Hydropower plant operator in the Lower Engadin with 424 MW of installed capacity and its own workshop for plant operation and maintenance.

EKW Logo

Engadiner Kraftwerke AG / Ouvras Electricas d'Engiadina SA

Zernez (headquarters, administration, workshop) · Pradella (power station 288 MW) · Martina (power station 70 MW) · Ova Spin (power station 50 MW)New on Amplifa

1966Via da S-charl pressure tunnel under construction
57 employees(50 full-time equivalents)
424 MWInstalled capacity, 13 machine groups
1'382 GWhNet energy production 2024/25
approx. CHF 98 millionRevenue financial year 2024/25

About Engadiner Kraftwerke AG

Engadiner Kraftwerke AG (EKW), headquartered in Zernez, operates hydropower plants in the Lower Engadin in Graubünden. The installed capacity is 424 MW, distributed across 13 machine groups, two of which are pump turbines: the Pradella power station (288 MW), Martina (70 MW), Ova Spin (50 MW) as well as feed-in stations with 4 MW; additionally, there is a 12 MW stake in the GKI. Net energy production in the 2024/25 financial year was 1'382 GWh (10-year average 1'312 GWh), at production costs of 4.87 Rp./kWh. In addition to operating and maintaining its plants, EKW carries out project management for refurbishments such as the ROKS retrofit of the upper power station stage, and maintains its own workshop in Zernez, where polymechanics are also trained. On the workshop roof, the company operates a winter photovoltaic system with 28.4 kW of capacity. The company employs 57 staff (50 full-time equivalents) and generated revenue of around CHF 98 million in the 2024/25 financial year.

Site
CH-7530 Zernez
Processes
Electricity generation (hydropower), Plant operation and maintenance, Project management/refurbishments (e.g. ROKS retrofit of the upper power station stage), Training (polymechanics apprentices), Stake in GKI (12 MW)
Materials
Hydropower (storage and pumped-storage operation), Winter photovoltaic system (vertically mounted bifacial modules)
Certificates
Operation and maintenance according to in-house plant standards
Employees
57
Industries
Energy supply / Hydropower
  1. 01

    Water intake and feed-in

  2. 02

    Tunnel and pressure water conduits

  3. 03

    Power plant operation (turbine/generator)

  4. 04

    Pradella substation with 380/110 kV grid coupling transformers

  5. 05

    Power supply

  6. 06

    Maintenance and refurbishment in the company's own workshop

Operation, Maintenance and Projects

Wasserkraft

Hydropower (storage and pumped-storage operation)

Energy source with 424 MW installed capacity and 1'382 GWh net production in the 2024/25 financial year.

PV

Winter photovoltaic system (vertically mounted bifacial modules)

28.4 kW on the workshop roof in Zernez, producing around 32'000 kWh per year, more than half of which in the winter half-year.

Plants and Sites

Zernez

CH

Headquarters, administration and workshop

  • Workshop (polymechanics training)
  • Winter photovoltaic system 28.4 kW (approx. 32'000 kWh/year)
Standort Pradella

Pradella

CH

Power station site with substation

  • 288 MW, incl. 2 pump turbines
  • Substation with 380/110 kV grid coupling transformers

Martina

CH

Power station site

  • 70 MW

Ova Spin

CH

Power station site

  • 50 MW

Plants and Structures

Sasstaglià service bridge (access to the Val S-charl access tunnel)
Sasstaglià service bridge (access to the Val S-charl access tunnel)Restoration · Infrastructure
380/110 kV grid coupling transformer at the Pradella substation
380/110 kV grid coupling transformer at the Pradella substationGrid connection · Energy supply

Inside the production

Fault on the grid coupling transformer at the Pradella substation
Fault on the grid coupling transformer at the Pradella substation
Sasstaglià service bridge, Val S-charl
Sasstaglià service bridge, Val S-charl
National Park open-air cinema in the castle courtyard of Planta-Wildenberg,
National Park open-air cinema in the castle courtyard of Planta-Wildenberg,

Industries

Energy supply / Hydropower

Additional services

Electricity generation (hydropower)Plant operation and maintenanceProject management/refurbishments (e.g. ROKS retrofit of the upper power station stage)Training (polymechanics apprentices)Stake in GKI (12 MW)

Operational Availability

EKW ensures high availability of its production facilities through continuous inspections, condition assessments of machines, overhauls (e.g. replacement of spherical valve seals, tunnel inspections) as well as the step-by-step retrofit and renewal of power plant components.

EvidenceZernez
Operation and maintenance according to in-house plant standards

History

  1. 1966

    Construction of the Via da S-charl pressure tunnel (historical image: miners, rails, concrete, steel scaffolding)

  2. 2024/25

    71st annual report: production 5.38% above the long-term average, completion of the partner plant tax settlement 2010–2023, start of construction of the PCB remediation in the upper Spöl

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo