Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Industrial Automation from Lüneburg: Control Cabinet Construction, PLC Programming, and Retrofitting – from Planning to Commissioning.

G.

G.E.M. mbH (Gesellschaft für Elektrotechnik und Maschinenbau mbH)

Lüneburg · HeadquartersNew on Amplifa

1988Founded
5.000+Completed Projects
250+Customers
1Location in Lüneburg

About G.E.M. mbH

G.E.M. mbH is an electrical engineering and automation company based in Lüneburg that implements industrial electrical projects for industry and commercial use. The portfolio of services includes the design and planning of control and switchgear systems, the construction of switchgear and control cabinets from sheet steel or stainless steel (including Hygienic Design for the food industry and ATEX editions for explosive hazardous areas), electrical CAD documentation, PLC programming and visualization, electrical installation, commissioning, and remote maintenance. The offering is supplemented by E-Check and device testing, energy and building technology, low-voltage main distributions, controls for Combined Heat and Power Plants (CHP), and Smart Home solutions based on KNX. Customers come from the food industry, the wood processing and cement processing industries, power plant, petrochemical, and shipbuilding sectors, as well as the automotive industry. According to the company, established since 1988, the company has completed over 5,000 projects for more than 250 customers; circuit diagrams are created in German, English, and French.

Site
Lüneburg
Processes
Design and Planning of control and switchgear construction, Manufacturing and construction of switchgear with control cabinets (sheet steel or stainless steel,, Refurbishment and expansion of existing switchgear, Cable laying in cable trays, ladder trays, installation pipes, or cable ducts, Electrical wiring diagrams and documentation (Electrical CAD, WsCad ELECTRIX Rocket, Eplan P8 2.9), Industry and automation technology: Manufacturing of controls using relay or PLC technology, PLC programming and visualization (SIEMENS SIMATIC S5/S7, TIA-Portal, Beckhoff EtherCAT, B&R,, E-Check and device inspection of electrical systems and equipment (DGUV V3/V4, VDE 0105--100, VDE
Materials
Sheet Steel, Stainless Steel, Plastic
Certificates
Low Voltage Directive 2014/35/EU, Machinery Directive 2006/42/EC, DGUV V3/V4 (E-Check), VDE 0105-100 / VDE 0701-0702
Founded
1988
Industries
Food Industry, Wood Processing Industry, Power Plant Technology, Cement Processing Industry, Petrochemical Industry, Shipbuilding
  1. 01

    Design and Planning (Safety Concepts, Specifications)

  2. 02

    Electrical CAD: Wiring Diagrams and Documentation

  3. 03

    Control and Switchgear Construction

  4. 04

    PLC Programming and Visualization

  5. 05

    Electrical Installation and Cable Laying

  6. 06

    Commissioning, Training, and Test Protocols

  7. 07

    Remote Maintenance and Fault Diagnosis

Materials and Implementations

Stahlblech

Sheet Steel

Material for control cabinets, switchgear, and cable ducts according to Low Voltage and Machinery Directives.

Edelstahl

Stainless Steel

For control cabinets in Hygienic Design (food industry) as well as for cable laying in demanding environments.

Kunststoff

Plastic

Material for cable ducts and installation pipes during cable laying

Locations

Lüneburg

DE

Headquarters with manufacturing, planning, and programming

Materials
Sheet Steel, Stainless Steel, Plastic
  • Eplan P8 2.9
  • WsCad ELECTRIX Rocket
  • SIEMENS SIMATIC S5/S7 / TIA-Portal
  • Beckhoff EtherCAT
  • B&R
  • Allen-Bradley
  • CODESYS
  • KNX

Industries

Food IndustryWood Processing IndustryPower Plant TechnologyCement Processing IndustryPetrochemical IndustryShipbuildingAutomotive IndustryManufacturing PlantsCrematorium

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Design and Planning of control and switchgear constructionEngineering–––––
Manufacturing and construction of switchgear with control cabinets (sheet steel or stainless steel,Assembly––––Sheet Steel, Stainless Steel
Refurbishment and expansion of existing switchgearAssembly–––––
Cable laying in cable trays, ladder trays, installation pipes, or cable ductsAssembly––––Sheet Steel, Stainless Steel, Plastic
Electrical wiring diagrams and documentation (Electrical CAD, WsCad ELECTRIX Rocket, Eplan P8 2.9)Engineering–––––
Industry and automation technology: Manufacturing of controls using relay or PLC technologyAssembly–––––
PLC programming and visualization (SIEMENS SIMATIC S5/S7, TIA-Portal, Beckhoff EtherCAT, B&R,Engineering–––––
E-Check and device inspection of electrical systems and equipment (DGUV V3/V4, VDE 0105--100, VDETesting–––––
Manufacturing and installation of low-voltage main distributions (NSHV)Assembly–––––
Manufacturing and installation of controls for CHP unitsAssembly–––––
Electrical installation: Installation of electrical control and energy distribution systems indoorsAssembly–––––
Retrofitting: Modernization of plant controls including new PLC, visualization with touch screenAssembly–––––
Smart Home (Planning, realization, programming, manufacturer-independent, KNX)Assembly–––––
Commissioning, training, measurement and testing protocols, fault diagnosis/remote maintenanceTesting–––––

Additional services

Industrial AutomationDesign and PlanningControl and Switchgear ConstructionElectrical CAD / Wiring Diagrams and DocumentationPLC Programming and VisualizationE-Check and Device TestingEnergy and Building TechnologySmart HomeElectrical InstallationRetrofitCommissioningRemote MaintenanceSafety Concepts

Quality and Standards

Realization is carried out in accordance with European Low Voltage Directive 2014/35/EU and Machinery Directive 2006/42/EC; tests are performed according to DGUV V3/V4, VDE 0105-100, and VDE 0701-0702. Documentation includes declarations of conformity, safety certificates, as well as ATEX and ship approvals (DNV-GL).

EvidenceLüneburg
Low Voltage Directive 2014/35/EU
Machinery Directive 2006/42/EC
DGUV V3/V4 (E-Check)
VDE 0105-100 / VDE 0701-0702

History

  1. 1988

    Registered in the Commercial Register (HRB 909, District Court of Lüneburg) on June 2, 1988

  2. 2005

    Rainer Kaesebier becomes Managing Director

  3. 2025

    Eugen Herklotz becomes Managing Director, Thomas Wellhausen retires

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account