
Energy technology and civil engineering: trenchless horizontal drilling technology, cable and pipeline construction as well as electrical installation from Sohland/Spree.

Elektroanlagenbau Paul
Sohland / SpreeNew on Amplifa
About Elektroanlagenbau Paul
Elektroanlagenbau Paul is a specialist company from Sohland/Spree in Saxony that has been offering solutions in the fields of energy technology and civil engineering for almost 15 years. Its team of engineers, electrically skilled workers and qualified civil engineers works for private and public customers as well as for utility companies in the electricity, gas, water and renewable energies sectors. Core services include trenchless horizontal drilling technology with two drilling rigs (15 t and 4 t pull and thrust force), with which pipes made of plastic, cast iron or steel can be laid on drill paths up to 200 metres long. Further business areas are cable and pipeline construction including fibre optic networks, electrical installation at low and medium voltage level with overhead line construction up to 30 kV, as well as power plant construction with planning, cabling and grid connection of solar and wind farms. The range is complemented by civil engineering, planning services as well as maintenance and servicing of industrial plants.
- Site
- Sohland / Spree
- Processes
- Horizontal drilling technology (trenchless laying of pipes and cables, pilot bore with, Ground injection for stabilising cavities in the soil, Pipeline trenches for gas, electricity and water, Laying of power and telecom cables, Duct routes and shaft systems, Construction of modern fibre optic networks, Surfacing and design of surfaces and driveways; individual civil engineering in the private and, Work at low and medium voltage level; overhead line construction up to 30 kV including new
- Materials
- Plastic (pipelines), Cast iron (pipelines), Steel (pipelines)
- Industries
- Energy technology, Civil engineering, Utility companies, Renewable energies (solar and wind farms), Telecommunications/fibre optic networks
- 01
Planning (design, permitting and execution planning)
- 02
Horizontal drilling technology or pipeline trench
- 03
Laying of pipes and cables
- 04
Electrical installation and grid connection
- 05
Maintenance and servicing
Materials and processes
Plastic (pipelines)
Used in trenchless horizontal drilling as a pipe to be pulled in.
Cast iron (pipelines)
Pipe to be pulled in for trenchless laying in all soil classes.
Steel (pipelines)
Pipe to be pulled in for highly stressed route alignments in horizontal drilling.
Locations

Sohland / Spree
DEHeadquarters
- Materials
- Plastic, cast iron, steel (pipelines)
- Horizontal drilling rig 15 t pull/thrust force
- Horizontal drilling rig 4 t pull/thrust force
Services and components




Inside the production






Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Horizontal drilling technology (trenchless laying of pipes and cables, pilot bore withCivil engineering | – | Drill path up to 200 m | – | – | Plastic, Cast iron, Steel |
| Ground injection for stabilising cavities in the soilCivil engineering | – | – | – | – | – |
| Pipeline trenches for gas, electricity and waterCivil engineering | – | – | – | – | – |
| Laying of power and telecom cablesAssembly | – | – | – | – | – |
| Duct routes and shaft systemsCivil engineering | – | – | – | – | – |
| Construction of modern fibre optic networksAssembly | – | – | – | – | – |
| Surfacing and design of surfaces and driveways; individual civil engineering in the private andCivil engineering | – | – | – | – | – |
| Work at low and medium voltage level; overhead line construction up to 30 kV including newAssembly | – | – | – | – | – |
| Mast and luminaire assemblyAssembly | – | – | – | – | – |
| House connections in the private and commercial sectorAssembly | – | – | – | – | – |
| Planning services (design, permitting and execution planning)Engineering | – | – | – | – | – |
| Connection, maintenance and servicing of industrial plantsAssembly | – | – | – | – | – |
| Planning, cabling and grid connection of solar and wind farmsAssembly | – | – | – | – | – |
2 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Horizontal drilling rig | – | 1 | Pull and thrust force 15 t | – | Sohland/Spree |
| Horizontal drilling rig | – | 1 | Pull and thrust force 4 t | – | Sohland/Spree |
Additional services