Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
ENSY – Fertigung

ENSY AG manufactures turnkey, SVGW-certified drinking water power plants for Swiss municipalities and water supply utilities.

ENSY Logo

ENSY AG

Oberdorfstrasse 4, 7434 Sufers (CH)New on Amplifa

25+Plants in operation
6.7+ Mio. kWhElectricity already fed into the grid
250+ kWTotal installed capacity
AGLegal form

About ENSY AG

ENSY AG, based in Sufers in the canton of Graubünden, is a Swiss specialist in drinking water power plants and decentralised energy systems. The company plans and implements turnkey small hydropower plants that use the existing drinking water network for power generation, keeping construction effort low through the use of standard components and Pelton turbines. The plants are offered at a fixed price and are SVGW-certified; all operating data is monitored in real time via an online portal. More than 25 plants have been feeding energy into the power grid around the clock for over ten years, with a total installed capacity of over 250 kW and more than 6.7 million kWh of electricity generated. Customers are primarily municipalities and water supply utilities, including Rhäzüns, Landarenca and Grüsch. In addition to the potential analysis with an online calculator, ENSY AG offers municipalities a guide to project implementation as well as support in applying for federal investment contributions.

Site
Sufers, GR
Processes
Turnkey drinking water power plants at a fixed price, Online monitoring / real-time data portal, Potential analysis / potential calculator, Guide for municipalities
Certificates
SVGW certification (product/plant), SVGW certification
Industries
Municipalities, Water supply utilities, Renewable energy / small hydropower
  1. 01

    Potential analysis / potential calculator

  2. 02

    Planning and fixed-price quotation

  3. 03

    Delivery and turnkey installation of the plant

  4. 04

    Commissioning (SVGW-certified)

  5. 05

    Online monitoring and real-time data portal

Locations

Sufers

CH

Headquarters

Products & Plants

Drinking water power plant
Drinking water power plantPelton turbine · Drinking water network

Industries

MunicipalitiesWater supply utilitiesRenewable energy / small hydropower

Additional services

Turnkey drinking water power plants at a fixed priceOnline monitoring / real-time data portalPotential analysis / potential calculatorGuide for municipalities

Reference customers

Municipality of RhäzünsMunicipality of LandarencaMunicipality of Grüsch

Quality

ENSY AG's drinking water power plants are SVGW-certified. The plants use standard components and are monitored in real time via an online portal.

EvidenceSufers
SVGW certification

History

  1. For over ten years, the drinking water power plants have been feeding energy into the power grid around the clock (as of approx. 2024)

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo