Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
ENERTRAG – Fertigung

Development, construction, operation and service of wind, solar and hybrid power plants including green hydrogen

ENERTRAG Logo

ENERTRAG SE

Dauerthal · Berlin · Rostock · Dortmund · Lübeck · Edemissen · Hamburg · Prenzlau · Cottbus · Kiel · Potsdam · Leipzig · Neuville-sur-Oise · Dijon · Glisy · Lyon · St Quentin · Szczecin · Katowice ·New on Amplifa

1998Founded
1,200+Employees
Locations in approx. 10 countriesGermany, France, Poland, Spain, Namibia, Ghana
1,800+ MWInstalled capacity
2.6 GWMonitored capacity in the Dauerthal control center

About ENERTRAG

ENERTRAG SE is an independent energy company headquartered in Dauerthal (Uckermark) that generates electricity and heat exclusively from renewable sources. The company develops, builds and operates wind power and photovoltaic installations as well as hybrid power plants that combine wind and solar energy with battery storage, wind-to-heat storage and electrolysers for the production of green hydrogen. Since 2011, ENERTRAG has been operating the world's first hybrid power plant of this kind in Prenzlau. The portfolio is complemented by manufacturer-independent service, maintenance and repair of wind turbines at 16 service locations in Germany as well as sites in Poland and South Africa, including major component replacement, non-destructive material testing and welding repairs on steel components. Technical and commercial operations management as well as the proprietary Powersystem software for monitoring more than 1,100 installations with 2.6 GW of capacity round out the service offering. With more than 1,800 MW of installed capacity, around 945 MW of wind in its own portfolio and more than 1,200 employees in around ten countries, ENERTRAG is active along the entire value chain of the energy transition, including major projects in Poland, France, Namibia and Vietnam.

Site
Dauerthal
Processes
Service, maintenance and repair of wind turbines (maintenance, upkeep, fault clearance), Major component replacement (main and yaw gearboxes, rotor bearings, generators), Non-destructive material testing (magnetic particle testing, ultrasonic testing), Welding repairs (certified according to DIN EN ISO 3834-2), New construction of steel structures (certified according to DIN EN ISO 1090-1), Overhaul of DeWind hydraulic pitch hubs, Decommissioning and environmentally sound recycling of old installations (wind turbines), Installation of wind turbines and photovoltaic installations
Materials
Steel, Cast, Plastic
Certificates
ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, DIN EN ISO 3834-2 (welding repairs), DIN EN ISO 1090-1 (new construction of steel structures), ISO 9001, ISO 14001, ISO 45001, EN 1090, Other (DIN EN ISO 3834-2, GWO)
Founded
1998
Employees
1200+
Industries
Renewable energy / wind power, Photovoltaics, Hydrogen / power-to-gas, Energy storage, Heavy industry (green hydrogen, steel), Aviation (eSAF)
  1. 01

    Wind and PV project development

  2. 02

    Planning and permitting

  3. 03

    Installation of the plants

  4. 04

    Grid connection / substation

  5. 05

    Technical and commercial operations management

  6. 06

    Service, maintenance and repair

  7. 07

    Decommissioning and recycling

Materials and Processes

Stahl

Steel

Material for welding repairs according to DIN EN ISO 3834-2, new construction of steel structures according to DIN EN ISO 1090-1, as well as major components such as gearboxes, rotor bearings and generators.

Guss

Cast

Component material in the context of decommissioning and recycling of old wind turbines.

Kunststoff

Plastic

Material components in the spare parts sector, including in hydraulics and control technology.

Locations

Standort Dauerthal

Dauerthal

DE

Headquarters, control center and energy campus

Materials
Steel
  • Dauerthal control center (1,100 installations, 2.6 GW, since 1999)
  • Powersystem software
  • Welding-certified workshop (DIN EN ISO 3834-2)
  • Training and qualification center
  • Spare parts warehouse with over 5,000 items

Prenzlau

DE

Hybrid power plant, systems engineering and Dark Sky

Materials
Steel
  • Prenzlau hybrid power plant (since 2011)
  • 500-kW electrolyser
  • Planned 130-MW electrolysis plant Prenzlau North (2029)
Standort Uckermark (hybrid power plant)

Uckermark (hybrid power plant)

DE

Wind field, storage and grid infrastructure

Materials
Steel
  • GE 5.5/158/5500 wind turbine Falkenwalde (5.5 MW, 2021)
  • Battery storage Cremzow (22 MW / 34.8 MWh, 2019)
  • Wind-to-heat storage Nechlin
  • Bertikow substation (605 MW, 2003)
  • PV field Kreuz Uckermark (20 MW, 2023)

Lübeck

DE

ENERTRAG Service

Materials
Steel
  • Service site for wind turbines

Edemissen

DE

ENERTRAG Betrieb GmbH, inspections including drone inspections

  • Drone inspection of wind turbines

Szczecin

PL

ENERTRAG Polska Energia Sp. z o.o.

