Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
FEST – Fertigung

Containerized PEM electrolysers and turnkey systems for the production, storage and refueling of green hydrogen.

FEST Logo

FEST GmbH

38644 GoslarNew on Amplifa

GmbHLegal form
HRB 207604Commercial register Braunschweig

About FEST

FEST GmbH, headquartered in Goslar, develops, manufactures and markets containerized electrolysis systems for the decentralized production of green hydrogen. The company offers turnkey hydrogen production plants that include planning and project management, detailed engineering, procurement and manufacture of all materials and components, assembly, commissioning, training and maintenance. In addition to the PEM electrolysers in the Power-to-Gas container, the portfolio includes plant peripherals for compression up to 1000 bar (MAX Compression System), storage (MAX Storage), decanting into trailers (MAX ReCab) as well as refueling systems for 750 and 350 bar (MAX Dispenser). Reference projects include, among others, a 2.5 MW electrolyser for Bosch in Bamberg, systems for Stadtwerke Düsseldorf, Kärntner Restmüllverwertungs GmbH and the gas producer Strandmøllen AB in Sweden. The systems are used in industry, mobility, energy supply, public transport, rail transport and the maritime sector.

Site
Goslar
Processes
PEM electrolysis (containerized electrolysis systems for producing green hydrogen), Process automation of industrial processes, Complete H2 solutions (planning, engineering, procurement, manufacturing, assembly, commissioning,, Turnkey hydrogen production plants, Planning and project management, Detailed engineering, Procurement and manufacture of materials and components, Assembly
Materials
Hydrogen (H2), PEM electrolysis, Process automation
Industries
Industry, Mobility, Energy, Public transport, Maritime industry, Rail transport
  1. 01

    Planning and project management

  2. 02

    Detailed engineering

  3. 03

    Procurement and manufacture of materials and components

  4. 04

    Assembly

  5. 05

    Commissioning

  6. 06

    Training

  7. 07

    Maintenance

Technology & Processes

PEM

PEM electrolysis

Containerized power-to-gas systems for producing green hydrogen from renewable electricity, including in the 75 kW, 2 MW and 3 MW range.

PROAUT

Process automation

Fully automated control of electrolysis drawing on many years of experience in the automation of industrial processes.

Locations

Standort Goslar

Goslar

DE

Headquarters

Products & Plant Components

PEM electrolyser in a container
PEM electrolyser in a containerPEM electrolysis · Energy
Electrolysis container 75 kW
Electrolysis container 75 kWPEM electrolysis · Mobility
MAX Storage – hydrogen storage
MAX Storage – hydrogen storagePlant peripherals · Energy
MAX ReCab – decanting control container
MAX ReCab – decanting control containerPlant peripherals · Mobility

Inside the production

Electrolysis plant 2 x 2.5 MW in Frankfurt am Main
Electrolysis plant 2 x 2.5 MW in Frankfurt am Main
Parallel 2 MW and 3 MW plants from an aerial perspective
Parallel 2 MW and 3 MW plants from an aerial perspective
FEST electrolysis plant at customer Wiener Netze
FEST electrolysis plant at customer Wiener Netze
Detailed view of the plant in Vienna
Detailed view of the plant in Vienna
View of a FEST hydrogen plant
View of a FEST hydrogen plant
Commissioning of the Stadtwerke Düsseldorf electrolyser
Commissioning of the Stadtwerke Düsseldorf electrolyser

Industries

IndustryMobilityEnergyPublic transportMaritime industryRail transportCircular economy/waste recovery

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
PEM electrolysis (containerized electrolysis systems for producing green hydrogen)Engineering–––––
Process automation of industrial processesEngineering–––––
Complete H2 solutions (planning, engineering, procurement, manufacturing, assembly, commissioning,Engineering–––––

7 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
PEM electrolyser (power-to-gas container)FEST–e.g. 2.5 MW (Bosch Bamberg), 3 MW (Sweden), 2 MW (Cuxhaven), 2 x 3 MW configuration––
Power container greenpowerbox (rectifier, water treatment, control system)FEST greenpowerbox––––
Hydrogen compression system (up to 1000 bar)FEST MAX Compression System–Compression up to 1000 bar––
Hydrogen storageFEST MAX Storage––––
Decanting control container for transport storage (trailers)FEST MAX ReCab––––
Hydrogen refueling system (750 and 350 bar)FEST MAX Dispenser–750 bar and 350 bar––
Recirculation cooler (large-dimensioned, slow-running, low noise emissions)FEST––––

Additional services

Turnkey hydrogen production plantsPlanning and project managementDetailed engineeringProcurement and manufacture of materials and componentsAssemblyCommissioningTrainingMaintenanceProcess automationComplete H2 solutions incl. compression (up to 1000 bar), storage, refueling (750/350 bar)

Reference customers

Bosch (Bamberg, 2.5 MW electrolyser with Bosch Hybrion stacks)Stadtwerke DüsseldorfKärntner Restmüllverwertungs GmbH (KRV), ArnoldsteinStrandmøllen AB, Ljungby (Sweden)

History

  1. 2026

    Steffen Bäuerle assumed sole management of FEST GmbH effective 1 August 2026.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo