Control cabinet construction, project planning, PLC software and installation for mechanical and plant engineering from a single source.

ES Elektroanlagen + Systemtechnik GmbH
Mannheim (DE)New on Amplifa
About ES Elektroanlagen + Systemtechnik GmbH
ES Elektroanlagen + Systemtechnik GmbH is an electrical engineering service provider headquartered in Mannheim, specializing in automation solutions for mechanical and plant engineering as well as process engineering. The service portfolio covers project planning, control cabinet construction, switchgear construction with wiring and cabling, PLC programming (including Siemens S5/S7, Allen Bradley, Mitsubishi, GE, Telemecanique), software and visualization (MMI) as well as CAD project planning with Eplan and Promis. In addition, the company offers installation, commissioning, service, documentation and turnkey solutions up to complete plant automation. Testing is carried out according to industrial standards such as DIN, EN, ISO, NEC, UL, CSA and Ex; UL and CSA approvals are held for export. The company's control systems are used, among other things, in mechanical and plant engineering, chemicals, mining, power plants, concrete mixing plants, mixing and dosing technology, dredgers, crusher controls and screening plants, and are delivered to Europe, America, Asia and Australia.
- Site
- Mannheim
- Processes
- Control cabinet construction, Switchgear construction / Wiring / Cabling, PLC programming (Siemens S5/S7, Kuhnke, GE, AEG, Klöckner-Moeller, Telemecanique, Mitsubishi,, Software / Visualization / MMI (Eplan, Promis), Project planning / Engineering / Documentation, Installation and commissioning (plant automation, turnkey), Testing according to industrial standards (DIN / EN / ISO / NEC / UL / CSA / Ex), Process control systems / Control technology / Switchgear / Energy management
- Materials
- PLC programming, Software / Visualization / MMI, CAD project planning
- Certificates
- UL approval, CSA approval, Testing per DIN/EN/ISO/NEC/UL/CSA/Ex
- Industries
- Mechanical engineering, Plant engineering, Process engineering, Process automation, Chemicals, Mining
- 01
Project planning / Engineering
- 02
Control cabinet construction
- 03
Switchgear construction / Wiring / Cabling
- 04
PLC and software development
- 05
Installation
- 06
Commissioning
- 07
Service and documentation
Processes & Systems
PLC programming
Memory-programmable controllers from Siemens S5/S7, Kuhnke, GE, AEG, Klöckner-Moeller, Telemecanique, Mitsubishi and Allen Bradley.
Software / Visualization / MMI
PC visualization and operator interfaces as a complement to control technology.
CAD project planning
Electrical engineering project planning and documentation with Eplan and Promis.
Locations

Mannheim
DEHeadquarters
Components & Products




Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Control cabinet constructionInstallation | – | – | – | – | – |
| Switchgear construction / Wiring / CablingInstallation | – | – | – | – | – |
| PLC programming (Siemens S5/S7, Kuhnke, GE, AEG, Klöckner-Moeller, Telemecanique, Mitsubishi,Engineering | – | – | – | – | – |
| Software / Visualization / MMI (Eplan, Promis)Engineering | – | – | – | – | – |
| Project planning / Engineering / DocumentationEngineering | – | – | – | – | – |
| Installation and commissioning (plant automation, turnkey)Installation | – | – | – | – | – |
| Testing according to industrial standards (DIN / EN / ISO / NEC / UL / CSA / Ex)Testing | – | – | – | – | – |
| Process control systems / Control technology / Switchgear / Energy managementEngineering | – | – | – | – | – |
| Special machinery construction and robotics applicationsInstallation | – | – | – | – | – |
Additional services
Quality & Testing
Testing of systems and control cabinets is carried out according to industrial standards such as DIN, EN, ISO, NEC, UL, CSA and Ex. UL and CSA approvals are held for international use.
| Evidence | Mannheim |
|---|---|
| UL approval | |
| CSA approval | |
| Testing per DIN/EN/ISO/NEC/UL/CSA/Ex |