat and power plant generates electricity and heat from residual wood, waste wood and forest wood chips: the resulting steam drives a turbine for electricity generation, and the waste heat is fed into the district heating network. EBL Pellets Rigi AG produces wood pellets from regional residual wood for B2B customers. The district heating network is continuously being expanded; a new main line will connect the Haltikon energy centre with the network in Adligenswil (commissioning expected mid to late 2028). The headquarters is the Haltikon energy centre in Küssnacht am Rigi.

Site
Küssnacht am Rigi
Processes
CO₂-neutral district heating (supply of Küssnacht am Rigi, Greppen, Adligenswil), Electricity generation and heat from regional waste and residual wood (wood-fired combined heat and, Wood pellet production from regional residual wood for B2B, 24-hour fault hotline, Customer service (ownership changes, online forms), Network expansion/connection of the district heating network
Materials
Residual wood, waste wood and forest wood chips, Wood pellets
Industries
Energy supply (district heating, electricity), Households and businesses, B2B (wood pellets), Real estate and properties, B2B (pellets), Real estate/properties
  1. 01

    Mixing and provision of regional waste and residual wood as well as

  2. 02

    Energy conversion in the wood-fired combined heat and power plant (steam

  3. 03

    Feeding of heat into the district heating network

  4. 04

    Distribution and network expansion in Küssnacht am Rigi, Greppen and Adligenswil

  5. 05

    Customer service and 24-hour fault hotline

Energy Sources and Processes

Holz

Residual wood, waste wood and forest wood chips

Regional energy source for the wood-fired combined heat and power plant for combined electricity and heat generation.

Pellets

Wood pellets

Pellets produced from regional residual wood for B2B sales.

Locations

Standort Haltikon Energy Centre

Haltikon Energy Centre

CH

Wood-fired combined heat and power plant (electricity and heat) and head office

Materials
Waste and residual wood, forest wood chips
Standort Adligenswil heating plant

Adligenswil heating plant

CH

Heating plant (end of service life reached, replacement by the Haltikon energy centre planned)

Inside the production

Rigi Energy Centre
Rigi Energy Centre
Expansion of the district heating network in Küssnacht am Rigi, Stadelmatt
Expansion of the district heating network in Küssnacht am Rigi, Stadelmatt
Groundbreaking ceremony EBL Fernwärme Rigi AG, 17.03.2026
Groundbreaking ceremony EBL Fernwärme Rigi AG, 17.03.2026
Pellet combustion
Pellet combustion

Industries

Energy supply (district heating, electricity)Households and businessesB2B (wood pellets)Real estate and propertiesB2B (pellets)Real estate/properties

Additional services

CO₂-neutral district heating (supply of Küssnacht am Rigi, Greppen, Adligenswil)Electricity generation and heat from regional waste and residual wood (wood-fired combined heat andWood pellet production from regional residual wood for B2B24-hour fault hotlineCustomer service (ownership changes, online forms)Network expansion/connection of the district heating network

Reference customers

Schilliger Holz AG (residual wood supplier/partner, not a customer)

History

  1. 2025

    Merger of the ECOGEN Rigi cooperative and EBL Fernwärme Rigi AG; organisation strengthened, number of directly employed staff doubled. Philipp Zgraggen took over the management from Dominique Jermann (ad interim) as of 01.10.2025.

  2. 2026

    Groundbreaking ceremony for the first construction phase of the Haltikon–Adligenswil main line on 17.03.2026; start of pipeline construction was planned for February 2026, commissioning is expected mid to late 2028. Since 03.07.2026, the entire team has been united at the Haltikon energy centre.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo