Regional distribution network operator for electricity and fiber-optic internet with its own hydropower plants in Eastern Styria

Feistritzwerke-STEWEAG GmbH
Gleisdorf (AT) · Dechantskirchen (AT)New on Amplifa
About Feistritzwerke
Feistritzwerke-STEWEAG GmbH was founded in 1905 by the municipality of Gleisdorf to supply electricity and today operates the second-largest electricity distribution network by area in Styria. The company plans, builds and operates electricity distribution and communication systems, runs a network of around 5,112 km of line length with over 63,000 metering points in a network area of 1,115 km² and supplies around 50,000 customers. In addition, the company operates several of its own hydropower plants, including the Stubenbergklamm power plant, the Gliederwehr power plant on the Raab river, and the run-of-river power plants St. Johann, Edelsee and Neudörfl. Since 2018, Feistritzwerke has been engaged in large-scale broadband expansion and offers pure fiber-optic internet (FTTH) as an open-access network. Further services include the planning, installation and operation of LED lighting systems for municipalities and sports facility operators as well as support for energy communities (GEA, EEG, BEG). Since 2011, the company no longer acts as an electricity supplier, but concentrates on its role as a distribution network operator with services relating to grid connection, smart meters and cable information.
- Site
- Gleisdorf
- Processes
- Electricity network operation (distribution network), Fiber-optic internet (broadband expansion, open-access network), Operation of hydropower plants (green electricity generation), Planning, installation and operation of lighting systems (street, square, building and, Cable information, Energy communities (GEA, EEG, BEG) support, Electricity grid connection, Survey and planning of LED lighting
- Materials
- Electricity distribution network, Fiber optics (FTTH), Hydropower, LED lighting technology
- Certificates
- Regulated by E-Control Austria, Certifications demonstrable
- Founded
- 1905
- Industries
- Energy supply (electricity distribution network), Telecommunications / broadband internet, Renewable energies (hydropower, photovoltaics), Municipalities / public sector (lighting systems)
- 01
Network planning
- 02
Grid connection / cable construction
- 03
Network operation and maintenance
- 04
Metering (smart meters)
- 05
Services: cable information, energy communities
- 06
Operation of own hydropower plants
- 07
Fiber-optic expansion and operation
Services & Networks
Electricity distribution network
Operation and expansion of the distribution network with 5,112 km of line length in an area of 1,115 km².
Fiber optics (FTTH)
Pure fiber-optic technology for broadband connections with bandwidths over 1 Gbit/s as an open-access network.
Hydropower
Operation of five hydropower plants with Francis and Kaplan turbines for green electricity generation.
LED lighting technology
Planning, installation and operation of street, square, building and sports facility lighting.
Locations

Gleisdorf
ATHeadquarters, customer center, network operations
- Materials
- Electricity network, fiber optics, hydropower
Dechantskirchen
ATBranch office

Stubenbergklamm
ATHydropower plant with visitor power plant museum
- 2 Francis turbines
- Residual water screw

St. Johann
ATRun-of-river power plant
- Kaplan turbine
Edelsee
ATRun-of-river power plant
- Kaplan turbine
Neudörfl
ATRun-of-river power plant
- Kaplan tube turbine

Gliederwehr
ATHydropower plant on the Raab
- Vertical-axis Kaplan turbine
Service Areas



Inside the production





Industries
Additional services
Reference customers
Quality & Regulation
As a regulated distribution network operator, Feistritzwerke is subject to supervision by E-Control Austria and RTR GmbH. Grid connections and electrical installations are inspected and documented in accordance with the network operator's implementation guidelines.
| Evidence | Gleisdorf |
|---|---|
| Regulated by E-Control Austria | |
| Certifications demonstrable |
History
- 1905
Foundation of Feistritzwerke by the municipality of Gleisdorf; first power plant on the Feistritz near Stubenberg, first power line to Gleisdorf
- 1951
Construction of the Gliederwehr power plant by Anton Glieder
- 1957
Construction of the St. Johann power plant (comprehensively renovated in 1997, fish passage aid in 2015)
- 1963
Construction of the Edelsee power plant (comprehensively renovated in 1989)
- 1980
Construction of the Neudörfl power plant
- 2000
Strategic stake of Energie Steiermark with 27%; City of Gleisdorf holds 73% via Stadtwerke Gleisdorf GmbH
- 2011
Focus on the role as distribution network operator; no longer an electricity supplier
- 2015
Complete renewal of the Stubenbergklamm power plant (2 Francis turbines, residual water screw); the old power station building accessible as a visitor power plant museum
- 2018
Start of engagement in fiber-optic network expansion
- 2019
Start of replacing analog electricity meters with smart meters
- 2022
Takeover and revitalization of the Gliederwehr power plant; commissioning in September 2022 on the Raab
- 2025
Anniversary week: 120 years of Feistritzwerke, 25 years of Stadtwerke Gleisdorf