
Automation and electrical engineering solutions from planning through control cabinet construction and PLC programming to commissioning
ELTRO Solutions GmbH & Co. KG
Brandenburg an der HavelNew on Amplifa
About ELTRO Solutions
ELTRO Solutions GmbH & Co. KG, based in Brandenburg an der Havel, offers engineering and turnkey solutions in the fields of electrical, automation, IT, video and audio technology. The team of engineers, technicians and fitters covers the complete plant life cycle – from consulting, planning and concept development through electrical installation and control cabinet manufacturing to PLC programming, visualization with HMI/SCADA, assembly, commissioning, training, documentation and maintenance. As a Solution Partner of Siemens AG, the company implements automation projects for infrastructure, lock and waterway engineering, mechanical engineering, testing machines as well as transport and logistics. In-house products such as the dip coater DC 2a made from aluminum profiles are manufactured for chemical and biology laboratories. Reference projects include the Scharnebeck boat lift, the Peene Bridge in Wolgast, a ferry terminal in Rostock and a gearbox test rig for wind turbines up to 8 MW in India. In 2025, the measurement and control (MSR) technology business unit for ventilation, heating and air conditioning systems was added.
- Site
- Brandenburg an der Havel
- Processes
- Assembly and commissioning of plants, Automation / end-to-end automation in plant engineering, Electrical engineering planning, Control cabinet design incl. manufacturing / control cabinet construction, Electrical installation, PLC programming, Visualization with HMI/SCADA, Drive solutions e.g. inverter gearbox test rig
- Materials
- Aluminum profiles, PLC programming (Siemens S7), Visualization with HMI/SCADA, IT virtualization
- Founded
- 1993
- Industries
- Infrastructure, Lock automation / waterways, Mechanical engineering, Mechanical testing machines, Machines for the electrical industry, Transport and logistics
- 01
Consulting and analysis
- 02
Planning and concept development
- 03
Electrical engineering planning
- 04
Control cabinet design and manufacturing
- 05
Electrical installation
- 06
PLC programming and visualization
- 07
Assembly and commissioning
- 08
Training, documentation, maintenance and service
Materials and Products
PLC programming (Siemens S7)
Control software with STEP7/TIA and visualization via WinCC for systems such as the boat lift and ferry terminal.
Visualization with HMI/SCADA
Operator and monitoring systems for plant control and fault data acquisition.
IT virtualization
Planning and administration of virtual infrastructures, networks, storage and backup solutions.
Aluminum profiles
Construction material of the in-house developed dip coater DC 2a for low equipment weight.
Locations
Brandenburg an der Havel
DEHeadquarters, engineering and control cabinet manufacturing
- Materials
- Aluminum profiles
- Control cabinet manufacturing
- Dip coater DC 2a (in-house development)
- PLC programming Siemens S7/TIA
- WinCC visualization
Components and Systems



Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Assembly and commissioning of plantsAssembly | – | – | – | – | – |
| Automation / end-to-end automation in plant engineeringEngineering | – | – | – | – | – |
| Electrical engineering planningEngineering | – | – | – | – | – |
| Control cabinet design incl. manufacturing / control cabinet constructionJoining | – | – | – | – | – |
| Electrical installationAssembly | – | – | – | – | – |
| PLC programmingEngineering | – | – | – | – | – |
| Visualization with HMI/SCADAEngineering | – | – | – | – | – |
| Drive solutions e.g. inverter gearbox test rigEngineering | – | – | – | – | – |
| Video technology: planning and commissioning of video and surveillance systems incl. manufacturingEngineering | – | – | – | – | – |
| Audio technology: intercom systems, intercom, emergency call, evacuation, monitoring andEngineering | – | – | – | – | – |
| IT/virtualization: planning and conception of IT systems, networks, virtual infrastructure,Engineering | – | – | – | – | – |
| Software solutions: custom software development (design, programming, testing, maintenance)Engineering | – | – | – | – | – |
| Maintenance and service for plants and systemsAssembly | – | – | – | – | – |
| Measurement and control (MSR) technology: ventilation, heating and air conditioning systemsAssembly | – | – | – | – | – |
| Manufacture of gearbox test rig for wind turbines (up to 8 MW) incl. assembly and commissioningEngineering | – | – | – | – | – |
| Renewal/modernization of electrical and control systems (e.g. boat lift, bridges,Engineering | – | – | – | – | – |
| Manufacture of dip coater DC 2a (in-house development)Engineering | – | – | – | – | Aluminum |
10 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Dip coater DC 2a (in-house development, 3-axis control) | ELTRO Solutions DC 2a | 1 | Travel distance 570×360 mm; dimensions 1110x480x690 mm; travel speed 0 to 30 mm/s | – | Brandenburg |
| Inverter gearbox test rig for wind turbines | Siemens (system supplier) | 1 | designed for wind turbines up to 8 MW | – | India (at customer site) |
| PLC Siemens S7 300, CPU315-2DP | Siemens CPU315-2DP | – | – | – | – |
| PLC Siemens CPU 315-2 PN/DP with ET200s modules | Siemens CPU 315-2 PN/DP | – | – | – | – |
| PILZ controls | PILZ | 3 | – | – | – |
| Network switch HP 2910-24G-PoE+ | HP 2910-24G-PoE+ | – | – | – | Ferry terminal Rostock LP54 |
| Workstation Dell Precision T1600 | Dell Precision T1600 | – | – | – | Ferry terminal Rostock LP54 |
| Camera AXIS P1344-E | AXIS P1344-E | – | – | – | Ferry terminal Rostock LP54 |
| PTZ dome camera AXIS P5534-E | AXIS PTZ-Dome P5534-E | – | – | – | Ferry terminal Rostock LP54 |
| Device server Barix Barionet 100 | Barix Barionet 100 | – | – | – | Ferry terminal Rostock LP54 |
Additional services
Reference customers
History
- 1993
Company founded
- 2011
Conversion of the operation of the Scharnebeck boat lift (east trough) to the WinCC visualization system
- 2016
Development of the dip coater (originally as a 3-axis control, later DC 1a and DC 2a)
- 2021
Order for a gearbox test rig for wind turbines up to 8 MW with Siemens as system supplier, installation in India
- 2022
First delivery abroad to India; assembly and commissioning of the gearbox test rig completed
- 2023
30th company anniversary on 25.09.2023
- 2025
Addition of the measurement and control (MSR) technology business unit (ventilation, heating and air conditioning systems); three business units