Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
GLS Energie – Fertigung

Planning and construction of energy technology infrastructure: Photovoltaics, grid construction, plant construction, traffic technology, and fiber optic technology.

GLS Energie Logo

GLS Energie GmbH

4060 Leonding (Headquarters) · 4320 Perg (Legal Department)New on Amplifa

2012Founded
2Locations in Austria
ÖsterreichSupply/Service Area

About GLS Energie

GLS Energie GmbH is an independent sister company of GLS Bau und Montage GmbH, founded in 2012, with its headquarters in Leonding, Upper Austria. The company operates as an energy technology infrastructure and full-service provider, covering the entire value chain from design and planning through execution to maintenance and upkeep. Core business areas include photovoltaic systems (ground-mounted and rooftop systems), grid construction and overhead lines (including 20-kV to 110-kV projects), electrical and plant construction with low-voltage switchgear, high and medium-voltage distributions, transformers and grid replacement systems, as well as traffic technology, civil engineering, and fiber optic and data technology (fiber optic splicing technology, FTTH). Customers come from energy infrastructure, transport and highway infrastructure, telecommunications, public sector, industry, and water supply, including Asfinag, Tauernwindpark, and Water Supply Linz. Quality is ensured by a certified quality management system according to ÖNORM EN ISO 9001 and RoHS compliance. Projects are planned and coordinated from Leonding and realized nationwide in Austria.

Site
Leonding
Processes
Photovoltaic Systems (Construction of PV systems, ground-mounted and rooftop systems), Industrial interior lighting, effect lighting, and LED street lighting (Installation), Grid construction and overhead line construction (including 20-kV and 30-kV overhead lines, tower, Electrical and plant construction (Planning, execution, maintenance, upkeep), General electrical installations, Low-voltage switchgear, High and medium-voltage distributions, Transformers
Materials
Photovoltaic Systems, Grid Construction and Overhead Lines, Electrical and Plant Construction, Traffic Technology, Civil Engineering, Fiber Optic and Data Technology, Lighting
Certificates
ÖNORM EN ISO 9001, RoHS Compliance
Founded
2012
Industries
Energy Infrastructure, Traffic/Infrastructure (Motorway, Tunnel), Telecommunications/Broadband, Public Sector, Industry, Water Supply
  1. 01

    Design and Planning

  2. 02

    Civil Engineering and Cable Laying

  3. 03

    Electrical and Plant Construction (Installation)

  4. 04

    Commissioning

  5. 05

    Maintenance and Upkeep

Services and Procedures

PV

Photovoltaic Systems

Construction of ground-mounted and rooftop systems, including on motorway enclosures and industrial roofs.

NW

Grid Construction and Overhead Lines

Construction of 20-kV to 110-kV grids including tower changes and wiring.

AB

Electrical and Plant Construction

Low-voltage switchgear, high and medium-voltage distributions, transformers, grid replacement systems, as well as strong and weak current installations.

VT

Traffic Technology

Traffic control systems, sign bridges, emergency call systems, tunnel radio, and barrier systems.

TB

Civil Engineering

Excavation work, trenchless cable laying, horizontal drilling, and foundations for masts and traffic sign bridges.

LWL

Fiber Optic and Data Technology

Fiber optic splicing and measurement technology, backbone and FTTH connections, and structured cabling.

BE

Lighting

Industrial interior lighting, effect lighting, and LED street lighting.

Locations

Standort Leonding

Leonding

AT

Headquarters: Office, warehouse, and assembly hall, outdoor storage; Design and Coordination

