Electrical engineering, photovoltaic systems and combined heat and power units from Blaufelden-Gammesfeld
Elektro Glenk GmbH
Blaufelden (Gammesfeld)New on Amplifa
About Elektro Glenk
Elektro Glenk GmbH is an electrical engineering company based in Blaufelden-Gammesfeld, founded in 1987 by Günter Glenk. The company, with around 40 employees, 5 of whom are apprentices, realizes electrical installations for private households, public buildings such as daycare facilities and libraries, and industrial operations. A second pillar is the planning and installation of photovoltaic systems: since 1994, more than 3,000 systems with a total of around 565,000 modules and a total output of 127 MWp have been installed, and since 2010 also ground-mounted systems abroad within the EU. In addition, the company plans, installs, maintains and sells combined heat and power (CHP) units, and since 2015 has been developing a system controller between photovoltaic systems and CHP units together with its sister company ETZ GmbH & Co KG. As a certified E-Check specialist company, the company also carries out inspections of electrical systems and equipment as well as customer service work.
- Site
- Blaufelden
- Processes
- Electrical installation, Photovoltaic system installation, CHP planning, assembly, maintenance, service and sales, E-Check inspection of electrical systems and equipment, Planning and installation of photovoltaic systems, Combined heat and power units (CHP): planning, assembly, maintenance, service, sales, System controller between PV systems and CHP units, E-Check inspections
- Materials
- Electrical installation, Photovoltaic system installation, Combined heat and power units (CHP), E-Check inspection
- Certificates
- E-Check specialist company
- Founded
- 1987
- Employees
- 40
- Industries
- Private households, public buildings, industrial operations, renewable energies, public buildings (daycare facilities, libraries)
- 01
Planning
- 02
Electrical installation
- 03
Photovoltaic system installation
- 04
CHP assembly
- 05
PV/CHP system controller
- 06
E-Check inspection
- 07
Customer service and maintenance
Services and Processes
Electrical installation
Planning, installation and rework of electrical systems for households, public buildings and industry.
Photovoltaic system installation
Roof mounting and ground-mounted systems, installed according to customer requirements and roof situation.
Combined heat and power units (CHP)
Planning, assembly, maintenance, service and sale of CHP units.
E-Check inspection
Inspection of electrical systems and equipment for preventive damage avoidance.
Locations
Blaufelden (Gammesfeld)
DECompany headquarters
- Materials
- Electrical engineering, photovoltaics, CHP
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Electrical installationAssembly | – | – | – | – | – |
| Photovoltaic system installationAssembly | – | – | – | – | – |
| CHP planning, assembly, maintenance, service and salesAssembly | – | – | – | – | – |
| E-Check inspection of electrical systems and equipmentTesting | – | – | – | – | – |
Additional services
Quality
The company has been an E-Check specialist company for over 30 years; the E-Check documents the proper condition of electrical systems and equipment and detects hazards before damage occurs.
| Evidence | Blaufelden (Gammesfeld) |
|---|---|
| E-Check specialist company |
History
- 1987
Günter Glenk founded Elektro Glenk in Gammesfeld together with his wife, initially carrying out electrical installations with three additional employees.
- 1992
Establishment as the leading electrical company for private households and public buildings in the region.
- 1994
Establishment of photovoltaic system sales; the company grows to over 70 employees.
- 2003
Further growth of the electrical installation and photovoltaics division; the old company premises are no longer sufficient for module storage.
- 2007
Founding of the sister company ETZ GmbH & Co KG for renewable energies and energy optimization.
- 2009
Relocation to the entrance of Gammesfeld; purchase of a former farm building (today's company headquarters) and construction of two halls.
- 2010
First work abroad in the EU; first installation of ground-mounted systems; 19.5 MW of PV capacity installed that year.
- 2015
Development of a system controller between photovoltaic systems and CHP units with ETZ GmbH & Co KG.
- 2019
Over 3,000 photovoltaic systems built; the management is taken over by Anita Glenk, Daniel Glenk and Thorsten Kaufmann.