Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Gravel plant and ready-mix concrete plant with production of precast concrete elements (diArco arch systems) in Edling, Upper Bavaria.

AD

Gebr. Adler GmbH & Co. KG

Edling (83533), DENew on Amplifa

1956Founded
Edling (Upper Bavaria)Location
Ready-mixed concrete, gravel, precastAreas of activity
17,000 m³Largest individual contracted project (Fairchild)

About us

Gebr. Adler GmbH & Co. KG was founded in 1956 by the brothers Rudolf and Konrad Adler as a gravel plant in Edling and remains based at its headquarters at Albachinger Straße 20 to this day. Since 1969 the company has produced ready-mixed concrete; in 1983 the facility was expanded with a second large mixing tower. The gravel and ready-mix concrete plants form the business foundation of the company. The basic concrete recipe consists of cement, the mineral aggregates sand and gravel, and water; depending on the formulation, concrete types are produced for load-bearing capacity as well as thermal, moisture, fire or acoustic protection. In 1999 the company entered the production of precast concrete elements with the diArco arch systems, which are used in wine cellar construction (viticulture) as well as in residential construction. Reference projects include bridges of the Haag (B12) and Wasserburg am Inn bypass roads, the B15 bridge over the Attel, multi-storey car parks in Wasserburg, and the Fairchild project with 17,000 m³ of concrete. Deliveries go to Germany as well as Norway, Denmark, Hungary, Austria and Switzerland.

Site
Edling
Processes
Gravel extraction (gravel plant), Ready-mixed concrete production, Production of precast concrete elements (diArco arch systems), Gravel extraction, Precast concrete elements (diArco arch systems), Delivery/logistics
Materials
Cement, Sand (aggregate), Gravel (aggregate), Concrete (ready-mixed concrete), Precast concrete elements (diArco arch systems), Ready-mixed concrete
Founded
1956
Industries
Building construction, Civil engineering, Bridge construction, Residential construction, Viticulture (wine cellars), Furniture construction
  1. 01

    Gravel extraction (gravel plant)

  2. 02

    Ready-mixed concrete production

  3. 03

    Production of precast concrete elements (diArco arch systems)

  4. 04

    Delivery/logistics

Materials & Processes

ZEM

Cement

Cement made from limestone and clay forms, together with water, the cement paste that binds the aggregate.

KIES

Gravel (aggregate)

Aggregate extracted from the company's own gravel plant in Edling for concrete production.

SAND

Sand (aggregate)

Natural sand as aggregate in the concrete mix.

TB

Ready-mixed concrete

Concrete with project-specific formulations for structural and civil engineering as well as house and furniture construction.

FERT

Precast concrete elements (diArco arch systems)

Prefabricated arch elements for wine cellars and residential construction.

Sites

Edling

DE

Gravel plant and ready-mix concrete plant (headquarters)

Materials
Cement, sand, gravel, concrete
  • 2 mixing towers (ready-mix concrete plant, expansion 1983)

Industries

Building constructionCivil engineeringBridge constructionResidential constructionViticulture (wine cellars)Furniture construction

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Gravel extraction (gravel plant)Casting––––Sand, Gravel
Ready-mixed concrete productionCasting––––Cement, Sand, Gravel, Water, Concrete
Production of precast concrete elements (diArco arch systems)Casting––––Concrete, Cement

1 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Mixing tower (ready-mix concrete plant)–2–1983Edling

Additional services

Ready-mixed concrete productionGravel extractionPrecast concrete elements (diArco arch systems)Delivery/logistics

Reference customers

Fairchild (now Wacker site)diArco arch systems

History

  1. 1956

    Founding of Gebr. Adler by the brothers Rudolf and Konrad Adler with a gravel plant in Edling

  2. 1969

    Entry into ready-mixed concrete production

  3. 1983

    Expansion of the ready-mix concrete plant with a second large mixing tower after the 2nd generation joined (Peter and Rudolf Adler Jun.)

  4. 1995

    Konrad Adler passed away

  5. 1999

    Entry into the production of precast concrete elements with diArco arch systems

  6. 2008

    Rudolf Adler sen. passed away

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo