
Electrotechnical industrial services: switchgear assemblies, industrial electrical work and photovoltaics with switching authorization up to 36 kV

Elektro Drantmann
Mühlenwarf 5, 26434 WangerlandNew on Amplifa
About Elektro Drantmann
Elektro Drantmann is an electrical contracting company based in Wangerland (Lower Saxony) that specializes in electrotechnical industrial services. The sole proprietorship builds switchgear assemblies to customer specifications, performs electrical work in industrial companies, and has been installing photovoltaic systems from the manufacturers Solarwatt and Meyer Burger for around ten years. Thanks to an additional qualification it has acquired, the company holds switching authorization up to 36 kV entitling it to perform switching operations on high- and medium-voltage systems. It also rents out trailer-mounted work platforms (17 m working height) and electric scissor lifts (6 m working height). In addition, the company operates an online shop for thermal imaging and night vision equipment as well as fitter's and holiday apartments. Its customers are industrial and commercial businesses as well as private clients in the region.
- Site
- Wangerland
- Processes
- Custom switchgear assembly manufacturing, Industrial electrical work (electrical work in the industrial sector), Installation of photovoltaic systems (Solarwatt, Meyer Burger), Switching operations on high- and medium-voltage systems (switching authorization up to 36 kV), Rental of trailer-mounted work platform, 17 m working height, Rental of electric scissor lift, 6 m working height, Electrotechnical industrial services, Industrial electrical work / electrical work in the industrial sector
- Materials
- Custom switchgear assembly manufacturing, Photovoltaic systems (Solarwatt, Meyer Burger), Switching operations up to 36 kV
- Certificates
- Switching authorization up to 36 kV
- Industries
- Industrial and commercial companies, Photovoltaics, Work platform rental, Hunting and outdoor
- 01
Consulting and planning
- 02
Switchgear assembly / electrical installation
- 03
On-site installation in industrial operations
- 04
Switching operations up to 36 kV
- 05
Commissioning
Processes and Services
Custom switchgear assembly manufacturing
Individually planned and manufactured switchgear assemblies for industrial and commercial companies.
Photovoltaic systems (Solarwatt, Meyer Burger)
Installation of PV systems for around ten years using components from the manufacturers Solarwatt and Meyer Burger.
Switching operations up to 36 kV
Switching authorization for work on high- and medium-voltage systems.
Location
Wangerland
DEHeadquarters / operating facility
- Trailer-mounted work platform, 17 m working height (with mover)
- Electric scissor lift, 6 m working height
Services


Inside the production


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Custom switchgear assembly manufacturingEngineering | – | – | – | – | – |
| Industrial electrical work (electrical work in the industrial sector)Assembly | – | – | – | – | – |
| Installation of photovoltaic systems (Solarwatt, Meyer Burger)Assembly | – | – | – | – | – |
| Switching operations on high- and medium-voltage systems (switching authorization up to 36 kV)Engineering | – | – | – | – | – |
| Rental of trailer-mounted work platform, 17 m working heightAssembly | – | 17 m working height | – | – | – |
| Rental of electric scissor lift, 6 m working heightAssembly | – | 6 m working height | – | – | – |
2 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Trailer-mounted work platform | – | 1 | 17 m working height, with mover | – | Wangerland |
| Scissor lift (electric) | – | 1 | 6 m working height | – | Wangerland |
Additional services
Qualification
Switching operations on high- and medium-voltage systems require a special additional qualification, which the company possesses. No further certificates are documented.
| Evidence | Wangerland |
|---|---|
| Switching authorization up to 36 kV |
History
- ca. 1990
Start of more than 30 years of activity in the electrical trade (according to the website, no precise founding year given)
- ca. 2013
Installation of photovoltaic systems from the manufacturers Solarwatt and Meyer Burger (according to the website for around 10 years)