
Master-certified company for heating construction, bathroom renovation, air conditioning, ventilation and water treatment from Bernried
Falter Gebäudetechnik GmbH & Co. KG
Bernried (Headquarters / Operations)New on Amplifa
About us
Falter Gebäudetechnik GmbH & Co. KG is a craft business in the SHK sector (plumbing, heating, air conditioning) based in Bernried in the district of Deggendorf. The family business was founded in 1970 by Helmut Falter in Edenstetten and has been run since 2004 by the second generation, certified heating technician Thomas Falter. The company implements heating systems including heat pumps and pellet heating, complete bathroom renovations, air conditioning and ventilation systems as well as water treatment – from consulting and planning with hydraulic balancing and BAFA subsidy advice, through professional installation, to maintenance and emergency service. Technology deployed includes, among others, air-to-water heat pumps from Wolf and iDM with buffer and cooling storage tanks as well as pellet boilers from ETA. Customers are private households, companies and public buildings in Bernried, Deggendorf, Metten and Schwarzach. The company is a recognized training business.
- Site
- Bernried
- Processes
- Heating construction (planning, installation, modernization of heating systems), Heat pump installation (air/water heat pumps), Pellet heating / biomass heating installation, Bathroom renovation / plumbing installation (complete bathrooms, walk-in showers, WC, washbasins), Water treatment (drinking water quality), Air conditioning installation (split and multi-split air conditioners), Ventilation system installation (central living space ventilation with heat recovery), Heating service, maintenance & emergency service
- Founded
- 1970
- Industries
- Building technology / SHK, Private households, Companies, Public buildings, public buildings
- 01
Consulting and planning (incl. hydraulic balancing, BAFA subsidy advice)
- 02
Installation and assembly of the systems
- 03
Service, maintenance and emergency service
Locations

Bernried
DEHeadquarters / Operations
- Air-to-water heat pumps (e.g. Wolf, iDM)
- Pellet boilers (ETA)
- Split/multi-split air conditioning systems
- Living space ventilation with heat recovery
Inside the production






Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Heating construction (planning, installation, modernization of heating systems)Assembly | – | – | – | – | – |
| Heat pump installation (air/water heat pumps)Assembly | – | – | – | – | – |
| Pellet heating / biomass heating installationAssembly | – | – | – | – | – |
| Bathroom renovation / plumbing installation (complete bathrooms, walk-in showers, WC, washbasins)Assembly | – | – | – | – | – |
| Water treatment (drinking water quality)Assembly | – | – | – | – | – |
| Air conditioning installation (split and multi-split air conditioners)Assembly | – | – | – | – | – |
| Ventilation system installation (central living space ventilation with heat recovery)Assembly | – | – | – | – | – |
| Heating service, maintenance & emergency serviceAssembly | – | – | – | – | – |
| Heating planning and design (incl. hydraulic balancing, BAFA subsidy advice)Engineering | – | – | – | – | – |
3 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Air-to-water heat pump | Wolf | – | – | – | Deggendorf (reference project) |
| Air/water heat pump with cooling storage tank | iDM | – | – | – | Deggendorf area (reference project) |
| Pellet boiler | ETA | – | – | – | Edenstetten (reference project) |
Additional services
History
- 1970
Foundation of the heating construction business by Helmut Falter in Edenstetten (district of Deggendorf)
- 2004
Takeover of the parental business by son Thomas Falter after master craftsman examination
- 2024
Change of legal form to Falter Gebäudetechnik GmbH & Co. KG