GEOMIN – Fertigung

Extraction and processing of rocks as well as production of asphalt mix and ready-mixed concrete at seven locations.

GEOMIN Logo

GEOMIN Erzgebirgische Kalkwerke GmbH

Venusberg · Zeithain · Grüna · Lengefeld (Pockau-Lengefeld) · HammerunterwiesenthalNew on Amplifa

120 (+10 apprentices)Employees
7Locations
4Asphalt plants
2Concrete plants
up to 100,000 t/yearProduction capacity Lengefeld lime works (until 2015)

About us

The raw material producers are an association of the companies ard Baustoffwerke, SH Natursteine and GEOMIN and operate a total of seven locations in Saxony and Saxony-Anhalt. The company extracts and processes rocks such as amphibolite, marble, dolomitic marble and limestone, producing chippings, grit, road construction materials, fillers and dried grain sizes from them. In addition, it produces asphalt mix for base, binder and surface courses as well as mastic asphalt in its own asphalt mixing plants, and ready-mixed concrete in two concrete plants. Around 120 employees, including ten apprentices, supply customers from large construction sites to private projects, including road construction, rail track construction, civil and structural engineering, and agriculture. In the Venusberg amphibolite quarry, a grey-black hard rock is mined; the Lengefeld lime works, whose lime extraction dates back to the 16th century, serves as a processing site for fillers and dried grain sizes. The portfolio is complemented by residual material acceptance, over-the-counter sales and delivery logistics.

Site
Venusberg
Processes
Asphalt mix production (base, binder and surface course, mastic asphalt), Ready-mixed concrete production, Rock processing (crushing, screening) of chippings, grit, road construction materials, fillers, Quarry extraction (blasting, LHD mining in room-and-pillar method), Production of fillers and dried grain sizes for the plaster and concrete block industry, Residual material acceptance, Over-the-counter sales/traded goods, Sales/logistics (delivery)
Materials
Amphibolite, Marble / dolomitic marble, Limestone / carbonated magnesian lime, Gravel 2/8 (concrete gravel), Natural sand, in-situ 0/2, Asphalt (base, binder, surface course, mastic asphalt), Concrete, Gravel (concrete gravel 2/8, among others)
Certificates
In-house inspection / WPK, Certified energy management
Employees
120
Industries
Road construction, Civil and structural engineering, Rail track construction, Construction industry/building materials industry, Industrial goods production, Agriculture
  1. 01

    Quarry extraction (blasting, LHD mining)

  2. 02

    Rock processing (crushing, screening)

  3. 03

    Asphalt mix production

  4. 04

    Ready-mixed concrete production

  5. 05

    Sales/logistics (delivery)

  6. 06

    Residual material acceptance

Rocks & Products

AMB

Amphibolite

Weathering-resistant hard rock from Venusberg for chippings, grit, paving stones, ballast and hydraulic engineering stones.

MAR

Marble / dolomitic marble

Valuable raw material from the Lengefeld deposit, used e.g. for fillers, terrazzo grain sizes and carbonated magnesian lime.

KAL

Limestone / carbonated magnesian lime

Raw material of the lime works, used as fertilizer and filler, among other things for bitumen mixing plants.

KIES

Gravel (concrete gravel 2/8, among others)

Extracted natural gravel as aggregate for ready-mixed concrete and for sale to large and small customers.

SAND

Natural sand, in-situ 0/2

In-situ natural sand from over-the-counter sales for construction and earthworks.

ASA

Asphalt mix

Base, binder and surface course mixes as well as mastic asphalt from four own asphalt plants for road construction.

BET

Ready-mixed concrete

Concrete produced in two concrete plants for construction projects of various applications.

Locations

Standort Venusberg

Venusberg

DE

Amphibolite quarry with asphalt mixing plant and residual material acceptance

Lot size
Bulk quantities, supply of large and small customers
Materials
Amphibolite, asphalt
  • Asphalt mixing plant
  • Dump trucks
  • Crushing and screening plant
Standort Zeithain

Zeithain

DE

Gravel extraction, concrete plant, asphalt mixing plant, sales (including Saturday sales)

Materials
Gravel, natural sand, concrete, asphalt
  • Asphalt mixing plant
  • Concrete plant

Grüna

DE

Asphalt mixing plant

Materials
Asphalt
  • Asphalt mixing plant

Lengefeld (Pockau-Lengefeld)

DE

Processing: fillers, dried grain sizes, terrazzo grain sizes

Lot size
up to 100,000 t/year (extraction until 12/2015)
Materials
Dolomitic marble, carbonated magnesian lime, fillers
  • Fine sand plant (1994)
  • Mixing station (1999)
  • Automated shaft hoisting system (2001)
  • Crushing plant
Standort Hammerunterwiesenthal

Hammerunterwiesenthal

DE

Lime works for raw material extraction

Materials
Marble, dolomitic marble, limestone

Products & Building Materials

Amphibolite grit and chippings
Amphibolite grit and chippingsQuarry extraction · Road/rail construction
Asphalt road construction (base, binder, surface course)
Asphalt road construction (base, binder, surface course)Asphalt mix · Transport infrastructure
Asphalt surface course resurfacing
Asphalt surface course resurfacingMastic asphalt · Road construction

Inside the production

ard Baustoffwerke, GEOMIN & SH Natursteine
ard Baustoffwerke, GEOMIN & SH Natursteine
Aerial view of the Venusberg processing plant
Aerial view of the Venusberg processing plant
Zeithain pumping station
Zeithain pumping station
Roadshow Venusberg
Roadshow Venusberg

Industries

Road constructionCivil and structural engineeringRail track constructionConstruction industry/building materials industryIndustrial goods productionAgriculturePlaster and concrete block industry

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Asphalt mix production (base, binder and surface course, mastic asphalt)Casting––––Asphalt, Aggregate
Ready-mixed concrete productionCasting––––Concrete, Gravel, Natural sand
Rock processing (crushing, screening) of chippings, grit, road construction materials, fillersForming––––Amphibolite, Marble/dolomitic marble, Gravel, Natural sand
Quarry extraction (blasting, LHD mining in room-and-pillar method)Forming––––Amphibolite, Marble, Limestone/dolomitic marble
Production of fillers and dried grain sizes for the plaster and concrete block industryForming––––Dolomitic marble, carbonated magnesian lime
Residual material acceptanceOther–––––

9 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Asphalt mixing plant––––Venusberg
Asphalt mixing plant––––Grüna
Asphalt mixing plant–4––(4 asphalt plants group-wide)
Concrete plant–2–––
Fine sand plant–1–1994Lengefeld
Mixing station–1–1999Lengefeld
Shaft hoisting system (automated)–1–2001Lengefeld
Crushing plant––––Lengefeld
Dump truck––––Venusberg

Additional services

Residual material acceptanceOver-the-counter sales/traded goodsSales/logistics (delivery)In-house inspection/WPKEnergy management (certified audited)

Reference customers

Max Bögl (construction execution FBE A4 Pleißtal bridge)

Quality & Certificates

Product quality is ensured through regular in-house inspections and WPK (works-owned production control). Energy management is regularly audited and certified both externally and internally.

EvidenceVenusbergZeithainGrünaLengefeld (Pockau-Lengefeld)Hammerunterwiesenthal
In-house inspection / WPK
Certified energy management

History

  1. 1528

    First documented mention of lime extraction in Lengefeld in a feudal charter.

  2. 1992

    The Lengefeld lime works becomes a division of GEOMIN Erzgebirgische Kalkwerke GmbH.

  3. 1993

    Conversion of the Lengefeld mining operation to the LHD (load-haul-dump) mining method.

  4. 1994

    Commissioning of a new fine sand plant in Lengefeld.

  5. 1999

    Commissioning of a new mixing station in Lengefeld.

  6. 2001

    Automation of the shaft hoisting system in Lengefeld.

  7. 2015

    Discontinuation of extraction work at the Lengefeld lime works for economic reasons; continued operation as a processing site.

  8. 2019

    Delivery of over 20,000 t of asphalt for the carriageway renewal of the A4 Pleißtal bridge (18,000 t base course, 7,650 t binder course), construction by Max Bögl.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo