Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Operates a gas high-pressure network of around 600 km and offers engineering services around gas infrastructure

GA

Ganeos AG

Zurich (Head office) · Schlieren (Visitor and delivery address)New on Amplifa

2008Initial certification ISO 9001 and ISO 14001
600 kmGas high-pressure network
> 5 barOperating range of the high-pressure pipelines
65,98 %Ownership share Energie 360° AG
from September 2025Rename Erdgas Ostschweiz AG → Ganeos AG

About Ganeos

The Ganeos AG (until September 2025 Erdgas Ostschweiz AG) is a Transport System Operator (TSO) for Eastern Switzerland and the Greater Zurich area. The company operates a gas high-pressure network of around 600 kilometers, which connects the Zurich region with Lake Constance and with Chur/Cazis and links international feed-in points with regional distribution networks and large industrial consumers. In addition to network operation, Ganeos offers technical services: network access and balancing zone responsibility, energy data management, plan information, project management for gas and network infrastructure as well as support for third-party construction projects in the vicinity of high-pressure pipelines including ERI approval procedures. The value chain ranges from technical consulting and project planning through construction supervision and pipeline construction (underground installation of steel high-pressure pipelines above 5 bar) to safe network operation with route inspections and emergency operation. Reference projects include the gas connection of the Birr reserve power plant, the Rhesi flood protection project on the Alpine Rhine, the runway extension of Zurich Airport and the pipeline bypass following the landslide near Lütisburg. The quality and environmental management system is certified according to ISO 9001 and ISO 14001. The head office is in Zurich, the visitor and delivery address is Schlieren.

Site
CH-8010 Zurich
Processes
Gas high-pressure network operation (gas transport), Project planning & construction supervision gas infrastructure, Project planning and connection to the gas high-pressure network (e.g. gas pipeline project Birr, Technical consulting & safety concepts, Plan information / utility pipeline plans (PDF, DXF), Pipeline location / route inspections, Pipeline construction / pipework (underground installation), Network access / Network use (balancing zone responsible parties, balancing group contracts)
Materials
Natural Gas, Steel Pipelines
Certificates
ISO 9001:2015, ISO 14001:2015
Industries
Energy Industry / Gas Transport (TSO), Regional Energy Suppliers, Large Industrial Consumers, Construction and Infrastructure Projects, Energy Industry / Gas Transport (Transport System Operator), regional energy suppliers
  1. 01

    Technical consulting and safety concepts

  2. 02

    Project planning and approval procedures (ERI)

  3. 03

    Construction supervision and pipeline construction (underground installation)

  4. 04

    Commissioning and network operation

  5. 05

    Energy data management and network access

  6. 06

    Route inspections and maintenance

Infrastructure and Media

EDG

Natural Gas

Transport medium in the around 600 km high-pressure network above 5 bar.

ST-R

Steel Pipelines

Material of the underground-installed gas high-pressure pipelines.

Locations

Zurich

CH

Head office (postal address)

Materials
Natural Gas
  • Energy data management / dispatching system

Schlieren

CH

Visitor and delivery address

Materials
Natural Gas

Industries

Energy Industry / Gas Transport (TSO)Regional Energy SuppliersLarge Industrial ConsumersConstruction and Infrastructure ProjectsEnergy Industry / Gas Transport (Transport System Operator)regional energy supplierslarge industrial consumers

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Gas high-pressure network operation (gas transport)Engineering–600 km (network)–––
Project planning & construction supervision gas infrastructureEngineering–––––
Project planning and connection to the gas high-pressure network (e.g. gas pipeline project BirrEngineering–450 m (reference project)–––
Technical consulting & safety conceptsTesting–––––
Plan information / utility pipeline plans (PDF, DXF)Engineering–––––
Pipeline location / route inspectionsTesting–––––
Pipeline construction / pipework (underground installation)Assembly––––Steel pipelines (gas high-pressure pipelines, above 5 bar)

2 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Gas high-pressure network (pipeline routes)–1around 600 km network, Zurich region to Lake Constance and Chur/Cazis–Eastern Switzerland and Greater Zurich area
Energy data management / dispatching system––––Zurich

Additional services

Network access / Network use (balancing zone responsible parties, balancing group contracts)Energy data management / meter data coordinationPlan information (utility pipeline plans, PDF/DXF)Project management for gas and network infrastructure (consulting, project planning, constructionSupport of third-party construction projects in the vicinity of high-pressure pipelines (ERIRoute inspections / safety along the pipeline routesFault reporting / emergency operation

Reference customers

Birr Reserve Power Plant (GE site)Zurich AirportRhesi Flood Protection Project (Alpine Rhine)

Quality and Certification

The quality and environmental management system for the transport of natural gas and related services is certified according to ISO 9001:2015 and ISO 14001:2015 (Swiss Safety Center AG). Regular route inspections along the pipeline routes ensure early detection of hazards.

EvidenceSchlieren
ISO 9001:2015
ISO 14001:2015

History

  1. 2008

    Initial certification according to ISO 9001 and ISO 14001 (27.03.2008)

  2. 2019

    Award of the Erdgas Ostschweiz AG by the Natur & Wirtschaft Foundation

  3. 2020

    Measures implemented for greater supply security and adjusted strategy

  4. 2024

    Landslide near Lütisburg: Involvement in situation assessment and planning of a pipeline bypass (implementation planned for 2026)

  5. 2025

    Erdgas Ostschweiz AG announces on the occasion of the 60th ordinary general meeting that it will operate as Ganeos AG from September 2025

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo