Franz Traub GmbH & Co. KG is a construction company based in the Aalen district of Ebnat (Baden-Württemberg), specialized in the building material concrete and commercial construction. The company plans, produces, delivers and erects individual reinforced concrete and prestressed concrete precast components such as columns, walls, purlins, slabs, stairs, sandwich walls, solid ceilings, downstand beams and support girders. Production takes place in the company's own prestressed concrete and precast plant; transport to the construction sites is handled with its own trucks and erection is carried out with its own mobile cranes, partly at night. In addition to precast work, Traub offers earthworks and structural shell construction, turnkey construction as general contractor as well as engineering and planning services. Typical project environments are production and storage halls as well as operating buildings for industrial companies, including projects for ebm-papst, Varta, Kaco, Fendt Caravan, IPR and Schubert Fertigungstechnik. The range of services is complemented by mobile crane and equipment rental as well as the rental of commercial and industrial halls.
- Site
- Aalen-Ebnat, Baden-Württemberg
- Processes
- Manufacture of precast and prestressed concrete parts (reinforced concrete precast components), Earthworks and structural shell construction (cast-in-place concrete foundations, sewer and conduit, Erection of reinforced concrete precast components (with own mobile cranes), Turnkey construction as general contractor/general contractor (foundations, building construction,, Civil and structural engineering construction, Engineering and planning services, Mobile crane and equipment rental, Delivery and logistics of precast components with own trucks/commercial vehicles
- Materials
- Concrete (cast-in-place and precast), Steel (reinforcing steel), Reinforced concrete, Sandwich walls (sandwich precast components), Reinforced concrete (cast-in-place and precast), Prestressed concrete, Reinforcing steel
- Industries
- Commercial construction, Industrial construction/hall construction, Agriculture/vehicle body manufacturing halls, Toolmaking, Robotics/peripheral supply, Battery/storage technology
- 01
Planning and engineering services
- 02
Production of reinforced concrete precast components in the company's own
- 03
Transport of precast components with the company's own trucks
- 04
On-site erection with the company's own mobile cranes
- 05
Earthworks and structural shell construction
- 06
Turnkey construction as general contractor
Materials and Components
Reinforced concrete (cast-in-place and precast)
The company's basic material for foundations, walls and all precast components.
Prestressed concrete
Precast components manufactured in the company's own prestressed concrete plant for hall and industrial construction.
Sandwich walls (sandwich precast components)
Delivered facade precast components for hall buildings.
Reinforcing steel
E.g. 175 t of steel for a new hall building.
Site

Aalen-Ebnat
DEPrecast plant, administration, mobile crane and equipment rental
- Materials
- Reinforced concrete, prestressed concrete, sandwich precast components
- In-house prestressed concrete plant
- Mobile cranes
- Trucks for precast transport
Components




Inside the production











Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Manufacture of precast and prestressed concrete parts (reinforced concrete precast components)Casting | – | – | – | – | Concrete, Steel |
| Earthworks and structural shell construction (cast-in-place concrete foundations, sewer and conduitEngineering | – | – | – | – | Concrete, Steel |
| Erection of reinforced concrete precast components (with own mobile cranes)Assembly | – | – | – | – | Concrete, Steel |
| Turnkey construction as general contractor/general contractor (foundations, building construction,Engineering | – | – | – | – | Concrete, Steel |
| Civil and structural engineering constructionEngineering | – | – | – | – | Concrete |
| Engineering and planning servicesEngineering | – | – | – | – | – |
| Mobile crane and equipment rentalAssembly | – | – | – | – | – |
| Delivery and logistics of precast components with own trucks/commercial vehiclesAssembly | – | – | – | – | – |
3 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Mobile crane | – | – | – | – | Franz Traub GmbH & Co. KG, Aalen-Ebnat |
| Trucks / commercial vehicles for precast transport | – | – | – | – | Franz Traub GmbH & Co. KG, Aalen-Ebnat |
| Prestressed concrete plant / precast plant (production facility for concrete precast components) | – | 1 | – | – | Aalen-Ebnat |
Additional services
Reference customers
History
Traub has been offering construction services for around 70 years with a focus on the building material concrete and commercial construction.
- 2017
Execution of earthworks, structural shell and reinforced concrete precast work for the new production and storage hall of Altvater, Nufringen (247 precast components; 175 t of steel, 1,200 m³ of concrete).
- 2017
Reinforced concrete precast work for ebm-papst Herbolzheim (228 precast components, construction time 14 days).
- 2018
Precast work for Striebel Creativ-Bau, Laichingen (69 precast components incl. 18 sandwich walls).
- 2018
Production expansion at Varta, Dischingen: earthworks, cast-in-place concrete foundation (approx. 1,550 m³) and 266 precast components.
- 2018
Turnkey construction of a production and storage hall for S+F Grundbesitz, Eppingen (133 precast components, approx. 780 m³ of concrete, approx. 110 t of steel).
- 2018
Production, delivery and erection of approx. 850 concrete precast components for the site consolidation at Kaco in Kirchardt.
- 2018
Delivery of just under 40 precast components for the new building of IPR in Eppingen.
- 2018
Delivery and erection of 373 reinforced concrete precast components for Fendt Caravan, Mertingen (161 sandwich walls, 66 purlins, 47 walls, 83 columns, 16 support girders).
- 2018
Groundbreaking ceremony for the 3rd expansion building of Schubert Fertigungstechnik in Bartholomä, for which Traub executes the structural shell construction.
- 2018
As general contractor, turnkey construction of a workshop with storage hall for Gaugler und Hintz, Ellwangen (approx. 140 precast components).
- 2025/2026
Company holidays: closed from 19.12.2025 to 09.01.2026, reachable again from 12.01.2026.