Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Georg Lang Pegnitz – Fertigung

Bathroom renovation, sanitary and heating construction, as well as heat pump, solar, and biomass systems for private, commercial, and public sectors

Georg Lang Pegnitz Logo

GL – Georg Lang Büro für Energie und Haustechnik Badsanierung, Sanitär- und Heizungsbau GmbH

PegnitzNew on Amplifa

1992Founded
14Employees
91257 PegnitzLocation

About Georg Lang

GL – Georg Lang Energy and Building Services Bathroom Renovation, Sanitary and Heating Construction GmbH is a family business in Pegnitz in Oberfranken. It was founded by Georg Lang as a sole proprietorship in Pottenstein in 1992 and now employs 14 staff members. The range of services includes bathroom renovations with planning, 3D bathroom design, and fixed-price offers, sanitary and heating installation (gas and oil condensing technology), ventilation technology, and the installation of heat pumps, solar, pellet, and wood heating systems. Furthermore, the company offers energy consulting through a certified energy consultant, customer service and maintenance, emergency service, and hygiene services according to VDI/DVGW 6023 with a certified drinking water sample taker. Clients include private individuals, housing cooperatives, the city of Pegnitz, commercial enterprises, and healthcare facilities in the Pegnitz, Nürnberg, Schwabach, and Erlangen region. Since 1998, apprentices have been trained; Mario Lang took over management in 2024.

Site
Pegnitz
Processes
Bathroom renovation with planning and fixed-price offer (3D bathroom design, complete organization, Sanitary installation (WC systems, bathrooms, drinking water/wastewater lines), Heating installation (gas and oil condensing technology, central heating systems), Heat pump installation (air-water heat pumps, e.g., Weishaupt Biblock, 65 °C flow temperature), Biomass heating installation (pellet/firewood combination systems, pellet central heating boilers, Solar system installation, Ventilation works (exhaust air ducts), Sump pump installation (wastewater pumping below backflow level)
Materials
Ventilation Technology, Heat Pump Technology, Biomass Heating, Pipeline Installation
Certificates
VDI/DVGW 6023 Hygiene Training, Certified Drinking Water Sample Taker, Certified Energy Consultant
Founded
1992
Employees
14
Industries
Private Customers, Housing Economy/Cooperative Housing, Public Sector/Cities and Municipalities, Commercial/Companies, Healthcare
  1. 01

    On-site consultation and surveying

  2. 02

    Planning and 3D bathroom design

  3. 03

    Fixed-price offer

  4. 04

    Sanitary/Heating/Ventilation Installation

  5. 05

    Commissioning

  6. 06

    Customer service and maintenance

Services and Technology

LÜFT

Ventilation Technology

Installation of exhaust air ducts for interior rooms, including in the Pegnitz health center.

WP

Heat Pump Technology

Air-water heat pumps with supply temperatures up to 65 °C, e.g., Weishaupt Biblock.

PELLET

Biomass Heating

Pellet and firewood combination systems as well as pellet central heating boilers with buffer tanks.

ROHR

Pipeline Installation

Drinking water, wastewater, compressed air, and vacuum extraction lines, e.g., approx. 1,500 m in the Pegnitz health center.

Location

Pegnitz

DE

Energy and building services office with workshop and exhibition room

Materials
Sanitary, heating, ventilation, and energy technology
  • Exhibition room
  • Workshop

Industries

Private CustomersHousing Economy/Cooperative HousingPublic Sector/Cities and MunicipalitiesCommercial/CompaniesHealthcare

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Bathroom renovation with planning and fixed-price offer (3D bathroom design, complete organizationInstallation–––––
Sanitary installation (WC systems, bathrooms, drinking water/wastewater lines)Installation––––Pipelines (drinking water, wastewater, compressed air)
Heating installation (gas and oil condensing technology, central heating systems)Installation–––––
Heat pump installation (air-water heat pumps, e.g., Weishaupt Biblock, 65 °C flow temperature)Installation–––––
Biomass heating installation (pellet/firewood combination systems, pellet central heating boilersInstallation–––––
Solar system installationInstallation–––––
Ventilation works (exhaust air ducts)Installation–––––
Sump pump installation (wastewater pumping below backflow level)Installation–––––
Compressed air and vacuum extraction line installation (for dental practice)Installation––––Pipelines
Maintenance in sanitary and heating areas, customer service, new connections of production machinesInstallation–––––
Emergency service (sanitary/heating, Mon-Fri 8-19 h, Sat/Sun/Holidays 9-17 h)Installation–––––
Energy consulting (certified energy consultant, energy consulting for heat pumps)Engineering–––––
Hygiene according to VDI/DVGW 6023, drinking water sample taker (certified)Inspection–––––

Additional services

Bathroom renovation with planning and fixed-price offer3D bathroom designGas and oil condensing technologySolarPellet heatingWood heatingHeat pumpsSanitary installationHeating installationVentilation technologyCustomer service/maintenanceEmergency serviceEnergy consultingApprenticeship training (since 1998)

Reference customers

Stadt PegnitzWohngenossenschaft Pegnitz (WGP)Wohngenossenschaft Konradsreuth bei HofKlubert und Schmidt, PottensteinGesundheitszentrum PegnitzPolizei Pegnitz

Qualifications and Quality

Certified Energy Consultant (Exam 2007), Hygiene training according to VDI/DVGW 6023 and certified drinking water sample taker (2013); Specialist according to Water Resources Act WHG §19.

EvidencePegnitz
VDI/DVGW 6023 Hygiene Training
Certified Drinking Water Sample Taker
Certified Energy Consultant

Company History

  1. 1991

    Georg Lang's master examination in gas and water installation craft

  2. 1992

    Founding as a sole proprietorship in Pottenstein by Georg Lang

  3. 1998

    Start of apprenticeship training

  4. 2005

    160 apartments of the Pegnitz housing cooperative am Kellerberg equipped with central heating systems

  5. 2007

    Energy consultant examination with distinction; Master Prize of the Bavarian State Government

  6. 2009/2010

    100 apartments of the city of Pegnitz (Blumenstraße) equipped with central heating/heat pumps

  7. 2010

    Modernization of Old Palace Pegnitz (sanitary, heating, ventilation)

  8. 2013

    Hygiene training according to VDI/DVGW 6023 and examination for Certified Sampler

  9. 2015

    38 residential units in Konradsreuth bei Hof equipped with central heating

  10. 2018

    Installation work at Pegnitz health center (approx. 1,500 m pipelines)

  11. 2021

    Fourth heat pump system 'Biblock' (Weishaupt) commissioned in Pegnitz

  12. 2024

    Mario Lang becomes managing director

  13. 2026

    Company premises renovated and expanded

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account