
Planning, construction and operation of building automation, heating, refrigeration and ventilation air-conditioning technology, including in-house control cabinet manufacturing.

Energietechnik Holl GmbH
Ediger-Eller (Raiffeisenstr. 5) · Cochem-BrauheckNew on Amplifa
About Energietechnik Holl
Energietechnik Holl GmbH is a family-run company now in its fifth generation, founded in 1908 and headquartered in Ediger-Eller on the Moselle. With a workforce of around ten employees, the company plans, builds and operates technical building systems: building automation (BMS/DRS), heating technology, refrigeration and air-conditioning technology, as well as ventilation technology for partial to full climate control. Control cabinet systems are manufactured in-house with standards-compliant documentation; the company also manufactures air-handling components itself. Its range of services extends from consulting, planning and design through manufacturing, installation and commissioning to maintenance, fault clearance service, monitoring and operational optimisation – in new construction as well as existing buildings. Its customers include in particular public buildings and critical infrastructure (KRITIS) facilities such as hospitals, administrative centres, schools and waterworks. According to Creditreform, the company has two locations.
- Site
- Ediger-Eller
- Processes
- Building automation (DRS/BMS), Heating technology (heating system construction), Refrigeration & air-conditioning technology, In-house manufacturing of air-handling components, Ventilation technology (partial to full climate control), Control cabinet manufacturing (in-house, standards-compliant documentation), Planning and design (schematics, GA functions, documentation), Installation & commissioning (on-site installation, functional testing)
- Materials
- Sheet metal processing
- Certificates
- Standards-compliant documentation for control cabinet manufacturing
- Founded
- 1908
- Employees
- 10
- Industries
- Public buildings, KRITIS (hospitals, administrative centres, schools, waterworks), New construction, Existing buildings/renovation
- 01
Consulting
- 02
Planning and design
- 03
Control cabinet manufacturing (production, testing, standards labelling)
- 04
Installation and commissioning
- 05
Operation, monitoring and maintenance
Materials & Processes
Sheet metal processing
Sheet metal is processed in the in-house production of air-handling components and in control cabinet manufacturing.
Locations
Ediger-Eller
DEHead office
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Building automation (DRS/BMS)Engineering | – | – | – | – | – |
| Heating technology (heating system construction)Installation | – | – | – | – | – |
| Refrigeration & air-conditioning technologyInstallation | – | – | – | – | – |
| In-house manufacturing of air-handling componentsJoining | – | – | – | – | Sheet metal (derivable) |
| Ventilation technology (partial to full climate control)Installation | – | – | – | – | – |
| Control cabinet manufacturing (in-house, standards-compliant documentation)Installation | – | – | – | – | – |
| Planning and design (schematics, GA functions, documentation)Engineering | – | – | – | – | – |
| Installation & commissioning (on-site installation, functional testing)Installation | – | – | – | – | – |
| Operation & maintenance (monitoring, optimisation, fault clearance service)Installation | – | – | – | – | – |
| Gas, water, heating as well as ventilation and air-conditioning installationInstallation | – | – | – | – | – |
Additional services
Quality & Standards Compliance
Control cabinets are manufactured in-house, tested and documented in compliance with standards. On-site commissioning includes functional testing and handover.
| Evidence | Ediger-Eller |
|---|---|
| Standards-compliant documentation for control cabinet manufacturing |
History
- 1908
Founded; family-run company, today in its fifth generation
- 2021
Last change in the commercial register on 08.04.2021