Neuville-sur-Oise

FR

France branch (120 employees, 537 MW in 44 wind farms)

St Quentin

FR

ENERTRAG Service France (since 2018)

Materials
Steel
  • Service and maintenance of wind farms and PV installations
  • Monitoring of main bearings and rotor blades

Cape Town

ZA

Branch and service location

Windhoek

NA

ENERTRAG Namibia (Hyphen project, 3.5 GW green hydrogen)

Service Spectrum

Wind turbines in the Uckermark hybrid power plant
Wind turbines in the Uckermark hybrid power plantProject development, construction and operation · Wind energy
Service and maintenance of wind turbines
Service and maintenance of wind turbinesService, maintenance, repair · Wind energy
Dauerthal control center
Dauerthal control centerTechnical operations management and remote monitoring · Renewable energy
PV field Kreuz Uckermark
PV field Kreuz UckermarkPhotovoltaics · Renewable energy
PEM electrolyser Osterweddingen
PEM electrolyser OsterweddingenGreen hydrogen / power-to-gas · Industry

Inside the production

ENERTRAG wind farm
ENERTRAG wind farm
Wind power in the Uckermark
Wind power in the Uckermark
Drone shot of a wind turbine
Drone shot of a wind turbine
Aerial view of a wind farm
Aerial view of a wind farm
Visualization of the Pasewalk hybrid power plant
Visualization of the Pasewalk hybrid power plant
3D visualization of the Bertikow substation
3D visualization of the Bertikow substation

Industries

Renewable energy / wind powerPhotovoltaicsHydrogen / power-to-gasEnergy storageHeavy industry (green hydrogen, steel)Aviation (eSAF)Shipping (e-methanol)Rail transport (CO₂-free mobility)Municipalities / public sector

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Service, maintenance and repair of wind turbines (maintenance, upkeep, fault clearance)Assembly–––––
Major component replacement (main and yaw gearboxes, rotor bearings, generators)Assembly––––Stahl
Non-destructive material testing (magnetic particle testing, ultrasonic testing)Testing––––Stahl
Welding repairs (certified according to DIN EN ISO 3834-2)Joining––––Stahl
New construction of steel structures (certified according to DIN EN ISO 1090-1)Joining––––Stahl
Overhaul of DeWind hydraulic pitch hubsAssembly–––––
Decommissioning and environmentally sound recycling of old installations (wind turbines)Assembly––––Stahl, Guss
Installation of wind turbines and photovoltaic installationsAssembly–––––
Spare parts distribution (gearboxes, yaw drives, hydraulic stations, pitch systems)Assembly––––Stahl, Kunststoff
Hydrogen production via electrolysis (PEM electrolyser, 10–130 MW, Prenzlau hybrid power plant)Engineering–––––
Wind farm project development and repoweringEngineering–––––
Technical operations management and inspection of energy installations (including drone inspection)Testing–––––
Commercial operations management of energy installationsEngineering–––––
Independent service and maintenance for wind farms and photovoltaic installations in FranceAssembly–––––

12 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Wind turbineGeneral Electric GE 5.5/158/5500––2021Falkenwalde wind field, Uckermark
Battery storage––22 MW / 34.8 MWh2019Cremzow
Wind-to-heat storage––––Nechlin
Substation––20–30 kV / 110–380 kV, 605 MW2003Bertikow
Control center / Control Center––1,100 installations, 2.6 GW1999Dauerthal
PEM electrolyser––10 MW2026Osterweddingen
Electrolysis plant––130 MW2029Prenzlau North
Electrolysis plant––60 MW (stage 1), 180 MW (stage 2)2029Pasewalk
Battery storage––200 MW2027Bertikow
Electrolyser (hybrid power plant)––500 kW2011Prenzlau
Wind farm––186 MW2022Dunowo, Poland
Wind farm––197.2 MW2029Oschersleben

Additional services

Wind & PV project developmentRepoweringDecommissioning and recycling of old installationsTechnical operations management / inspection (ENERTRAG Betrieb)Commercial operations managementService, maintenance, repair of wind turbines (manufacturer-independent)Major component replacement worldwideNon-destructive material testingWelding repairsSpare parts and major component warehouseOperations management software (Powersystem)Operation of hybrid power plants (wind/solar/storage/hydrogen)Green hydrogen production (power-to-gas)Electrolysis and eSAF/e-methanol projectsGrid stability services / battery storageDemand-controlled night-time marking (Dark Sky)

Reference customers

GazelEnergieEnlightAllianz Insurance (financing of Koszalin wind farm)Greenpeace Energy (marketing of renewable gas)Stadtwerke TorgelowRieger (Green Fuels Lausitz)Encavis (buyer of Vallée de Joie wind farm)Quadoro / EB-SIM (Iserlohn wind farm)AlpiqHyphen (Namibia project)

Quality and Certification

ENERTRAG Service is certified according to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018. Welding repairs are certified according to DIN EN ISO 3834-2 and the new construction of steel structures according to DIN EN ISO 1090-1; regularly conducted safety training follows the GWO standard.

EvidenceDauerthal
ISO 9001
ISO 14001
ISO 45001
EN 1090
Other (DIN EN ISO 3834-2, GWO)

Company History

  1. 1992

    Company founder Jörg Müller erects the first wind turbine

  2. 1997

    Founding of Uckerwerk Energietechnik GmbH by Jörg Müller and Tilo Troike

  3. 1998

    Founding of Enertrag AG; first wind farms commissioned

  4. 1999

    Commissioning of the control center in Dauerthal

  5. 2002

    First international expansion with a wind farm in France

  6. 2003

    Relocation of headquarters to Dauerthal (Schenkenberg)

  7. 2009

    Groundbreaking ceremony for the world's first industrial hybrid power plant by Chancellor Merkel

  8. 2011

    Commissioning of the Prenzlau hybrid power plant (world's first hybrid power plant)

  9. 2013

    520 wind turbines domestically and abroad

  10. 2018

    Establishment of ENERTRAG Service France in St Quentin

  11. 2019

    Award of two wind projects near Koszalin (Poland) with 186 MW; commissioning of the Cremzow battery storage

  12. 2022

    Conversion of Enertrag AG into ENERTRAG SE; Jörg Müller moves to the supervisory board, Gunar Hering becomes CEO; completion of the Dunowo wind farm (Poland, 186 MW)

  13. 2026

    EU France handover program: €1.1 billion investment program until 2030; €350 million funding commitment for Brandenburg eSAF in Schwedt

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo