SHK master plumbing company for bathroom renovation, heating, building services and ventilation in Neuenhaus
Gerhard Kamps GmbH
Neuenhaus · HoogstedeNew on Amplifa
About Gerhard Kamps GmbH
Gerhard Kamps GmbH is a family-run SHK master plumbing company based in Neuenhaus in the district of Grafschaft Bentheim, founded in 1935 and now run by the fourth generation. With around 22 employees, including four apprentices, the company carries out bathroom renovations, barrier-free bathrooms, heating modernisation with heat pumps, gas and LPG heating systems as well as solar thermal and pellet systems. Further service areas include heat distribution via radiators and surface heating, residential ventilation, room air conditioning, photovoltaics, smart-home systems and drinking water hygiene. Services include heating maintenance, gas safety check, pipe and sewer cleaning with its own flushing vehicle and camera inspection, structural drying, leak detection and tightness testing. For commercial customers and public institutions such as hospitals, daycare centres, schools, sports facilities, airports and trade fair grounds, commercial sanitary installations and ceiling radiant heating panels are installed. Bathroom planning is carried out digitally with a 3D bathroom planner; private and commercial customers in the Grafschaft Bentheim region are served at the Neuenhaus and Hoogstede locations (ELEMENTS showroom).
- Site
- Neuenhaus
- Processes
- Bathroom renovation / bathroom modernisation, Sanitary installations (drinking water), Heating modernisation / heating installation, Gas heating / LPG heating installation, Heat pump installation, Solar thermal / pellet heating installation, Radiator installation (panel, tubular and section radiators, convectors), Wall and underfloor heating (surface heating)
- Materials
- Sanitary, Heating and Air-Conditioning Technology
- Founded
- 1935
- Employees
- 22
- Industries
- SHK trade / Sanitary and heating, Private customers, Commercial customers, ,
- 01
Consultation and planning (3D bathroom planner, heating enquiry assistant)
- 02
Quotation with transparent cost breakdown
- 03
Installation and assembly of the systems
- 04
Commissioning and explanation
- 05
Maintenance, service and emergency service
Services and Technology
Sanitary, Heating and Air-Conditioning Technology
Installation of drinking water systems, heating and ventilation systems for private and commercial customers.
Locations
Neuenhaus
DEHeadquarters and operations
- Materials
- Sanitary, heating, building services, ventilation
- Flushing vehicle for pipe cleaning
- Structural dryers
- Camera inspection system for pipe testing
Hoogstede
DEShowroom (ELEMENTS)
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Bathroom renovation / bathroom modernisationAssembly | – | – | – | – | – |
| Sanitary installations (drinking water)Assembly | – | – | – | – | – |
| Heating modernisation / heating installationAssembly | – | – | – | – | – |
| Gas heating / LPG heating installationAssembly | – | – | – | – | – |
| Heat pump installationAssembly | – | – | – | – | – |
| Solar thermal / pellet heating installationAssembly | – | – | – | – | – |
| Radiator installation (panel, tubular and section radiators, convectors)Assembly | – | – | – | – | – |
| Wall and underfloor heating (surface heating)Assembly | – | – | – | – | – |
| Heating maintenance, heating check, gas safety check, hydraulic balancingTesting | – | – | – | – | – |
| Residential ventilation / room air conditioning / ventilation system installationAssembly | – | – | – | – | – |
| Photovoltaics installationAssembly | – | – | – | – | – |
| Smart home systems installationAssembly | – | – | – | – | – |
| Commercial sanitary installations (hospitals, daycare centres, airports, sports facilities, schools)Assembly | – | – | – | – | – |
| Ceiling radiant heating panels for commercial hallsAssembly | – | – | – | – | – |
| Pipe cleaning / pipe and sewer cleaning with camera inspectionAssembly | – | – | – | – | – |
| Structural drying / moisture measurement / leak detection / tightness testingTesting | – | – | – | – | – |
| Barrier-free bathroom (level-access shower, grab rails, wheelchair-accessible washbasins)Assembly | – | – | – | – | – |
| Assembly | – | – | – | – | – |
| Bathroom planning (3D bathroom planner, planning aids)Engineering | – | – | – | – | – |
3 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Flushing vehicle (pipe cleaning) | – | 1 | – | – | Neuenhaus |
| Structural dryer | – | – | – | – | Neuenhaus |
| Camera inspection system (pipe testing) | – | – | – | – | Neuenhaus |
Additional services
Company History
- 1935
Gerhard Kamps passes the master craftsman examination on 3 May and founds a plumbing and installation business on 13 August in Neuenhaus (Kirchstraße 3)
- 1941
Gerhard Kamps is drafted into the Wehrmacht; marriage to Hermine Rökker
- 1947
Return of the company founder from captivity as a prisoner of war, resumption of business
- 1956
New construction of the residential and commercial building at Kirchstraße 3
- 1967
New construction of the workshop
- 1972
Conversion into a limited partnership (Kommanditgesellschaft) with Helmut and Alide Wirth
- 1980
Relocation of the workshop to Weidenstraße 8 as part of urban redevelopment; 12 employees
- 1993
Gerhard Wirth takes over the business in the third generation and converts the limited partnership into a GmbH