Perg

AT

Legal Department / Original founding site

Projects and Plants

PV System Motorway Enclosure Trebesing (2200 Panels)
PV System Motorway Enclosure Trebesing (2200 Panels)Photovoltaics · Traffic/Infrastructure
PV Ground-Mounted System Allerheiligen
PV Ground-Mounted System AllerheiligenPhotovoltaics · Energy Infrastructure
Photovoltaics Cooling Hall Linz
Photovoltaics Cooling Hall LinzPhotovoltaics · Industry
Power Poles Grid Construction Erlaufboden
Power Poles Grid Construction ErlaufbodenGrid Construction/Overhead Lines · Energy Infrastructure
SOTRA Storage Area A2 Vösendorf
SOTRA Storage Area A2 VösendorfTraffic Technology · Traffic/Infrastructure
Building Technology Substation Reith near Seefeld
Building Technology Substation Reith near SeefeldElectrical and Plant Construction · Energy Infrastructure
Fiber Optic and Data Technology
Fiber Optic and Data TechnologyF/FTTH · Telecommunications
Electrical and Plant Construction
Electrical and Plant ConstructionPlant Construction · Industry
Traffic Technology
Traffic TechnologyTraffic Technology · Traffic/Infrastructure

Inside the production

Energy Technology Infrastructure Project Execution
Energy Technology Infrastructure Project Execution
Tower Changes and Overhead Line Construction
Tower Changes and Overhead Line Construction
Plant Construction on Site
Plant Construction on Site
Switchgear and Plant Technology
Switchgear and Plant Technology
Aerial View of Project Site
Aerial View of Project Site

Industries

Energy InfrastructureTraffic/Infrastructure (Motorway, Tunnel)Telecommunications/BroadbandPublic SectorIndustryWater SupplyRenewable Energies

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Photovoltaic Systems (Construction of PV systems, ground-mounted and rooftop systems)Installation–––––
Industrial interior lighting, effect lighting, and LED street lighting (Installation)Installation–––––
Grid construction and overhead line construction (including 20-kV and 30-kV overhead lines, towerInstallation–––––
Electrical and plant construction (Planning, execution, maintenance, upkeep)Installation–––––
General electrical installationsInstallation–––––
Low-voltage switchgearInstallation–––––
High and medium-voltage distributionsInstallation–––––
TransformersInstallation–––––
Central power supply systemsInstallation–––––
Strong and weak current installationsInstallation–––––
Pump stationsInstallation–––––
Grid replacement systemsInstallation–––––
Construction electricity connectionsInstallation–––––
Maintenance and service servicesInstallation–––––
Traffic technology (Traffic control systems VBA, sign bridges, information displays,)Installation–––––
Civil engineering (Excavation work, cable ducts, trenchless cable laying, horizontal drilling,)Engineering–––––
Fiber optic and data technology (Fiber optic splicing and measurement technology, backbone and FTTHInstallation–––––
Design, planning, and coordination of projects (Full-service energy technology infrastructure)Engineering–––––

Additional services

PhotovoltaicsLighting (Industrial, Effect, LED Street Lighting)Grid Construction and Overhead LinesElectrical and Plant ConstructionTraffic TechnologyCivil EngineeringFiber Optic and Data TechnologyLow-Voltage SwitchgearHigh and Medium-Voltage DistributionsTransformersGrid Replacement SystemsMaintenance and UpkeepConstruction Electricity ConnectionsFiber Optic Splicing and Measurement TechnologyFTTH ConnectionTrenchless Cable LayingHorizontal DrillingConstruction of Switchhouses

Reference customers

AsfinagTauernwindparkWindpark EdmundshofWater Supply LinzFreistädter BierMauthausen MemorialWellnessoase Hummelhof

Quality

Consistent quality in design, execution, and support is ensured by a certified quality management system according to ÖNORM EN ISO 9001 and RoHS compliance.

EvidenceLeonding
ÖNORM EN ISO 9001
RoHS Compliance

History

  1. 2012

    Founding of GLS Energie GmbH with its seat in Perg as an independent sister company of GLS Bau und Montage GmbH.

  2. 2013

    Acquisition of the grid construction business area from GLS Bau und Montage GmbH.

  3. 2016

    Relocation of the headquarters and taking occupancy of the new central facility in Leonding with office, warehouse, and assembly hall as well as outdoor storage.

  4. 2024

    Implementation of the largest PV system of Asfinag on the Trebesing enclosure (A10) with 2200 PV panels.

  5. 2025

    Overhead line abstraction of the 20-kV overhead line in the Ötschergräben.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo