
Engineering services for planning, project management and construction supervision of subsea and land cable installations
eos projekt GmbH
Norden (Headquarters) · Hannover (Project Office) · Lubmin (Project Office)New on Amplifa
About us
eos projekt GmbH is an independent, internationally active engineering company with around 30 experts for complex subsea and land cable projects. Founded in 2008 in Hannover and headquartered in Norden (North Sea), the company supports national and global energy companies as well as transmission system operators in all project phases: from technical planning and permitting planning through project management and technical construction supervision to consulting during the operational phase. The service portfolio includes geotechnical and seabed investigations (MAG/p-UXO, MBES, SSS, VibroCore, CPT), route preparation, cable manufacturing supervision and FAT, cable installation in shallow water, the Wadden Sea and deep water, electrical work such as jointing and termination installation, commissioning measurements as well as as-built documentation. The company has been active for many years in the Baltic and North Sea, on the East Coast of America and in Taiwan.
- Site
- Norden
- Processes
- Technical planning, Project management, Technical construction supervision of subsea and land cable installation, Consulting during the operational phase of subsea and land cable installations, Technical consulting and supervision of cable manufacturing (cable design), FAT, Geophysical, geological, geotechnical and ecological seabed investigations (MAG (p-UXO),, Route preparation: route clearance, boulder clearance, prelay grapnel run (PLGR), mattressing,, Quality control, analysis and evaluation of survey data
- Certificates
- DIN EN ISO 9001:2015, DIN EN ISO 14001:2015, DIN EN ISO 45001:2018, Safety Culture Ladder (SCL) Level 3, ISO 9001, ISO 14001, ISO 45001, Safety Culture Ladder Level 3
- Founded
- 2008
- Employees
- approx. 30
- Industries
- Renewable Energies, Wind Energy (Off- and Onshore), Subsea and Land Cable Installation, Energy Supply, Transmission System Operators
- 01
Technical planning and permitting planning
- 02
Project management
- 03
Geotechnical and seabed investigations
- 04
Route preparation
- 05
Cable manufacturing supervision and FAT
- 06
Cable installation (shallow water, Wadden Sea, deep water)
- 07
Cable pull-in and cable landfall
- 08
Electrical work (joints, terminations)
- 09
Commissioning and measurements
- 10
Quality control and as-built documentation
Locations

Norden
DEHeadquarters
Hannover
DEProject Office
Lubmin
DEProject Office
Inside the production








Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Technical planningEngineering | – | – | – | – | – |
| Project managementEngineering | – | – | – | – | – |
| Technical construction supervision of subsea and land cable installationEngineering | – | – | – | – | – |
| Consulting during the operational phase of subsea and land cable installationsEngineering | – | – | – | – | – |
| Technical consulting and supervision of cable manufacturing (cable design), FATEngineering | – | – | – | – | – |
| Geophysical, geological, geotechnical and ecological seabed investigations (MAG (p-UXO),Testing | – | – | – | – | – |
| Route preparation: route clearance, boulder clearance, prelay grapnel run (PLGR), mattressing,Engineering | – | – | – | – | – |
| Quality control, analysis and evaluation of survey dataTesting | – | – | – | – | – |
| Cable installation in shallow water and Wadden Sea (vertical injector,Assembly | – | – | – | – | – |
| Deep-water cable installation (cable ploughs HD 3 Plough, trencher, TROVs)Assembly | – | – | – | – | – |
| Cable pull-in and cable landfall (first end/second end, with/without cable protection systems)Assembly | – | – | – | – | – |
| Electrical work (cable pulling, joint installation, termination installation)Assembly | – | – | – | – | – |
| Post-installation work (deep burial of cables and joints, cable securing, backfilling, rockAssembly | – | – | – | – | – |
| Commissioning (optical and electrical measurements, sheath tests, high-voltage tests)Testing | – | – | – | – | – |
| Ordnance clearance (supervision)Engineering | – | – | – | – | – |
5 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Cable plough | HD 3 Plough | – | – | – | – |
| Vertical injector | – | – | – | – | – |
| Vibratory plough | – | – | – | – | – |
| Trencher | – | – | – | – | – |
| TROV | – | – | – | – | – |
Additional services
Reference customers
Quality and Safety
eos projekt operates a certified quality and environmental management system in accordance with DIN EN ISO 9001:2015 and DIN EN ISO 14001:2015, extended by occupational health and safety management in accordance with DIN EN ISO 45001:2018. Employees are audited to level 3 of the Safety Culture Ladder (SCL) system; annual audits ensure that internal processes comply with international standards.
| Evidence | Norden |
|---|---|
| ISO 9001 | |
| ISO 14001 | |
| ISO 45001 | |
| Safety Culture Ladder Level 3 |
History
- 2008
Foundation of eos projekt GmbH by Henning Müller in Hannover
- 2015
Certification of the quality and environmental management system (DIN EN ISO 9001:2015 and DIN EN ISO 14001:2015)
- 2018
Certification of occupational health and safety management (DIN EN ISO 45001:2018)