Electrochaea – Fertigung

Power-to-Gas technology: biomethanation of green hydrogen and CO₂ into grid-quality e-methane

Electrochaea Logo

Electrochaea GmbH

Planegg (82152) · San Diego, CA (USA) · Hvidovre (Denmark)New on Amplifa

2014Founded
1–50 MWe, scalable to 100+ MWePlant sizes
97–99.5%CO₂ conversion efficiency (ECH 0100)
3 locationsGermany, USA, Denmark

About Electrochaea

Electrochaea GmbH, headquartered in Planegg near Munich, is a technology provider in the field of Power-to-Gas (P2G). The patented biomethanation process converts green hydrogen and CO₂ – biogenic, industrial or from raw biogas – into grid-quality renewable e-methane using a proprietary methanogenic archaea strain (biocatalyst ECH 0100). The reaction takes place in stirred bioreactors at approximately 65 °C (plant specification 63 °C, 10 bar) under mild process conditions with a CO₂ conversion efficiency of 97–99.5%. The modular technology is specified in plant sizes of 1, 10 and 50 MWe and is scalable to over 100 MWe (approx. 400 GWh e-methane). The service portfolio includes techno-economic feasibility studies, technology transfer and licensing, provision of the biocatalyst, commissioning, operator training and ongoing technical support. Customers come from the energy sector, gas grid operators, CO₂-emitting industries and biogas upgrading. In addition to its headquarters in Planegg, the company has offices in San Diego (USA) and Hvidovre (Denmark).

Site
Planegg
Processes
Biomethanation (Power-to-Gas / biological methanation of H2 + CO2 to e-methane), Biomethanation in bioreactor (stitched solution, ~65 °C, proprietary methanogenic archaea as, Biomethanation plant 1 MWe (50 Nm³/h CH4, 200 Nm³/h H2, 50 Nm³/h CO2, reactor 63 °C / 10 bar), Biomethanation plant 10 MWe (500 Nm³/h CH4, 2000 Nm³/h H2, 500 Nm³/h CO2), Biomethanation plant 50 MWe (2500 Nm³/h CH4, 10000 Nm³/h H2, 2500 Nm³/h CO2), Techno-economic feasibility studies, licensing/technology transfer, commissioning and, Carbon capture integration (BEDP with Baker Hughes: 3750 Nm³/h CH4 from 3750 Nm³/h CO2 + H2 from 75, Techno-economic feasibility studies and feasibility assessments
Materials
Green hydrogen, Carbon dioxide, e-Methane / synthetic methane, Methanogenic archaea (biocatalyst ECH 0100, Methanothermobacter thermautotrophicus), Platinized titanium cathode material, Graphite (cathode material), Nickel (cathode material), e-Methane
Founded
2014
Industries
Power generators and utilities, Gas grid operators, Industry (CO₂-emitting industries / CCU), Biogas upgrading, Heavy transport / fuels (eLNG)
  1. 01

    Techno-economic feasibility study / feasibility assessment

  2. 02

    Basic Engineering Design Package (BEDP) with engineering partners

  3. 03

    Technology transfer and licensing

  4. 04

    Provision of the ECH 0100 biocatalyst

  5. 05

    Installation by qualified engineering partners

  6. 06

    On-site commissioning and operator training

  7. 07

    Ongoing technical support

Input and Output Materials / Process

H2

Green hydrogen

Input material from electrolysis or pyrolysis, or external supply, for conversion with CO₂.

CO2

Carbon dioxide

Any CO₂ sources (biogenic, industrial, raw biogas) can be used without pretreatment.

CH4

e-Methane

Produced renewable methane in grid-injection quality for feed-in, eLNG or on-site use.

ECH 0100

Methanogenic archaea (biocatalyst)

Selectively developed strain (Methanothermobacter thermautotrophicus) as a self-replicating biocatalyst, licensed under a usage agreement.

Ti

Platinized titanium cathode material

Electrode material for electromethanogenic systems with high volumetric CH₄ production rates.

C

Graphite (cathode material)

Lower-cost electrode alternative with lower performance.

Ni

Nickel (cathode material)

Electrode material with the fastest recovery after operational interruptions.

Locations

Standort Planegg

Planegg

DE

Headquarters (HQ)

Materials
H2, CO2, ECH 0100
  • Biomethanation bioreactor (1 MWe)
  • Biomethanation bioreactor (10 MWe)
  • Biomethanation bioreactor (50 MWe)

San Diego, CA

US

Branch office (Electrochaea Corp.)

