
Manufacturer of microduct systems, moulded parts, splice closures and house connection boxes for fibre optic and broadband expansion.
gabo Systemtechnik GmbH
NiederwinklingNew on Amplifa
System solutions for fibre optic and broadband expansion
gabocom (gabo Systemtechnik GmbH) develops and produces system solutions for fibre optic and broadband expansion. The portfolio includes microduct systems (speedpipe) for direct burial, duct bundles SRV-G, duct-in-duct solutions, moulded parts for sealing, connecting and fixing, splice closures for above-ground and underground applications, wall-mountable, UV-resistant house connection boxes (HüP/APL/Gf-TA) as well as half-pipe systems for repairing and extending existing cable duct pipes. Production takes place at the Niederwinkling site, where a cumulative 4.200.000 km of microduct systems have been manufactured. Every speedpipe production lot is tested for maximum service life in a pressure test according to DIN 16874. The target groups are network operators, municipal utilities, planners, municipalities and installers; the products are distributed worldwide via a network of regional contacts. The company belongs to the HellermannTyton Group and has 50 years of experience in telecommunications.
- Site
- Niederwinkling
- Processes
- Manufacture of microduct systems (speedpipe, duct bundles SRV-G), Pressure test according to DIN 16874 for every speedpipe production lot, Half-pipe systems (KKHR, HRMA, moulded parts) and accessories (EZA-t, AdSe-t, KKGB), Splice closures for above-ground and underground applications, House connection boxes HüP/APL/Gf-TA (wall-mountable, UV-resistant housings), Coupling sleeves, branch units and installation tools for duct systems, Product finder and technical product consulting, Technical support
- Materials
- Microduct system plastic (material not specified; tested according to DIN 16874), Microduct plastic (speedpipe), Pressure test according to DIN 16874
- Certificates
- DIN 16874 pressure test (product testing), ISO 9001
- Employees
- 300
- Industries
- Telecommunications / fibre optic and broadband expansion, Network operators, Municipal utilities, Planners, Municipalities, Installers
- 01
Development and product consulting
- 02
Extrusion of the microduct systems in Niederwinkling
- 03
Pressure test according to DIN 16874 for each production lot
- 04
Moulded part and housing production
- 05
Product documentation and distribution via regional contacts
- 06
Technical support
Plastics and testing methods
Microduct plastic (speedpipe)
Material of the microduct systems for direct burial, tested according to DIN 16874.
Pressure test according to DIN 16874
Testing procedure to ensure maximum service life, applied to every speedpipe production lot.
Production site
Niederwinkling
DEProduction
- Materials
- Plastic (microduct systems)
Products

Inside the production

Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Manufacture of microduct systems (speedpipe, duct bundles SRV-G)Plastics | – | – | – | – | – |
| Pressure test according to DIN 16874 for every speedpipe production lotTesting | – | – | – | – | – |
| Half-pipe systems (KKHR, HRMA, moulded parts) and accessories (EZA-t, AdSe-t, KKGB)Plastics | – | 6000 mm | – | – | – |
| Splice closures for above-ground and underground applicationsAssembly | – | – | – | – | – |
| House connection boxes HüP/APL/Gf-TA (wall-mountable, UV-resistant housings)Assembly | – | – | – | – | – |
| Coupling sleeves, branch units and installation tools for duct systemsAssembly | – | – | – | – | – |
Additional services
Quality
Every speedpipe production lot is tested for maximum service life in a pressure test according to DIN 16874. Quality is ensured according to recognised standards.
| Evidence | Niederwinkling |
|---|---|
| DIN 16874 pressure test (product testing) | |
| ISO 9001 |
History
- 2006
Start of production of microduct bundles SRV-G; 2026 anniversary “20 years of speedpipe duct bundles SRV-G”
- 2026-02
Gerhard Kroiss takes over overall sales responsibility for Germany in addition to managing the Austrian market
- 2026-04
Matthew Hunter takes over the chair of the management board (additionally President of the HellermannTyton Telecoms Unit)