Hvidovre

DE

Branch office (Electrochaea.dk ApS, BioCat Site, c/o BIOFOS)

Plants and Systems

BioCat methanation system (BEDP, 3,750 Nm³/h CH₄)
BioCat methanation system (BEDP, 3,750 Nm³/h CH₄)Biomethanation · Energy/CCU
1-MWe biomethanation plant (50 Nm³/h CH₄)
1-MWe biomethanation plant (50 Nm³/h CH₄)Power-to-Gas · Energy generation
50-MWe biomethanation plant (2,500 Nm³/h CH₄)
50-MWe biomethanation plant (2,500 Nm³/h CH₄)Biomethanation · Gas grid operators

Inside the production

Electrochaea and Baker Hughes bring biomethanation technology to market
Electrochaea and Baker Hughes bring biomethanation technology to market
Technology transfer and licensing agreement with Hitachi
Technology transfer and licensing agreement with Hitachi
Electrochaea joins the e-NG Coalition
Electrochaea joins the e-NG Coalition
Product catalog / biomethanation
Product catalog / biomethanation

Industries

Power generators and utilitiesGas grid operatorsIndustry (CO₂-emitting industries / CCU)Biogas upgradingHeavy transport / fuels (eLNG)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Biomethanation (Power-to-Gas / biological methanation of H2 + CO2 to e-methane)Engineering––––green hydrogen, CO2 (biogenic, industrial, raw biogas)
Biomethanation in bioreactor (stitched solution, ~65 °C, proprietary methanogenic archaea asEngineering––––H2, CO2, ECH 0100 archaea biocatalyst
Biomethanation plant 1 MWe (50 Nm³/h CH4, 200 Nm³/h H2, 50 Nm³/h CO2, reactor 63 °C / 10 bar)Engineering––––H2, CO2
Biomethanation plant 10 MWe (500 Nm³/h CH4, 2000 Nm³/h H2, 500 Nm³/h CO2)Engineering––––H2, CO2
Biomethanation plant 50 MWe (2500 Nm³/h CH4, 10000 Nm³/h H2, 2500 Nm³/h CO2)Engineering––––H2, CO2
Techno-economic feasibility studies, licensing/technology transfer, commissioning andEngineering–––––
Carbon capture integration (BEDP with Baker Hughes: 3750 Nm³/h CH4 from 3750 Nm³/h CO2 + H2 from 75Engineering––––CO2, H2

4 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Biomethanation bioreactor (1 MWe P2G plant)Electrochaea–––Planegg (HQ); demo plants in Denmark, Switzerland, USA
Biomethanation bioreactor (10 MWe)Electrochaea––––
Biomethanation bioreactor (50 MWe)Electrochaea––––
Methanation system per BEDP (75 MWe electrolyzer, 3750 Nm³/h CH4)Electrochaea / Baker Hughes BioCat methanation system––2025–

Additional services

Techno-economic feasibility studies and feasibility assessmentsNetwork of qualified engineering partners for plant installationFlexible technology transfer and licensing agreementsOn-site commissioningOperator trainingOngoing technical supportProvision of the ECH 0100 biocatalyst under license

Reference customers

Baker Hughes (strategic investor since 2021, partnership/BEDP)Hitachi (5-year technology transfer and licensing agreement, Japan's first biomethanation plant)BIOFOS (site partner for the BioCat demonstration plant in Denmark)

History

  1. 2014

    Founded on the basis of a methanogenic archaea strain discovered at the University of Chicago (Prof. Laurens Mets); first commercial tests at a US brewery

  2. 2021

    Baker Hughes becomes a strategic investor

  3. 2024

    Demonstration plants and projects in Germany, Switzerland, Denmark and the USA; previously realized the world's first 1-MWe P2G plant

  4. 2024

    Five-year technology transfer and licensing agreement with Hitachi for Japan's first biomethanation plant

  5. 2025

    Completion of the Basic Engineering Design Package (BEDP) with Baker Hughes: 3,750 Nm³/h methane from 3,750 Nm³/h CO₂ and H₂ from a 75-MWe electrolyzer

  6. 2025

    Joined the e-NG Coalition (alliance for Electric Natural Gas)

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo